Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082L998 + (11:51:45, 14 December 2024)
- ML20082L999 + (11:51:45, 14 December 2024)
- 3F0891-13, Ack Receipt of 910802 & 08 Ltrs Transmitting 2.206 Petition by Counsel for Former Employee.Submittal of Results of Issues Raised in Petition Delayed from 910831 to 910920 + (11:51:46, 14 December 2024)
- RBG-35-497, Forwards Semiannual Radioactive Effluent Release Rept for Jan-Jun 1991 & Rev 4 to RWS-0204, Radwaste Processing Control Program + (11:51:46, 14 December 2024)
- ML20082L983 + (11:51:47, 14 December 2024)
- ML20082L987 + (11:51:47, 14 December 2024)
- ST-HL-AE-3842, Application for Amend to Licenses NPF-76 & NPF-80,revising Tech Spec 3.3.3.7 Re Chemical Detection Sys + (11:51:48, 14 December 2024)
- AECM-83-0533, Responds to NRC Re Violations & Deviation Noted in IE Insp Rept 50-416/83-25.Reasons Why Operations Enhancement Program Not in Place at Time of Insp Clarified + (11:51:49, 14 December 2024)
- ML20082L975 + (11:51:49, 14 December 2024)
- ML20082L959 + (11:51:50, 14 December 2024)
- B13912, Forwards Info Re 910726 Loss of Control Room Annunciators for More than 15 Minutes.Caused by Addl 60-volt Dc Inputted to Power Supply in Addition to Normal 120-volt Ac.New Power Supplies Installed & Tech Spec Change Requested + (11:51:51, 14 December 2024)
- ST-HL-AE-3865, Forwards Semiannual Fitness for Duty Program Performance Rept for Jan-June 1991 + (11:51:51, 14 December 2024)
- L-91-228, Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1991 + (11:51:52, 14 December 2024)
- AECM-83-0579, Submits Addl Info Re Alleged Violation Noted in IE Insp Rept 50-416/83-25.Violation Arose Due to Differences in Interpretation of Util Response to Notice of Deviation + (11:51:53, 14 December 2024)
- ML20082L948 + (11:51:54, 14 December 2024)
- HL-1778, Forwards Owners Data Rept (NIS-1) for Inservice Insp, Ei Hatch Nuclear Plant Unit 2,Dec 1989-June 1991. No Reportable Indications Detected in Seven Welds in nonsafety- Related RWCU Sys,Per Generic Ltr 88-01 + (11:51:55, 14 December 2024)
- ML20082L936 + (11:51:56, 14 December 2024)
- ML20082L931 + (11:51:57, 14 December 2024)
- ML20082L928 + (11:51:57, 14 December 2024)
- B13897, Provides Updated Response to Insp Rept 50-423/90-80 Re Emergency Operating Procedures Upgrade Project & Proposed Schedule for Project Completion + (11:51:58, 14 December 2024)
- ML20082L923 + (11:51:58, 14 December 2024)
- HL-1785, Georgia Power Co Plant,Ei Hatch Units 1 & 2 Semiannual Radioactive Effulent Release Rept,Jan-June 1991 + (11:51:59, 14 December 2024)
- 05000423/LER-1991-020-01, :on 910726,inadvertent Main Steam Isolation Signal Occurred.Caused by Wrong Switch Operation Due to Improper Work Practices.Importance of self-checking as Part of Routine Work Practices re-emphasized + (11:52:01, 14 December 2024)
- ML20082L896 + (11:52:02, 14 December 2024)
- ML20082L900 + (11:52:02, 14 December 2024)
- 05000353/LER-1991-014-02, :on 910801,inadvertent Start of EDG Generator Occurred.Caused by non-licensed Operator Failing to Follow Surveillance Test Procedure.Operator Disciplined.Need for Procedure Complance Reiterated + (11:52:04, 14 December 2024)
- ML20082L894 + (11:52:05, 14 December 2024)
- ML20082L893 + (11:52:06, 14 December 2024)
- ML20082L890 + (11:52:07, 14 December 2024)
- ST-HL-AE-3857, Semiannual Radioactive Effluent Release Rept for South Texas Project Electric Generating Station Unit 1 & 2 for Jan-June 1991 + (11:52:08, 14 December 2024)
- ML20082L885 + (11:52:09, 14 December 2024)
- 0CAN049508, Forwards Response to Violations Noted in Insp Repts 50-313/95-02 & 50-368/95-02.Corrective Actions:Lessons Learned from RCS Draindown Event Discussed w/ANO-1 Operating Crews Prior to Commencement Refueling Outage on 950215 + (11:52:11, 14 December 2024)
- ML20082L879 + (11:52:12, 14 December 2024)
- ML20082L875 + (11:52:13, 14 December 2024)
- ML20082L876 + (11:52:13, 14 December 2024)
- ML20082L869 + (11:52:14, 14 December 2024)
- ML20082L868 + (11:52:15, 14 December 2024)
- ML20082L866 + (11:52:15, 14 December 2024)
- ML20082L865 + (11:52:17, 14 December 2024)
- ML20082L864 + (11:52:18, 14 December 2024)
- ML20082L862 + (11:52:18, 14 December 2024)
- ML20082L861 + (11:52:19, 14 December 2024)
- ML20082L860 + (11:52:20, 14 December 2024)
- ML20082L857 + (11:52:21, 14 December 2024)
- ML20082L856 + (11:52:23, 14 December 2024)
- ML20082L851 + (11:52:23, 14 December 2024)
- ML20082L845 + (11:52:24, 14 December 2024)
- NLS9100534, Semiannual Operating Rept of Radioactive Effluents for Jan-June 1991 + (11:52:30, 14 December 2024)
- ML20082L833 + (11:52:31, 14 December 2024)
- 05000395/LER-1991-005, :on 910624,surveillance Test Procedure Re Main Steam Valve Operability Test Missed.Caused by Personnel Error.Valves Retested & Frequency of Scheduled Test,Per Tech Spec 4.0.5,increased + (11:52:33, 14 December 2024)
- ML20082L824 + (11:52:37, 14 December 2024)