Other: ML070810264, NOC-AE-06002076, Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43), NOC-AE-06002085, Summary Assessment of Pressurizer Surge Line Weld Overlay; Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423), NOC-AE-07002161, Weld Overlay Examination Results (RR-ENG-2-43), NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43), NOC-AE-08002297, Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423), NOC-AE-08002323, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)
|
MONTHYEARNOC-AE-06002000, Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)2006-05-0101 May 2006 Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) Project stage: Request NOC-AE-06002055, Response to NRC Request for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of Weld Overlay (RR-ENG-2-43)2006-08-22022 August 2006 Response to NRC Request for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of Weld Overlay (RR-ENG-2-43) Project stage: Response to RAI NOC-AE-06002066, Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)2006-09-19019 September 2006 Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) Project stage: Request NOC-AE-06002068, Response to Request for Additional Information: Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43)2006-09-28028 September 2006 Response to Request for Additional Information: Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) Project stage: Response to RAI NOC-AE-06002076, Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43)2006-11-0101 November 2006 Examination Results of a Pressurizer Nozzle Safe-End Weld Overlay (RR-ENG-2-43) Project stage: Other NOC-AE-06002085, Summary Assessment of Pressurizer Surge Line Weld Overlay; Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423)2006-11-29029 November 2006 Summary Assessment of Pressurizer Surge Line Weld Overlay; Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423) Project stage: Other ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) Project stage: Other NOC-AE-07002161, Weld Overlay Examination Results (RR-ENG-2-43)2007-05-0101 May 2007 Weld Overlay Examination Results (RR-ENG-2-43) Project stage: Other NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)2007-05-29029 May 2007 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) Project stage: Other NOC-AE-08002297, Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423)2008-04-29029 April 2008 Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423) Project stage: Other NOC-AE-08002323, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)2008-06-18018 June 2008 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) Project stage: Other 2006-09-28
[Table View] |
Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)ML081760284 |
Person / Time |
---|
Site: |
South Texas ![STP Nuclear Operating Company icon.png](/w/images/9/9c/STP_Nuclear_Operating_Company_icon.png) |
---|
Issue date: |
06/18/2008 |
---|
From: |
Jenewein B South Texas |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
NOC-AE-08002323, TAC MD1414, TAC MD1415, TAC MD1416, TAC MD1417, TAC MD1418, TAC MD1419, TAC MD1420, TAC MD1421, TAC MD1422, TAC MD1423 |
Download: ML081760284 (5) |
|
|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Teas Pro/ectElectric GeneratingStation P.O Box 289 Wadsworth Texas 77483 -
June 18, 2008 NOC-AE-08002323 File No.: G25 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attention: Document-Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Unit 1 Docket No. STN 50-498 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays:
Shrinkage and Fati-que Crack Growth (RR-ENG-2-43) (TAC Nos. MD1414-1423)
References:
- 1) Letter dated November 29, 2006, from M. J. Berg, STPNOC, to NRC S,,Document Control Desk, "Summary Assessment of Pressurizer Surge Line Weld Overlay: -Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)
(TAC Nos. MD1414-1423)" (ML063450122)
- 2) Letter dated September 28, 2006, from David W. Rencurrel, STPNOC, to NRC Document Control Desk, "Response to Request' for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) (TAC Nos. MD1414-1423)"
(ML062850090)
Pursuant to 10 CFR 50.55a(a)(3)(i), the STP Nuclear Operatinb Company (STPNOC) requested approval to use an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI for the structural weld overlays on the South Texas Project Unit 1 and Unit 2 pressurizer spray, relief, safety, and surge nozzle safe-ends. NRC approval to perform the structural weld overlays in Unit 1 was given April 2, 2007. The surge nozzle weld overlay was performed during Unit 1 refueling outage 1RE13, and shrinkage and fatigue crack growth are addressed in Reference 1.' The pressurizer spray, relief, and safety nozzle safe-end overlays were performed during the April 2008 Unit 1 refueling outage (1 RE1 4).
STPNOC completed a stress analysis of the pressurizer spray, relief, and safety nozzle safe-ends pre-emptive weld overlays prior to restart of Unit 1. A summary of the results is attached.
,The stress analysis results support the conclusion that structural weld overlays are a suitable pre-emptive measure for anticipated flaw development.
This supplement to the request fulfills commitments made in Reference 2. Mitigative weld overlays for the pressurizer nozzle safe ends in Unit 1 and Unit 2 are complete.
There are no commitments in this submittal.
