Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094S198 + (13:57:29, 13 December 2024)
- ML20094S184 + (13:57:29, 13 December 2024)
- ML20094S172 + (13:57:30, 13 December 2024)
- ML20094S169 + (13:57:31, 13 December 2024)
- ML20094S157 + (13:57:33, 13 December 2024)
- ML20094S149 + (13:57:34, 13 December 2024)
- ML20094S153 + (13:57:34, 13 December 2024)
- ML20094S148 + (13:57:35, 13 December 2024)
- 05000325/LER-1992-006, :on 920312,discovered That Instrument Rack Supports to Floor Corroded Through.Caused by High Humidity, Salt Air Environ in Intake Canal.Mounting Bolts Repaired by Replacing Bolts W/Stainless Steel + (13:57:37, 13 December 2024)
- ML20094S096 + (13:57:39, 13 December 2024)
- ML20094S060 + (13:57:40, 13 December 2024)
- 05000458/LER-1995-007, :on 950905,HPCS Unit Cooler Fan Hub Failed. Caused by Casting Defect Consisting of High Porosity & Iron Rich Precipitates Along Grain Boundaries.Repaired & Restored HPCS Unit Cooler to Operational Status + (13:57:41, 13 December 2024)
- 05000285/LER-1995-006, :on 950824,improper Start of Number 1 DG Caused Rt.Caused by Inadequate Administrative Controls on Critical Parameter.Provided Addl Administrative Controls to Ensure That Governor Was Operated Correctly + (13:57:44, 13 December 2024)
- ML20094S043 + (13:57:45, 13 December 2024)
- ML20094S035 + (13:57:45, 13 December 2024)
- ML20094S016 + (13:57:46, 13 December 2024)
- 05000271/LER-1992-010, :on 920308,12 & 17,liquid Radwaste Valve, Feedwater Check Valve & CRD Valves Found W/Seat Leakage Above Ts.Caused by Equipment Wear/Age & Mfg Defect.Valves Repaired,Replaced or Successfully Retested + (13:57:47, 13 December 2024)
- AECM-84-0422, Monthly Operating Rept for Jul 1984 + (13:57:49, 13 December 2024)
- 05000249/LER-1984-005-07, :on 840716,east LPCI Corner Room Submarine Door Found Open.Caused by Stationmen Working in Area.Door Closed & Tech Specs Requiring Door to Be Closed Emphasized. Annunciators Will Be Installed + (13:57:50, 13 December 2024)
- 05000301/LER-1992-001-01, :on 920217,one Channel of Overtemp Delta T Protection Rendered Inoperable During Performance of power- Range Axial Offset Calibr.Caused by Personnel Error.Channel Restored to Svc & Procedure Revised + (13:57:58, 13 December 2024)
- 05000301/LER-1992-001, Forwards LER 92-001-00.Rept Initially Submitted on 920317 as Improperly Numbered LER 92-003-00.Requests That LER 92-003-00 Be Withdrawn & Replaced W/Encl + (13:57:59, 13 December 2024)
- 05000277/LER-1992-001-03, :on 920310,determined That PCIS LSFT for Group III Isolation Defeated Automatic Capability of PCIS Group III Channels.Caused by No Formal 10CFR50.59 Review Being Performed.Pcis & LSFT Were Deleted + (13:58:01, 13 December 2024)
- 05000302/LER-1995-024, :on 951030,annubar Flow Tap Orientation Caused Seismic Qualification Concerns Resulted in Operation Outside Design Basis of Plant.Caused by Personnel Error.Placed Aft Under Administrative Control + (13:58:04, 13 December 2024)
- ML20094R931 + (13:58:05, 13 December 2024)
- 05000369/LER-1992-001-02, :on 920116,Unit 1 Shutdown Due to Leakage Increased to 235 Gallons Per Day.Caused by Failure to Remove Steam Generator Tube from Svc.Three Tubes Removed from Steam Generator 2c for Lab Analysis + (13:58:07, 13 December 2024)
- BSEP-95-0513, Requests Approval for Plant to Use Alternative to ASME B&PV Code Requirements for Preparation & Submittal of Inservice Summary Rept + (13:58:08, 13 December 2024)
- ST-HL-AE-1109, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-04 & 50-499/84-04.Corrective Actions:Site Std for Nonconformance Reporting Revised + (13:58:09, 13 December 2024)
