PLA-6067, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Barrier Configurations

From kanterella
Jump to navigation Jump to search
Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Barrier Configurations
ML061660076
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/09/2006
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
+kBR1SISP20060621, GL-06-003, PLA-6067
Download: ML061660076 (3)


Text

=- #.

Btift T. McKinney PPL Susquehanna, LLC Senior Vice President-Chief Nuclear Officer 769 Salem Boulevard 3--

Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com PP' soft.

JUN 0 9 2o06 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT BARRIER CONFIGURATIONS Docket Nos. 50-387 PLA-6067 50-388

References:

1) NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MTF FireBarrierConfigurations," dated April 10, 2006.
2) PLA-5172, R. G. Byramn (PPL) to USNRC, "Status of Fire Protection CorrectiveActions," dated April 28, 2000.

The purpose of this submittal is to provide the PPL Susquehanna, LLC (PPL) response to Generic Letter 2006-03. A review of PPL's fire protection barriers was performed and it has been determined that Hemyc and MT fire barriers have not been utilized at the station. All fire barriers have been installed and comply with NRC Generic Letters 86-10, supplement No. 1 and 92-08.

Should you have any questions or require additional information, please contact Mr. Dayne R. Brophy, Regulatory Affairs Engineer, at (570) 542-3365.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:..\_'0 'ý>0, J B. T. McKinney

Attachment:

Response to Generic Letter 2006-03

/ý/'?'J-

Document Control Desk PLA-6067 cc: Mr. Richard Guzman Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike - Mail Stop 8 B1A Rockville, MD 20852-2738 Mr. A. J. Blarney Sr. Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35 Berwick, PA 18603-0035 Mr. Samuel J. Collins Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Rd.

King of Prussia, PA 19406

PPL's Response to NRC Generic Letter 2006-03

1. Is Hemyc or MT fire barrier material used at PPL Susquehanna, and is it relied upon for separation and safe shutdown purposes in accordance with its licensing basis?

No, Susquehanna does not use Hemyc or MT fire barrier materials. Susquehanna uses Thermo-Lag materials for all fire barriers except for one fire barrier installed in the Unit 2 Reactor Building which used Darmatt material.

2. What controls were used by PPL to ensure that other fire barrier types relied on for separation of redundant trains located in a single fire area are capable of providing the necessary level of protection?

Detailed engineering studies were performed on all installed fire barrier configurations. In addition, PPL implemented the required compensatory measures contained in the station's Technical Specifications for those raceway barriers considered inoperable. Following the results of acceptance testing for the installed configurations, nonconforming materials were replaced/upgraded with materials

-meeting the requirements of NRC Generic Letters 86-10 Supplement No.1l and 92-08.

All corrective actions to comply with the Generic Letters were completed and' documented in PPL correspondence PLA-5172, dated April 28, 2000.

The engineering studies, including the evaluated barrier configurations and test results are considered part of the plant design basis. These provide the controls necessary to maintain the level of protection required.

3. If PPL Susquehanna has Hemyc or MT installed fire barrier materials, discuss the extent of the installation, conformance with our licensing basis, compensatory measures, and schedule for corrective actions.

Based on the fact that PPL Susquehanna, LLC does not contain any Hemyc or MT fire barriers, the questions regarding the installation and other measures are not applicable to PPL Susquehanna.

Text

=- #.

Btift T. McKinney PPL Susquehanna, LLC Senior Vice President-Chief Nuclear Officer 769 Salem Boulevard 3--

Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com PP' soft.

JUN 0 9 2o06 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT BARRIER CONFIGURATIONS Docket Nos. 50-387 PLA-6067 50-388

References:

1) NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MTF FireBarrierConfigurations," dated April 10, 2006.
2) PLA-5172, R. G. Byramn (PPL) to USNRC, "Status of Fire Protection CorrectiveActions," dated April 28, 2000.

The purpose of this submittal is to provide the PPL Susquehanna, LLC (PPL) response to Generic Letter 2006-03. A review of PPL's fire protection barriers was performed and it has been determined that Hemyc and MT fire barriers have not been utilized at the station. All fire barriers have been installed and comply with NRC Generic Letters 86-10, supplement No. 1 and 92-08.

Should you have any questions or require additional information, please contact Mr. Dayne R. Brophy, Regulatory Affairs Engineer, at (570) 542-3365.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:..\_'0 'ý>0, J B. T. McKinney

Attachment:

Response to Generic Letter 2006-03

/ý/'?'J-

Document Control Desk PLA-6067 cc: Mr. Richard Guzman Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike - Mail Stop 8 B1A Rockville, MD 20852-2738 Mr. A. J. Blarney Sr. Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35 Berwick, PA 18603-0035 Mr. Samuel J. Collins Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Rd.

King of Prussia, PA 19406

PPL's Response to NRC Generic Letter 2006-03

1. Is Hemyc or MT fire barrier material used at PPL Susquehanna, and is it relied upon for separation and safe shutdown purposes in accordance with its licensing basis?

No, Susquehanna does not use Hemyc or MT fire barrier materials. Susquehanna uses Thermo-Lag materials for all fire barriers except for one fire barrier installed in the Unit 2 Reactor Building which used Darmatt material.

2. What controls were used by PPL to ensure that other fire barrier types relied on for separation of redundant trains located in a single fire area are capable of providing the necessary level of protection?

Detailed engineering studies were performed on all installed fire barrier configurations. In addition, PPL implemented the required compensatory measures contained in the station's Technical Specifications for those raceway barriers considered inoperable. Following the results of acceptance testing for the installed configurations, nonconforming materials were replaced/upgraded with materials

-meeting the requirements of NRC Generic Letters 86-10 Supplement No.1l and 92-08.

All corrective actions to comply with the Generic Letters were completed and' documented in PPL correspondence PLA-5172, dated April 28, 2000.

The engineering studies, including the evaluated barrier configurations and test results are considered part of the plant design basis. These provide the controls necessary to maintain the level of protection required.

3. If PPL Susquehanna has Hemyc or MT installed fire barrier materials, discuss the extent of the installation, conformance with our licensing basis, compensatory measures, and schedule for corrective actions.

Based on the fact that PPL Susquehanna, LLC does not contain any Hemyc or MT fire barriers, the questions regarding the installation and other measures are not applicable to PPL Susquehanna.