STI: 32326414 7
NOC-AE-08002323 Page 2 of 2 If there are any questions, please contact either Mr. Philip L. Walker at (361) 972-8392 or me at (361) 972-7431.
eingg/ rog rams PLW
Attachment:
Summary Assessment of Pressurizer Spray, Relief, and Safety Nozzle Safe-End Weld Overlays: Shrinkage and Fatigue Crack Growth
NOC-AE-08002323 Page 3 of 3 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV Thad Hill U. S. Nuclear Regulatory Commission Catherine Callaway 612 East Lamar Blvd., Suite 400 Jim von Suskil Arlington, Texas 76011-4125 NRG South Texas LP Mohan C. Thadani A. H. Gutterman, Esquire Senior Project Manager Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission One White Flint North (MS 7 D1) Mohan) C. Thadani 11555 Rockville Pike U. S. Nuclear Regulatory Commission Rockville MD 20852 Richard A. Ratliff J. J. Nesrsta Bureau of Radiation Control R. K. Temple Texas Department of State Health Services K. M. Polio 1100 West 49th Street E. Alarcon Austin, TX 78756-3189 City Public Service C. M. Canady C. Kirksey City of Austin City of Austin Electric Utility Department 721 Barton Springs Road Jon C. Wood Austin, TX 78704 Cox Smith Matthews Senior Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483
Attachment NOC-AE-08002323 Page 1 of 2 South Texas Project Unit 1 Summary Assessment of Pressurizer Spray, Relief, and Safety Nozzle Safe-End Weld Overlays:,
Shrinkage and Fatigue Crack Growth Shrinkage Assessment:
Calculated Limits on design stress due to shrinkage were determined prior to completing the weld overlay.
The limits were calculated using WESTDYN 7.1, a program acceptable for use in piping analysis, with an assumed pipe temperature of 70°F. A displacement of 0.25-inch was applied to the pressurizer safe end as cold spring loading for the spray nozzle. This displacement is assumed as the main loading input to represent shrinkage due to the nozzle weld overlay.
The resulting bending stress for the spray nozzle as determined by computer calculations is 13,089 psi. The code allowable stress for this piping at 70°F is 2Sm = 32,000 psi.
Consequently, the piping qualifies under code stress requirements where shrinkage does not exceed 0.25-inch.
Actual Actual shrinkage measured at 90° intervals around the circumference of the spray nozzle weld overlay is 0.203 inch. This shrinkage results in an applied stress of 10,628 psi compared to the Code allowable of 32,000 psi.
The maximum shrinkage measured at 900 increments around the circumference of the three Safety nozzles and the Relief nozzle following the overlay is 0.263-inch on safety nozzle N3.
The highest applied bending stress experienced due to shrinkage is 30,589 psi on safety nozzle N4B, compared to the code allowable stress 2Sm = 40,000 psi for this piping at 70°F.
Therefore, the three Safety nozzles and the Relief Valve Inlet piping meet the allowable code stresses.
Pressurizer Maximum Applied Code Nozzle Shrinkage Stress Allowable Spray Nozzle N2 0.203 inch 10,628 psi* 32,000 psi Safety Nozzle N3 0.263 inch 21,190 psi 40,000 psi Relief Nozzle N4A 0.181 inch 16,653 psi 40,000 psi Safety Nozzle N4B 0.219 inch 30,593 psi 40,000 psi Safety Nozzle N4C 0.248 inch 21,559 psi 40,000 psi
- This stress value was determined as a ratio of the actual shrinkage to the assumed shrinkage (0.25-inch).
Attachment NOC-AE-08002323 Page 2 of 2 In addition, the calculated stress in the unreinforced fabricated tee in the Relief piping determined by applying a Stress Intensification Factor (SIF) is 23,057 psi. The code allowable stress for this piping at 70°F is 2Sm = 28,200 psi. Therefore, the code stress limitation is not exceeded.
The design pressure and normal operating pressure are 2,485 psig and 2,235 psig, respectively. With the additional stress provided by the structural weld overlay, the total stresses remain significantly below the code allowable stress. Because the piping is designed for significantly more shrinkage and still satisfy code design requirements, the actual shrinkage experienced results in even greater safety margin.
Fatigue crack growth assessment:
WCAP-16611-P, "South Texas Units 1 and 2 Pressurizer Safety/Relief, Spray, and Surge Nozzles Structural Weld Overlay Qualification," August 2006, addresses the issue of fatigue crack growth. If an assumed flaw in the piping extends through 75% of the pipe thickness, more than 19 years can be expected to pass before the flaw grows through the base metal. A table below provides the specific nozzle and an expected service life relative to the ratio of assumed initial flaw depth to the original wall thickness.
Pressurizer Safe End' Expected Service Life Spray Nozzle N2 19 Years Safety Nozzle N3 40 Years Relief Nozzle N4A 40 Years Safety Nozzle N4B 40 Years Safety Nozzle N4C 40 Years Consequently, such a flaw would not grow through-wall before the next inservice inspection.
There is additional assurance in that post-weld overlay inspection did not identify any flaws in the inspectable volume of the base metal for the pressurizer spray, relief, and safety nozzle safe-end weld overlays.