Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080B798 + (03:30:52, 15 December 2024)
- ML20080B791 + (03:30:53, 15 December 2024)
- ML20080B787 + (03:30:54, 15 December 2024)
- ML20080B783 + (03:30:54, 15 December 2024)
- ML20080B777 + (03:30:55, 15 December 2024)
- ML20080B781 + (03:30:55, 15 December 2024)
- 05000277/LER-1983-028-03, /03L-0:on 831223,while Performing Surveillance Testing,Hpsw Pump 2B Declared Inoperable Due to Low Flow. Caused by Internal Wear to Valve Disc Pin & Arm.Parts Replaced + (03:30:57, 15 December 2024)
- ML20080B762 + (03:30:58, 15 December 2024)
- ML20080B765 + (03:30:58, 15 December 2024)
- 05000336/LER-1994-033, :on 941031,loss of Containment Integrity Discovered During Course of Irradiated Fuel Movement within Containment.Caused by Failed Ventilation Exhaust Damper.Fuel Movement Stopped + (03:31:00, 15 December 2024)
- 05000336/LER-1994-035, :on 941102,discovered That Roving Fire Watch Established for Breached Electrical Penetration When Requirement for Continuous Fire Watch.Caused by Personnel Error.Continuous Fire Watch Established + (03:31:02, 15 December 2024)
- ML20080B752 + (03:31:03, 15 December 2024)
- ML20080B749 + (03:31:03, 15 December 2024)
- 05000321/LER-1994-013, :on 941103,false Low Turbine Speed Signal Resulted in Inoperable HPCI Sys.Caused by Failure or Misadjustment of Turbine Magnetic Speed Pickup.Magnetic Speed Pickup Replaced + (03:31:05, 15 December 2024)
- ML20080B744 + (03:31:06, 15 December 2024)
- ML20080B738 + (03:31:07, 15 December 2024)
- ML20080B739 + (03:31:07, 15 December 2024)
- ML20080B733 + (03:31:08, 15 December 2024)
- ML20080B729 + (03:31:09, 15 December 2024)
- ML20080B726 + (03:31:10, 15 December 2024)
- ML20080B704 + (03:31:10, 15 December 2024)
- ML20080B687 + (03:31:11, 15 December 2024)
- ML20080B674 + (03:31:12, 15 December 2024)
- ML20080B680 + (03:31:12, 15 December 2024)
- ML20080B666 + (03:31:13, 15 December 2024)
- ML20080B660 + (03:31:14, 15 December 2024)
- ML20080B654 + (03:31:15, 15 December 2024)
- ML20080B648 + (03:31:15, 15 December 2024)
- 05000265/LER-1984-002-02, :on 840106,both Distribution Panels Inadvertently Deenergized Simultaneously,Causing Reactor Scram.Caused by Cognitive Error on Part of Engineer.Scram Reset.No Corrective Action Necessary + (03:31:17, 15 December 2024)
- ML20080B640 + (03:31:18, 15 December 2024)
- ML20080B636 + (03:31:19, 15 December 2024)
- ML20080B632 + (03:31:19, 15 December 2024)
- 05000395/LER-1984-001, :on 831223-27 & 29,daily Grab Samples of Svc Effluent Not Taken.Caused by Personnel Error.Individual Disciplined.Separate List of Daily,Weekly & Monthly Tech Spec Requirements Being Generated + (03:31:21, 15 December 2024)
- ML20080B598 + (03:31:25, 15 December 2024)
- ML20080B589 + (03:31:26, 15 December 2024)
- NRC-84-0024, Forwards Addl Info to Resolve Power Sys Branch SER Licensing Confirmatory Issues Re Physical Separation of Load Shedder & Emergency Load Sequencer Panels,Reliability of Panels & Separation of Redundant Offsite Power Sys Circuits + (03:31:26, 15 December 2024)
- ML20080B587 + (03:31:27, 15 December 2024)
- ML20080B579 + (03:31:28, 15 December 2024)
- ML20080B585 + (03:31:28, 15 December 2024)
- ML20080B564 + (03:31:29, 15 December 2024)
- ML20080B563 + (03:31:30, 15 December 2024)
- 05000443/LER-1994-017, :on 941102,insp of Cooling Basin Revealed Two Degraded Column Flange Bolts on Cooling Tower Svc Water Pump 1SW-P-110A.Caused by Bolt Mfg Failure to Perform Adequate Heat Treatment.Suspect Bolting Matl Replaced + (03:31:32, 15 December 2024)
- 05000311/LER-1983-067-03, /03L-0:on 831231,during Surveillance Testing, Diesel Generator 2B Experienced Fuel Oil Leak on Cylinder Injector 8R.Caused by Fuel Oil Manifold to Injector Gasket Leakage.Gasket Replaced + (03:31:35, 15 December 2024)
- ML20080B555 + (03:31:36, 15 December 2024)
- 3F1194-10, Submits Preliminary Results of Refuel 9 OTSGs Tube Pull,Per Commitment in Response to 940426 Cal,Item 8.Preliminary Rept, Exam of Crystal River-3 Pulled SG Tubes Encl.Final Rept Will Be Provided by 950531 + (03:31:37, 15 December 2024)
- ML20080B553 + (03:31:37, 15 December 2024)
- ML20080B547 + (03:31:38, 15 December 2024)
- ML20080B546 + (03:31:38, 15 December 2024)
- ML20080B544 + (03:31:39, 15 December 2024)
- ML20080B540 + (03:31:40, 15 December 2024)
- ML20080B541 + (03:31:40, 15 December 2024)