Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20249B697 + (17:22:45, 16 March 2025)
- ML20249B695 + (17:22:49, 16 March 2025)
- IR 05000331/1998006 + (17:22:51, 16 March 2025)
- ML20249B688 + (17:22:56, 16 March 2025)
- ML20249B686 + (17:23:01, 16 March 2025)
- ML20249B684 + (17:23:06, 16 March 2025)
- IR 05000454/1998004 + (17:23:22, 16 March 2025)
- IR 05000341/1998007 + (17:23:28, 16 March 2025)
- IR 05000334/1998080 + (17:23:35, 16 March 2025)
- NUREG-0430, Seeks Commission Approval of Proposed Rev to Process for Declassification & Release of Inventory Difference Data Used in Annual NUREG-0430 Rept + (17:23:36, 16 March 2025)
- ML20249B604 + (17:23:58, 16 March 2025)
- ML20249B602 + (17:24:20, 16 March 2025)
- ML20249B596 + (17:24:28, 16 March 2025)
- ML20249B593 + (17:24:32, 16 March 2025)
- ML20249B587 + (17:24:36, 16 March 2025)
- ML20249B574 + (17:24:43, 16 March 2025)
- ML20249B570 + (17:24:46, 16 March 2025)
- L-98-123, Provides Response to 980602 Telcon RAI Re LARs 218 & 85, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors.Supplemental LAR Will Be Submitted Following Required Reviews + (17:25:03, 16 March 2025)
- 05000327/LER-1998-001-04, :on 980519,automatic Reactor Trip Occurred. Caused by Failure of Alternate Feedwater to 1A1-A 480-volt Shutdown Board.Normal Feedwater Breaker Placed in Svc & 480- Volt Shutdown Board Returned to Operation + (17:25:10, 16 March 2025)
- TAC:M98803 + (17:25:12, 16 March 2025)
- ML20249B520 + (17:25:18, 16 March 2025)
- ML20249B509 + (17:25:26, 16 March 2025)
- ML20249B503 + (17:25:31, 16 March 2025)
- ML20249B501 + (17:25:34, 16 March 2025)
- 05000352/LER-1998-008-01, Forwards LER 98-008-01 Re Pressure Setpoint Drift of Thirteen Main Steam Sys SRVs Primarily Caused by Corrosion Induced Bonding within SRVs + (17:25:46, 16 March 2025)
- ML20249B483 + (17:25:53, 16 March 2025)
- IR 05000354/1998003 + (17:25:55, 16 March 2025)
- TAC:M92241 + (17:25:59, 16 March 2025)
- ML20249B465 + (17:26:02, 16 March 2025)
- DD-98-06, Directors Decision DD-98-06 Under 10CFR2.206.Petitioner Requested That NRC Take Action Re Concerns About Ability of Plant SGs to Withstand Major Seismic Event.Petitioner Requested Action Denied + (17:26:05, 16 March 2025)
- ML20249B431 + (17:26:26, 16 March 2025)
- 05000336/LER-1998-011-01, :on 980519,determined That Valves Had Been Closing Completely Under No Flow Conditions.Caused by Improper Valve Setup & Failure to Verify Adequate Valve Closure.Valves Disassembled + (17:26:33, 16 March 2025)
- ML20249B396 + (17:26:39, 16 March 2025)
- 05000325/LER-1998-003-02, :on 980515,identified That Four of Eleven SRVs Exceeded TS Setpoint Limits.Cause of Setpoint Drift Being Evaluated.Srv Pilot Valve Assemblies Replaced W/Certified Spares Prior to Startup of Unit 1 + (17:26:41, 16 March 2025)
- 05000368/LER-1998-002-04, :on 980520,EFAS Automatically Actuated to Maintain Water Level in a Sg.Caused by Inadequate self- Checking of Plant Response by Control Room Operations Personnel.Operations Personnel Counseled + (17:26:43, 16 March 2025)
- ML20249B382 + (17:26:48, 16 March 2025)
- 05000285/LER-1998-005, :on 980520,161 Kv Transmission Line Circuit Breakers Tripped.Caused by Inappropriate Actuation of Deluge Sys for Transformer T1A-3.Transformer T1A-3 Was Checked to Ensure No Damage to Transformer Occurred + (17:26:57, 16 March 2025)
- IR 05000219/1998080 + (17:26:58, 16 March 2025)
- 05000277/LER-1998-003-01, :on 980513,failure to Meet TS for Main Control Room Emergency Ventilation,Was Identified.Caused by Failure to Follow GP-25 Procedure Guidance.Main Control Room Emergency Ventilation Relays Inspected for Loose Screws + (17:27:03, 16 March 2025)
- 05000277/LER-1997-010, :on 971229,failure of 2A Reactor Feedpump Turbine to Trip,Occurred.Caused by Main Control Room pushbutton.2A RFPT Trip Device Repaired,Reinstalled & Tested to Prove Operability + (17:27:05, 16 March 2025)
- 05000368/LER-1998-003-01, :on 980520,determined That Surveillance of Control Element Assembly Position Was Not Being Performed for One Control Element Assembly Group,Per Ts.Caused by Inadequate Verification.Change Implemented + (17:27:10, 16 March 2025)
- 05000277/LER-1997-009-01, Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys + (17:27:18, 16 March 2025)
- IR 05000155/1998003 + (17:27:31, 16 March 2025)
- ML20249B302 + (17:27:33, 16 March 2025)
- TXX-9814, Forwards Monthly Operating Repts for May 1998 for CPSES, Units 1 & 2.During Reporting Period,No Failures or Challenges to PORVs of SVs Occurred + (17:27:43, 16 March 2025)
- 05000423/LER-1998-030, :on 980515,noted That Channel Calibr of Hydrogen Recombiners Did Not Meet Requirements of SR 4.6.4.2.b.Caused by Deficient Initial or Subsequent Reviews. Modified Hydrogen Recombiner Channel Calibr Procedures + (17:27:48, 16 March 2025)
- ML20249B244 + (17:27:51, 16 March 2025)
- IR 05000245/1998206 + (17:28:03, 16 March 2025)
- 05000293/LER-1998-010, :on 980514,inadequate Surveillance Was Performed for Containment Cooling Flow Rate.Caused by Failure to Consider All safety-related Modes of Operation for Pump Sys.Problem Rept Was Written + (17:28:11, 16 March 2025)
- ML20249B175 + (17:28:18, 16 March 2025)
- ML20249B108 + (17:28:36, 16 March 2025)