Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N10-0355, Salem/Operations, S1.OP-AB.FUEL-0001(Q), Rev. 4, Fuel Handling Incident. + (11:40:21, 15 August 2018)
- LR-N10-0355, Salem/Operations, S1.OP-AB.CW-0001(Q), Rev. 30, Circulation Water System Malfunction. + (11:41:34, 15 August 2018)
- LR-N10-0355, Salem/Operations, S1.OP-AB.CR-0001(Q), Rev. 17, Control Room Evacuation. + (11:41:46, 15 August 2018)
- LR-N10-0355, Salem/Operations, S1.OP-AB.CONT-0001(Q), Rev. 13, Containment Closure. + (11:42:07, 15 August 2018)
- LR-N10-0355, Salem/Operations, S1.OP-AB.CR-0002(Q), Rev. 24, Control Room Evacuation Due to Fire in the Control Room, Relay Room, 460/230V Switchgear Room, or 4KV Switchgear Room. + (11:43:04, 15 August 2018)
- LR-N10-0355, Salem/Operations, S1.OP-AB.ANN-0001(Q), Rev. 24, Loss of Overhead Annunciator System. + (11:45:57, 15 August 2018)
- LR-N10-0355, SI.IC-CC.RCP-0070(Q), Rev. 15, 1PT-403 Reactor Coolant System Hot Leg Pressure Channel Ii. + (11:46:53, 15 August 2018)
- LR-N10-0355, OU-AA-103, Rev. 15, Shutdown Safety Management Program. + (11:47:08, 15 August 2018)
- LR-N10-0355, OP-AA-108-111-1001, Rev. 5, Severe Weather and Natural Disaster Guidelines. + (11:47:55, 15 August 2018)
- LR-N10-0355, EP Section 7, Communications. + (11:48:04, 15 August 2018)
- LR-N10-0355, CY-AA-170-500, Rev. 0, Meteorological Monitoring System Calibration and Maintenance. + (11:49:03, 15 August 2018)
- LR-N10-0355, Salem/Operations, 2-EOP-TRIP-1, Rev. 27, Reactor Trip or Safety Injection. + (11:51:34, 15 August 2018)
- LR-N10-0355, Salem, 2-EOP-LOPA-1, Rev. 26, Loss of All AC Power. + (11:52:50, 15 August 2018)
- LR-N10-0355, Salem, 2-EOP-FRSM-1, Rev. 24, Response to Nuclear Power Generation. + (11:53:42, 15 August 2018)
- LR-N10-0355, Salem, EAL Technical Bases Supporting Documents + (11:56:15, 15 August 2018)
- LR-N10-0355, Salem, EAL Comparison Matrix + (11:57:10, 15 August 2018)
- LR-N10-0355, EP-SC-111-200, Salem, Event Classification Guide Emergency Action Level Technical Bases. + (11:59:27, 15 August 2018)
- LR-N10-0355, EP-SC-1 11-200, Salem, Event Classification Guide, Emergency Action Level Technical Bases. + (12:01:23, 15 August 2018)
- LR-N10-0355, Hope Creek, Bases Figure B 3/4 3-1, Reactor Vessel Water Level. + (12:01:43, 15 August 2018)
- LR-N10-0355, Hope Creek, SY-AA-101-132, Rev. 11, Threat Assessment. + (12:01:59, 15 August 2018)
- LR-N10-0355, Hope Creek, OU-AA-103, Rev. 15, Shutdown Safety Management Program. + (12:02:45, 15 August 2018)
- LR-N10-0355, Hope Creek, OP-HC-108-115-1001, Rev. 10, Operability Assessment and Equipment Control Program. + (12:03:33, 15 August 2018)
- LR-N10-0355, Hope Creek, OP-AA-108-111-1001, Rev. 5, Severe Weather and Natural Disaster Guidelines. + (12:03:42, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.RP.AR.SP-001(Q) - Rev. 17, Radiation Monitoring System Alarm Response. + (12:05:48, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. + (12:05:58, 15 August 2018)
- ML110060151 + (12:06:58, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-IO.ZZ-0008(Q), Rev. 29, Shutdown from Outside Control Room. + (12:07:07, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-IO.ZZ-0005(Q), Rev. 30, Cold Shutdown to Refueling. + (12:07:15, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-IO.ZZ-0004(Q), Rev. 82, Shutdown from Rated Power to Cold Shutdown. + (12:07:28, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-GP.ZZ-0005(Q), Rev. 8, Drywell Leakege Source Detection. + (12:07:37, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-EO.ZZ-0318(Q), Rev. 6, Containment Venting. + (12:07:46, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0024(Q), Rev. 7, Crids Computer Points Book 5 D3624 Thru D4288 + (12:08:00, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0019(Q), Rev. 17, Overhead Annunciator Window Box E6 + (12:08:09, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0016(Q), Rev. 14, Overhead Annunciator Window Box E3 + (12:08:18, 15 August 2018)
- ML110060058 + (12:09:19, 15 August 2018)
- ML110060046 + (12:09:39, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0014(Q), Rev. 29, Overhead Annunciator Window Box D3 + (12:13:21, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0012(Q), Rev. 15, Overhead Annunciator Window Box C8 + (12:15:02, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0011(Q), Rev. 53, Overhead Annunciator Window Box C6 + (12:15:15, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0010(Q), Rev. 14, Overhead Annunciator Window Box C5 + (12:15:25, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0008(Q), Rev. 38, Overhead Annunciator Window Box C1 + (12:15:51, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0006(Q), Rev. 25, Overhead Annunciator Window Box B1 + (12:16:03, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 + (12:16:53, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AM.ZZ-0001(Z), Rev. 1, Severe Accident Guidelines + (12:17:25, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction + (12:17:35, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.ZZ.0135(Q), Rev. 29, Station Blackout/Loss of Offsite Power/Diesel Generator Malfunction + (12:17:50, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling + (12:18:01, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations + (12:18:58, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer + (12:19:47, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature + (12:19:58, 15 August 2018)
- LR-N10-0355, Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System + (12:21:15, 15 August 2018)