Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094C873 + (14:47:48, 13 December 2024)
- ML20094C852 + (14:47:49, 13 December 2024)
- ML20094C843 + (14:47:50, 13 December 2024)
- ML20094C840 + (14:47:51, 13 December 2024)
- 0CAN109512, Informs That Licensees Reviewed Concerns Identified in Re Termination of Unescorted Site in Timely Manner.Some of Enhancements Submitted as Listed + (14:47:52, 13 December 2024)
- ML20094C829 + (14:47:52, 13 December 2024)
- ML20094C826 + (14:47:53, 13 December 2024)
- ML20094C823 + (14:47:54, 13 December 2024)
- ML20094C816 + (14:47:55, 13 December 2024)
- ML20094C811 + (14:47:56, 13 December 2024)
- ML20094C809 + (14:48:00, 13 December 2024)
- ML20094C798 + (14:48:01, 13 December 2024)
- ML20094C794 + (14:48:02, 13 December 2024)
- ML20094C789 + (14:48:04, 13 December 2024)
- 05000388/LER-1984-010-01, :on 840627,HPCI Sys Declared Inoperable for 22 H to Facilitate Removal of Startup Strainer.Caused by Blockage in Startup During Heatup Plateau Review.Startup Strainer Removed & Ring Spacer Installed + (14:48:06, 13 December 2024)
- ML20094C765 + (14:48:08, 13 December 2024)
- ML20094C761 + (14:48:09, 13 December 2024)
- ML20094C741 + (14:48:10, 13 December 2024)
- 05000263/LER-1984-024, :on 840627,during Cold Shutdown,Reactor Bldg Ventilation Isolation & Standby Gas Treatment Sys Initiation Occurred.Channel a Reactor Bldg Vent Wide Range Gas Monitor Deenergized.Caused by Personnel Error + (14:48:15, 13 December 2024)
- ML20094C700 + (14:48:16, 13 December 2024)
- ML20094C683 + (14:48:18, 13 December 2024)
- ML20094C677 + (14:48:19, 13 December 2024)
- ML20094C664 + (14:48:20, 13 December 2024)
- ML20094C660 + (14:48:22, 13 December 2024)
- 05000458/LER-1990-046, :on 901205,unplanned ESF Actuation Occurred When Spurious Trip Signal Received from RCIC Equipment Room Differential Temp Instrumentation.Caused by Isolation Valve Stroked Closed.New Switch Installed + (14:48:23, 13 December 2024)
- 05000440/LER-1990-036, :on 901207,control Rod Scram Accumulator Level Switch Inoperable Throughout Second Fuel Cycle in Violation of Tech Spec 3.1.3.3.Caused by Unidentified Sys Interaction. Sys Operating Instruction Revised + (14:48:25, 13 December 2024)
- 05000461/LER-1990-017, :on 901206,RHR Sys Not Bypassed During Performance of HX B Room Differential Temp Channel Calibr. Caused by Procedural Errors.Individuals Counseled + (14:48:27, 13 December 2024)
- ML20094C634 + (14:48:30, 13 December 2024)
- PY-CEI-NRR-1287, Forwards LERs 90-036 & 90-037 + (14:48:30, 13 December 2024)
- ML20094C628 + (14:48:32, 13 December 2024)
- ML20094C624 + (14:48:33, 13 December 2024)
- 05000368/LER-1990-024-01, :on 901113,turbine Tripped on Overspeed,Causing Blown Steam Traps.On 901129 & 1206,overspeed of Emergency Feedwater Pump 2P7A Occurred.Caused by Sluggish Governor Response.Oil & Filter Replaced + (14:48:34, 13 December 2024)
- ML20094C618 + (14:48:36, 13 December 2024)
- 05000353/LER-1990-021-02, :on 901206,emergency Diesel Generator D21 Output Breaker Tripped on Reverse Power & Declared Inoperable.Caused by Closure of Cross Current Control Relay Contacts.Relay Replaced + (14:48:38, 13 December 2024)
- 05000318/LER-1990-002, :on 901207,gaseous Effluent Monitoring Sampling Pump Inadvertently Denergized for Less than 1 H.Caused by Inadequate Design.Separate Circuit Breaker Provided for Pump + (14:48:40, 13 December 2024)
- 05000352/LER-1990-033-01, :on 901205,60-amp Power Supply Fuse in Panel 1AY160 Unexectedly Blew,Resulting in Actuation of Primary Containment & Esf.Caused by Wiring Installation Deficiency. Wiring Corrected & New Fuse Installed + (14:48:46, 13 December 2024)
- ML20094C597 + (14:48:48, 13 December 2024)
- ML20094C592 + (14:48:49, 13 December 2024)
- 05000423/LER-1995-005-01, Forwards Suppl LER 95-005-01,updating Cause of Event & Including Addl Actions to Prevent Recurrence + (14:48:53, 13 December 2024)
- ML20094C583 + (14:48:54, 13 December 2024)
- ML20094C581 + (14:48:56, 13 December 2024)
- ML20094C582 + (14:48:56, 13 December 2024)
- ML20094C578 + (14:48:58, 13 December 2024)
- ML20094C575 + (14:48:59, 13 December 2024)
- ML20094C573 + (14:49:00, 13 December 2024)
- 05000325/LER-1995-018, :on 950930,reactor Automatically Shutdown Due to Condensate/Fw Transient.North Condensate Conductivity Cell Gasket 1A Replaced & External Visual Insp Performed on Remaining Condensate Sys Conductivity Cells + (14:49:02, 13 December 2024)
- ML20094C563 + (14:49:04, 13 December 2024)
- 05000305/LER-1984-014, :on 840703,loss of Power on Instrument Bus IV Resulted in Partial Loss of Instrumentation,Alarms & Level Control Problems on Steam Generators.Caused by Loose Connection of Ac Output Breaker 52 Connector + (14:49:06, 13 December 2024)
- ML20094C529 + (14:49:09, 13 December 2024)
- ML20094C528 + (14:49:10, 13 December 2024)
- ML20094C525 + (14:49:12, 13 December 2024)