Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-78 + (22:12:24, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-77 + (22:12:28, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-27 + (22:12:32, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-25 + (22:12:36, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3 + (22:12:41, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-13 + (22:12:45, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-10 + (22:12:49, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-26 + (22:12:53, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant + (22:13:03, 12 July 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Submittal of Final Safety Analysis Report (FSAR) Updated Through May 31, 2016 + (22:13:17, 12 July 2018)
- RC-16-0086, V.C. Summer, Unit 1 - Special Report (Spr) 2016-002 Regarding Fire Barrier Not Being Restored to Operability Status within Seven Days After Declaration of Inoperability + (23:05:42, 12 July 2018)
- NL-16-040, Watts Bar, Units 1 and 2 - Revised Request for License Amendments Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources Operating (TS-WBN-15-09) + (02:00:06, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 10, Articles of Incorporation - Ameren Corporation Restated 10/17/1995 + (04:27:04, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Foreign Ownership Control or Influence (FOCI) + (04:27:07, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 17, By-Laws of Union Electric Company as Amended to 12/10/2010 + (04:28:19, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 15, Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/1922 + (04:28:23, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 14, Union Electric Company - Information Statement 2015 + (04:28:37, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 11, Ameren Corporation By-Laws Effective 12/11/2015 + (04:28:43, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 9, Articles of Incorporation - Ameren Corporation Dated 08/07/1995 + (04:28:46, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 8, 10-Q Filed Period 09/30/2015 + (04:28:55, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 7, 10-Q Filed Period 06/30/2015 + (04:29:27, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 6, 10-Q Filed Period 03/31/2015, + (04:29:35, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 5, 10-K Filed Period 12/31/2014 + (04:30:39, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 4, 2015 Ameren 2014 Annual Report (Filed 03/02/2015 Includes 2014 Form 10-K) + (04:30:57, 13 July 2018)
- ULNRC-06272, Callaway, Unit 1 - Enclosure 3, 2015 Proxy Statement of Ameren Corporation + (04:31:20, 13 July 2018)
- NL-15-144, Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement + (05:24:27, 13 July 2018)
- NL-15-124, LER 15-001-00 for Indian Point 2, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Cont + (07:38:15, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (Retyped) + (07:46:41, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (with Redline/Strike Out) + (07:46:55, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Areva Affidavits + (07:47:02, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, General Electric Hitachi Affidavits + (07:47:06, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, List and Status of Plant Modifications + (07:47:11, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan + (07:47:19, 13 July 2018)
- NL-15-169, Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program + (07:47:24, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2 and 3, Probabilistic Risk Assessment + (07:47:58, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2 and 3, Supplemental Environmental Report + (07:48:09, 13 July 2018)
- NL-15-169, NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis. + (07:51:42, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2 and 3, RHR Heat Exchange K-values Utilities in EPU Containment Analyses + (07:51:50, 13 July 2018)
- NL-15-169, ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues. + (07:51:57, 13 July 2018)
- NL-15-169, ANP-2637, Revision 6, Boiling Water Reactor Licensing Methodology Compendium. + (07:52:10, 13 July 2018)
- NL-15-169, ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate. + (07:52:18, 13 July 2018)
- NL-15-169, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology + (07:52:23, 13 July 2018)
- NL-15-169, Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU + (07:52:28, 13 July 2018)
- NL-15-169, ANP-3388NP, Revision 0, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate, Licensing Report. + (07:52:33, 13 July 2018)
- NL-15-169, ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report. + (07:52:39, 13 July 2018)
- NL-15-169, ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report. + (07:52:45, 13 July 2018)
- NL-15-169, ANP-3343NP, Revision 0, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle Atrium 10XM Fuel. + (07:53:05, 13 July 2018)
- NL-15-169, ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate + (07:53:37, 13 July 2018)
- NL-15-169, ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design. + (07:53:59, 13 July 2018)
- NL-15-169, ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design. + (07:54:22, 13 July 2018)
- NL-15-169, ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu). + (07:54:31, 13 July 2018)