Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040D650 + (08:16:04, 14 March 2020)
- GO2-06-092, Supplemental Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (08:16:07, 14 March 2020)
- NL-06-1275, Request for Extension for Completing Corrective Actions for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (08:28:09, 14 March 2020)
- ML061730230 + (08:32:20, 14 March 2020)
- LR-N06-0257, Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (08:45:05, 14 March 2020)
- LR-N06-0258, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (08:45:14, 14 March 2020)
- PLA-6067, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Barrier Configurations + (08:45:24, 14 March 2020)
- NL-06-1186, Results of Inspection Per NRC Bulletin 2004-01 of Alloy 82/182/600 Pressurizer Penetrations and Steam Space Piping Connections + (08:52:49, 14 March 2020)
- NOC-AE-06002005, Revised Broad Scope Risk-Informed Technical Specification Amendment Request + (08:53:15, 14 March 2020)
- NL-06-1042, NRC Generic Letter 2006-03 Response + (08:55:14, 14 March 2020)
- LIC-06-0067, Revised Request for an Extension to the Completion Date for Corrective Actions Taken in Response to Generic Letter 2004-02 + (08:55:33, 14 March 2020)
- L-06-045, LPDES (LA0042731) Permit Renewal + (08:59:13, 14 March 2020)
- ML061560230 + (09:09:42, 14 March 2020)
- ML061520370 + (09:17:32, 14 March 2020)
- ML061390284 + (09:49:27, 14 March 2020)
- NL-06-0826, ASME Section XI Request for Relief Number RR-59 Temporary Non-Code Repair Service Water Piping + (10:13:29, 14 March 2020)
- NOC-AE-06001994, Response to NRC Requests for Additional Information on STPNOC Proposed Risk-Informed Technical Specifications + (10:28:30, 14 March 2020)
- NOC-AE-06002006, Notice Regarding NRC Energy, Inc. Corporate Restructuring Affection Nrg South Texas LP and Request for Consent to Support Agreement Modifications + (11:13:03, 14 March 2020)
- ML061080673 + (11:18:48, 14 March 2020)
- ML061080671 + (11:18:54, 14 March 2020)
- LR-N06-0131, Response to NRC Generic Letter 2006-02 Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (11:33:37, 14 March 2020)
- LR-N06-0132, Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (11:34:00, 14 March 2020)
- NL-06-043, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (11:34:43, 14 March 2020)
- RBG-46554, Response to Generic Letter 06-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (11:39:53, 14 March 2020)
- ML060950642 + (11:48:08, 14 March 2020)
- NRC-06-0013, 60-Day Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (11:51:12, 14 March 2020)
- L-2006-073, NRC Generic Letter 2006/02 60-Day Response + (11:51:32, 14 March 2020)
- W3F1-2006-0014, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (11:52:07, 14 March 2020)
- GNRO-2006/00014, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (11:56:03, 14 March 2020)
- JAFP-06-0057, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (12:06:02, 14 March 2020)
- RS-06-036, Egc/Amergen, 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (12:07:08, 14 March 2020)
- LIC-06-0025, 60 Day Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (12:08:21, 14 March 2020)
- NL-06-0540, Southern Nuclear Operating Co., 60-Day Response to Generic Letter 2006-02, Grid Reliability and Impact on Plant Risk and the Operability of Offsite Power + (12:09:54, 14 March 2020)
- NOC-AE-06001990, Decommissioning Funding Status Report - 2005 + (12:39:55, 14 March 2020)
- LIC-06-0021, Response to Request for Additional Information Related to Extension Date for Corrective Actions Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized + (13:02:23, 14 March 2020)
- ML060650134 + (13:20:04, 14 March 2020)
- SVPLTR 06-0006, Core Operating Limits Report for Plant Cycle 20 Revision 1 + (13:30:26, 14 March 2020)
- NL-06-028, Day Response to NRC Generic Letter 2006-01: Steam Generator Tube Integrity and Associated Technical Specifications + (13:31:12, 14 March 2020)
- NOC-AE-06001977, Submittal of Nuclear Insurance Protection + (13:52:15, 14 March 2020)
- NOC-AE-06001969, Response to NRC RAI on STPNOC Proposed Risk-Informed Technical Specifications + (13:52:38, 14 March 2020)
- NOC-AE-06001972, Evidence of Financial Protection + (13:55:43, 14 March 2020)
- NOC-AE-06001970, License Amendment Request - Proposed Amendment to Technical Specification 3.8.3.1 + (14:16:43, 14 March 2020)
- L-2006-009, December 2005 Monthly Operating Report for St. Lucie Units 1 & 2 + (14:42:52, 14 March 2020)
- LIC-06-0004, Attachment 1, Engineering Analysis (EA-FC-04-010) Recommendations for Implementing of Compensatory Actions in Response to NRC Bulletin 2003-01 + (14:43:28, 14 March 2020)
- NOC-AE-06001961, Submittal of Revised Operations Quality Assurance Plan + (14:49:25, 14 March 2020)
- CPSES-200502600, Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors, Rev, 1 of the NRC Order EA-03-009.. + (14:52:41, 14 March 2020)
- NRC 2005-0155, Supplement to 60-Day Response to Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. + (15:17:54, 14 March 2020)
- L-2005-248, November 2005 Monthly Operating Report for St. Lucie, Units 1 and 2 + (15:35:26, 14 March 2020)
- NL-05-2269, Unit 2 Results of Inspection Per NRC Bulletin 2004-01 of Alloy 82//182/600 Pressurizer Penetrations and Steam Space Piping Connections + (15:35:48, 14 March 2020)
- RC-05-0204, Response to NRC Questions Regarding Response to Generic Letter 96-06 + (15:43:23, 14 March 2020)
- L-MT-03-057, Generic Letter, 2003-01: Control Room Habitability 60-day Response + (15:51:43, 14 March 2020)