Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-14-403, Notification of Significant Errors in or Changes to the Large-Break Loss-of-Coolant Accident Emergency Core Cooling Model in Accordance with 10 CFR 50.46(a)(3)(ii) + (20:22:23, 10 January 2025)
- JAFP-14-0145, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (20:22:23, 10 January 2025)
- L-MT-14-092, First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (20:22:25, 10 January 2025)
- ML14353A218 + (20:22:25, 10 January 2025)
- RA-14-0032, CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation + (20:22:26, 10 January 2025)
- 05000220/LER-2014-005, Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors + (20:22:28, 10 January 2025)
- ML14353A203 + (20:22:29, 10 January 2025)
- RS-14-301, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima + (20:22:31, 10 January 2025)
- ML14353A193 + (20:22:37, 10 January 2025)
- L-PI-14-127, Fifth Interval Inservice Inspection Plan December 21, 2014 Through December 20, 2024 + (20:22:38, 10 January 2025)
- RS-14-305, First Six-Month Status Report Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. + (20:22:39, 10 January 2025)
- ML14353A117 + (20:22:42, 10 January 2025)
- ML14353A114 + (20:22:43, 10 January 2025)
- RS-14-304, First Six-Month Status Report Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable to Reliable Hardened Containment Vents Capable of Operation Under + (20:22:44, 10 January 2025)
- ML14353A096 + (20:22:48, 10 January 2025)
- L-PI-14-130, Fourth Ten-Year Interval Snubbers Testing Program + (20:22:50, 10 January 2025)
- RS-14-298, Expedited Seismic Evaluation Process Report Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (20:22:52, 10 January 2025)
- ML14353A083 + (20:22:53, 10 January 2025)
- NL-14-2045, Withdrawal of License Amendment Request for Technical Specification Revision for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System + (20:22:54, 10 January 2025)
- LR-N14-0258, First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (20:22:54, 10 January 2025)
- L-PI-14-131, Fifth Ten-Year Interval Snubbers Testing Program + (20:22:56, 10 January 2025)
- L-14-401, 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station + (20:22:57, 10 January 2025)
- ML14353A059 + (20:22:59, 10 January 2025)
- ND-14-2009, 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample + (20:23:00, 10 January 2025)
- ML14353A051 + (20:23:01, 10 January 2025)
- NRC 2014-0078, Response to Request for Additional Information (Fire Protection Engineering/Fire Modeling) License Amendment Request 271 Associated with NFPA 805 + (20:23:02, 10 January 2025)
- NRC 2014-0077, NextEra Energy Point Beach, LLCs Full Compliance Report for the March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (20:23:03, 10 January 2025)
- ML14353A033 + (20:23:06, 10 January 2025)
- CNS-14-131, WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (MUR) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations + (20:23:08, 10 January 2025)
- ML14353A028 + (20:23:11, 10 January 2025)
- ML14353A027 + (20:23:12, 10 January 2025)
- L-2014-242, Application to Adopt TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B + (20:23:13, 10 January 2025)
- NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years + (20:23:22, 10 January 2025)
- IR 05000282/2014407 + (20:23:23, 10 January 2025)
- AEP-NRC-2014-89, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events + (20:23:24, 10 January 2025)
- ML14352A465 + (20:23:25, 10 January 2025)
- IR 05000263/2014407 + (20:23:26, 10 January 2025)
- IR 05000341/2014405 + (20:23:26, 10 January 2025)
- 05000382/LER-2014-004, Regarding Emergency Diesel Generators Rendered Inoperable by Potential Water Intrusion Into Diesel Fuel Oil Feed Tanks + (20:23:30, 10 January 2025)
- ULNRC-06167, Annual Update to License Renewal Application + (20:23:30, 10 January 2025)
- ULNRC-06168, Enclosure 3 - 2014 Proxy Statement of Ameren Corporation - Ameren + (20:23:31, 10 January 2025)
- ML14352A443 + (20:23:34, 10 January 2025)
- ML14352A445 + (20:23:34, 10 January 2025)
- ML14352A441 + (20:23:35, 10 January 2025)
- ML14352A440 + (20:23:36, 10 January 2025)
- ML14352A439 + (20:23:38, 10 January 2025)
- ML14352A438 + (20:23:39, 10 January 2025)
- ML14352A435 + (20:23:41, 10 January 2025)
- ML14352A436 + (20:23:41, 10 January 2025)
- ML14352A434 + (20:23:42, 10 January 2025)
- ML14352A433 + (20:23:43, 10 January 2025)