- ML20094R863 + (13:58:10, 13 December 2024)
- 05000458/LER-1995-009-02, :on 951101,surveillance Was Missed Due to Error in Change of Surveillance Test Interval Scheduling.Caused by Human Error & Inadequate Review.Discussed Inappropriate Schedule Frequency Change + (13:58:12, 13 December 2024)
- ML20094R832 + (13:58:14, 13 December 2024)
- ML20094R854 + (13:58:14, 13 December 2024)
- ML20094R831 + (13:58:15, 13 December 2024)
- 05000325/LER-1992-007, :on 920310,12 H Noble Gas Grab Sample for Reactor Bldg Radioactive Gaseous Effluent Monitoring Instrumentation Overdue.Caused by Chemistry Technician Error.Use of Nonroutine Log Enhanced + (13:58:17, 13 December 2024)
- ML20094R790 + (13:58:18, 13 December 2024)
- ML20094R824 + (13:58:18, 13 December 2024)
- ML20094R777 + (13:58:20, 13 December 2024)
- 05000331/LER-1995-011, :on 951019,during Surveillance Test Procedure, a Sdg Outboard Bearing Temp Reached 205 F.Caused by Incorrectly Installed Room Temp Controller.Controller Reconfigured + (13:58:21, 13 December 2024)
- 0CAN119505, Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-313/95-07 & 50-368/95-07 on 950806-0916.Corrective Actions:Mgt Relayed Expectations of Event as Well as Overall Procedure Compliance to Individual Involved in Event + (13:58:22, 13 December 2024)
- TAC:48490 + (13:58:23, 13 December 2024)
- 05000443/LER-1995-006, :on 951030,unit Operated Above Maximum Thermal Power Level.Caused by Inadequate Procedure That Did Not Ensure That re-normalization Was Considered After Transmitter Recalibration.Revised Procedures + (13:58:25, 13 December 2024)
- ML20094R747 + (13:58:27, 13 December 2024)
- ML20094R739 + (13:58:28, 13 December 2024)
- ML20094R740 + (13:58:28, 13 December 2024)
- 05000301/LER-1995-005-01, :on 951025,plugged 46 Tubes Due to Degradation in Roll Transition,Tubesheet Crevice & Tube Support Plate Regions.Performed Closeout Insps Following Maint of Each Sg + (13:58:31, 13 December 2024)
- 05000366/LER-1995-008, :on 951102,RV Inventory Loss Resulted in Unplanned ESF Sys Actuations.Revised Procedures & Drawings, Corrected Label,Reset LS-14,checked Limit Switches & Tested Valve Interlock Logic + (13:58:33, 13 December 2024)
- 3F1195-25, Submits Discussion in Response to Concerns Re Proposed TS Change Request to Extend Most Refueling Interval Surveillances to 24 Months.Revised Copies of Instrument Drift Studies Included in Original Submittal Attached Also + (13:58:35, 13 December 2024)
- 05000366/LER-1995-006-02, :on 951030,personnel Error Resulted in Automatic Start of EDG 1B.Labeled PT Compartment Doors & Training Test Engineers on Event + (13:58:36, 13 December 2024)
- 05000339/LER-1995-003-03, :on 951106,containment Personnel Air Lock Outer Door Was Open & Uncapped.Caused by Failure of Individuals to Adhere to Set of Performance Stds for Implementing Work at Power Station.Disqualified Personnel Involved + (13:58:38, 13 December 2024)
- 05000271/LER-1995-018, :on 950929,discovered Inadequate IST Surveillance & RG 1.97 Submittal Info on Recirculation Loop Sample Line Isolation Valves Due to Misinterpretation of Existing Design Configuration.Tagged Switches + (13:58:41, 13 December 2024)
- 05000458/LER-1992-005, :on 920305,reactor Trip Occurred on Turbine Control Valve Fast Closure.Caused by High Winds During Thunderstorm,Resulting in phase-to-ground Fault.Damaged Transformer Reworked + (13:58:43, 13 December 2024)
- ML20094R710 + (13:58:44, 13 December 2024)