Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138G057 + (00:29:05, 12 December 2024)
- PNO-IV-97-025, on 970502,excessive Dose Rates on Incoming Package Containing I-131 Capsule Occurred.Initial Surveys of Package,Performed in Accordance W/Hosp Procedures,Revealed Surface Dose Rate of Greater than 10 M/H + (00:29:06, 12 December 2024)
- ML20138G053 + (00:29:07, 12 December 2024)
- ML20138G047 + (00:29:08, 12 December 2024)
- ML20138G046 + (00:29:08, 12 December 2024)
- ML20138G043 + (00:29:09, 12 December 2024)
- ML20138G039 + (00:29:10, 12 December 2024)
- ML20138G035 + (00:29:11, 12 December 2024)
- ML20138G037 + (00:29:11, 12 December 2024)
- PNO-I-97-017, on 970319,Units 1 & 2 Experienced Dual Unit Reactor Trip from Full Power Due to Electrical Fault Protection Signal from 345 Kv Bus in Onsite Switchyard. Signal Tripped Both Main Generators + (00:29:12, 12 December 2024)
- ML20138G029 + (00:29:13, 12 December 2024)
- 05000318/LER-1997-001-01, :on 970401,refueling Machine Overload Protective Circuitry Was Inoperable Due to Failure to Correctly Translate Refueling Machine Circuitry Design Into Ts.Mod to Overload Bypass Was Installed + (00:29:15, 12 December 2024)
- ML20138G027 + (00:29:16, 12 December 2024)
- ML20138G023 + (00:29:17, 12 December 2024)
- ML20138G015 + (00:29:23, 12 December 2024)
- ML20138G017 + (00:29:23, 12 December 2024)
- PNO-II-97-014, on 970305,Unit 3 Experienced Loss of Offsite Power & Declared Notification of Unusual Event.Unit 2 Operating at 100 Percent During Event & Unaffected.Unit 1 in Long Term Shutdown Condition & Also Unaffected + (00:29:24, 12 December 2024)
- ML20138G010 + (00:29:25, 12 December 2024)
- ML20138G012 + (00:29:25, 12 December 2024)
- ML20138G007 + (00:29:26, 12 December 2024)
- 3F0497-33, Informs NRC of Actions Licensee Has Taken for Temperature Sensitive Components That May Affect Containment Integrity at Plant,In Response to GL 96-06 + (00:29:26, 12 December 2024)
- ML20138G006 + (00:29:27, 12 December 2024)
- PY-CEI-NRR-2170, Requests NRC Staff Review & Approval of 10CFR50.80 Transfer Request to Be Completed by 970601.Draft Copies of SE & Order for Staffs Use During Review Process,Encl + (00:29:28, 12 December 2024)
- ML20138G003 + (00:29:30, 12 December 2024)
- ML20138G001 + (00:29:31, 12 December 2024)
- ML20138F999 + (00:29:32, 12 December 2024)
- 05000482/LER-1996-010, :on 961009,failure of MOV to Fully Close Occurred Due to Inadequate pre-tensioning of Torque Switch Contact Finger.Valve Actuator Was Repaired,Training Was Provided & Program Requirements Revised + (00:29:34, 12 December 2024)
- SNRC-1209, Forwards Response to WR Butler Re Review of Eg&G Evaluation of Implementation of Rev 2 to Reg Guide 1.97 Concerning Emergency Response Capability + (00:29:35, 12 December 2024)
- PNO-III-97-010, on 970219,diesel-driven CS Pump Found to Be Inoperable During Routine Surveillance Test.Reactor Operator Realized,Rods Were Moved Further than Expected.Actual Safety Significance of Error Minimal + (00:29:35, 12 December 2024)
- ML20138F989 + (00:29:36, 12 December 2024)
- JAFP-97-0161, Responds to NRC Re Violations Noted in Insp Rept 50-333/97-01.Corrective Actions:Installation of Hose Clamps to Valve Air Actuators Incorporated Into Plants Temporary Mod Control Program + (00:29:37, 12 December 2024)
- ML20138F987 + (00:29:37, 12 December 2024)
- ML20138F985 + (00:29:38, 12 December 2024)
- 05000245/LER-1997-016-01, :on 970401,discovered That Vent/Purge Operation Using Sgts,Opening & Closing Sequence of Atmospheric Control Created Temporary Flow Path Between Reactor Bldg & Primary Containment Prior to Isolation of AC Sys + (00:29:40, 12 December 2024)
- ML20138F982 + (00:29:42, 12 December 2024)
- ML20138F980 + (00:29:44, 12 December 2024)
- 05000245/LER-1997-016, Forwards LER 97-016-00,which Documents an Event That Occurred at Mnps,Unit 1 on 970401.Commitment Made within Ltr,Listed + (00:29:45, 12 December 2024)
- ML20138F977 + (00:29:45, 12 December 2024)
- ML20138F971 + (00:29:46, 12 December 2024)
- ML20138F969 + (00:29:46, 12 December 2024)
- ML20138F968 + (00:29:47, 12 December 2024)
- ST-HL-AE-1457, Forwards Response to Draft SER & FSAR Items for Chapter 12 Re Radiation Monitoring & Protection.Encl marked-up FSAR Pages Will Be Incorporated in Future Amend Unless Otherwise Noted + (00:29:48, 12 December 2024)
- A97003, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20.Corrective Actions:Training Dept Will Include Discussion of Event in Licensed & non-licensed Operator Training Programs + (00:29:52, 12 December 2024)
- ML20138F965 + (00:29:52, 12 December 2024)
- ML20138F962 + (00:29:53, 12 December 2024)
- IR 05000250/1991033 + (00:29:55, 12 December 2024)
- ML20138F955 + (00:29:55, 12 December 2024)
- U-600274, Forwards Rev 00 to Dynamic Qualification of Time Delay Relays, in Response to SER Outstanding Issue 7ii & Unresolved Items Identified by Sqrt During Site Visit During Wk of 850827-30 + (00:29:56, 12 December 2024)
- ML20138F953 + (00:29:57, 12 December 2024)
- RBG-22417, Special Rept:On 850914,during Performance of Monthly Channel Check,Triaxial Response Spectrum Recorder Discovered Inoperable Due to Inability to Clear Alarm.Caused by Const Activities in Area + (00:29:58, 12 December 2024)
- ML20138F951 + (00:29:58, 12 December 2024)