Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML082250290 + (19:04:33, 14 November 2019)
- LIC-08-0087, Announcement of New Site Vice President at Fort Calhoun Station + (19:04:51, 14 November 2019)
- SBK-L-08136, Final Response and Notice of Completion for NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (19:10:00, 14 November 2019)
- NL-08-1092, Plants, Transmittal of Response to Request for Additional Information NRC Bulletin 2007-01 - Security Officer Attentiveness + (19:11:16, 14 November 2019)
- ML082200727 + (19:11:40, 14 November 2019)
- NLS2008057, Response to Request for Additional Information NRC Bulletin 2007-01, Security Officer Attentiveness + (19:17:55, 14 November 2019)
- NOC-AE-08002319, Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C + (19:21:19, 14 November 2019)
- NL-08-1155, Supplemental Response to NRC Generic Letter 2004-02 + (19:22:41, 14 November 2019)
- NL-08-0818, Generic Letter 2004-02 Response Extension Request + (19:22:49, 14 November 2019)
- NL-08-1195, Generic Letter 2004-02 Response Extension Request + (19:23:15, 14 November 2019)
- RA-08-068, Amergen Energy Company, LLC, Response to the Request for Additional Information Regarding Resolution of NRC Bulletin 2007-01, Security Officer Attentiveness. + (19:23:43, 14 November 2019)
- RNP-RA/08-0071, Committed Actions Related to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. + (19:24:54, 14 November 2019)
- LR-N08-0132, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. + (19:26:30, 14 November 2019)
- ML15236A151 + (19:32:27, 14 November 2019)
- ML15236A040 + (19:32:49, 14 November 2019)
- FOIA/PA-2014-0204 + (19:36:04, 14 November 2019)
- NL-08-119, Proprietary Review of Audit Report for the Corrective Actions Associated with Generic Letter 2004-02 + (19:39:54, 14 November 2019)
- ML15224A761 + (19:40:08, 14 November 2019)
- ML15224A755 + (19:40:31, 14 November 2019)
- ML082060656 + (19:40:57, 14 November 2019)
- NOC-AE-08002331, Pressurizer Nozzle Safe End Weld Overlays: Completion of Confirmatory Action Letter Commitments + (19:46:54, 14 November 2019)
- ML081980652 + (19:55:16, 14 November 2019)
- ML081980508 + (19:55:31, 14 November 2019)
- RS-08-088, Notice of Completion of Activities Related to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (19:55:46, 14 November 2019)
- ML081970381 + (19:57:50, 14 November 2019)
- LR-N08-0139, Request for Extension to Complete Generic Letter 2004-02 Testing + (20:05:11, 14 November 2019)
- ML15211A277 + (20:05:13, 14 November 2019)
- ML15210A673 + (20:11:20, 14 November 2019)
- ML081850387 + (20:11:41, 14 November 2019)
- ULNRC-05521, Request for Extension of Corrective Actions Completion Date for NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (20:16:31, 14 November 2019)
- ML081830756 + (20:16:56, 14 November 2019)
- NOC-AE-08002318, Inservice Inspection Summary Report - 1RE14 + (20:18:13, 14 November 2019)
- GNRO-2008/00050, Clarification of Commitment in Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (20:19:58, 14 November 2019)
- ML15205A207 + (20:27:48, 14 November 2019)
- NOC-AE-08002316, Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump + (20:30:53, 14 November 2019)
- ML15197A147 + (20:31:45, 14 November 2019)
- NOC-AE-08002326, Advance Notification of Intent to Pursue Operating License Renewal + (20:33:12, 14 November 2019)
- NOC-AE-08002311, Withdrawal of Relief Request (RR-ENG-2-50) + (20:35:48, 14 November 2019)
- NOC-AE-08002323, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) + (20:35:54, 14 November 2019)
- NOC-AE-08002315, Withdrawal of Proposed Amendment to Technical Specification 3.8.3.1 + (20:36:01, 14 November 2019)
- NOC-AE-08002301, Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program + (20:41:01, 14 November 2019)
- NOC-AE-08002314, Submittal of Operations Quality Assurance Plan Change QA-067 + (20:48:37, 14 November 2019)
- NRC 2008-0038, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (20:53:03, 14 November 2019)
- NOC-AE-08002308, Request for Relief from ASME Code Case N-498-4, Alternative Requirements for 10-Year System Hydrostatic Testing for Class 1, 2 and 3 Systems, Section XI, Division 1 (RR-ENG-2-51) + (20:54:02, 14 November 2019)
- NOC-AE-08002313, Revision to Nuclear Regulatory Commission Distribution List + (20:54:08, 14 November 2019)
- FOIA/PA-2015-0005 + (21:04:39, 14 November 2019)
- NOC-AE-08002304, Response to Request for Additional Information on Proposed Amendment Related to Risk-Informed Initiative 5b (TAC Nos. MD7058 & MD7059) + (21:06:42, 14 November 2019)
- NL-08-0481, Three-Month Response to NRC Generic Letter 2008-01 + (21:07:36, 14 November 2019)
- NOC-AE-08002283, Updated Final Safety Analysis Report, Revision 14, List of Effective Pages + (21:12:59, 14 November 2019)
- NOC-AE-08002293, Response to Request for Additional Information: Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-49) + (21:20:07, 14 November 2019)
- NL-08-0769, Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4. Refueling Water Storage Tank (Rwst). + (21:20:30, 14 November 2019)