Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195E455 + (23:54:57, 10 December 2024)
- ML20195E456 + (23:54:57, 10 December 2024)
- RBG-23789, Forwards Rept Containing Brief Description of Changes to Initial Test Program (ST-24 & ST-30D) & Summary of Safety Evaluation for Each Change + (23:54:58, 10 December 2024)
- ML20195E453 + (23:54:58, 10 December 2024)
- CLI-88-02, Informs of Encl Commission 880428 Order CLI-88-02,lifting Restrictions Placed on Employment for All Individuals Except Jr Floyd,Per Commission Order CLI-85-09.Update of Status of Various Conditions of Operations Requested + (23:54:59, 10 December 2024)
- 05000414/LER-1999-002-03, :on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested + (23:55:01, 10 December 2024)
- ML20195E446 + (23:55:02, 10 December 2024)
- ML20195E447 + (23:55:02, 10 December 2024)
- ML20195E445 + (23:55:03, 10 December 2024)
- ML20195E444 + (23:55:03, 10 December 2024)
- ML20195E442 + (23:55:04, 10 December 2024)
- ML20195E443 + (23:55:04, 10 December 2024)
- ML20195E441 + (23:55:05, 10 December 2024)
- NRC-88-0233, Requests Review of Proposed Commitment Change Re Sys Cleanliness Insps + (23:55:06, 10 December 2024)
- ML20195E437 + (23:55:06, 10 December 2024)
- 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 + (23:55:07, 10 December 2024)
- ML20195E436 + (23:55:07, 10 December 2024)
- ML20195E433 + (23:55:08, 10 December 2024)
- ML20195E429 + (23:55:09, 10 December 2024)
- ML20195E430 + (23:55:09, 10 December 2024)
- ML20195E428 + (23:55:10, 10 December 2024)
- 05000338/LER-1988-023-01, :on 881012,missed Surveillance on Penetration Fire Barriers.Caused by Failure to Adequately Review DCP 80-21.Fire Dampers Inspected & Determined to Be Fully Operable & 18 Month Fire Barriers Inspected + (23:55:11, 10 December 2024)
- ML20195E426 + (23:55:12, 10 December 2024)
- ML20195E425 + (23:55:13, 10 December 2024)
- ML20195E423 + (23:55:14, 10 December 2024)
- ML20195E424 + (23:55:14, 10 December 2024)
- ML20195E421 + (23:55:15, 10 December 2024)
- ML20195E420 + (23:55:15, 10 December 2024)
- ML20195E419 + (23:55:16, 10 December 2024)
- RBG-23790, Forwards Summary Description of Change to Initial Test Program (ST-25B) & Summary of Safety Evaluation for Change + (23:55:17, 10 December 2024)
- ML20195E416 + (23:55:17, 10 December 2024)
- NOC-AE-000471, Application for Amends to Licenses NPF-76 & NPF-80, Relocating cycle-specific RCS-related TS Parameter Limits to COLR + (23:55:18, 10 December 2024)
- ML20195E411 + (23:55:19, 10 December 2024)
- IR 05000186/1988002 + (23:55:21, 10 December 2024)
- ML20195E406 + (23:55:22, 10 December 2024)
- ML20195E407 + (23:55:22, 10 December 2024)
- NG-98-1901, Responds to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (23:55:26, 10 December 2024)
- ML20195E404 + (23:55:26, 10 December 2024)
- 05000373/LER-1988-008-05, :on 880517,reactor Protection Sys (RPS) Bus B Tripped.Caused by Short to Ground During Jumper Installation RPS Motor Generator Set Restored to Operable Status & Rubber Boots Provided to Cover Free End of + (23:55:28, 10 December 2024)
- ML20195E400 + (23:55:29, 10 December 2024)
- JAFP-98-0365, Submits Response to NRC Request for Addl Info Re Radiological Controls Insp Exit Meeting for Insp Rept 50-333/98-07.No Commitments Made by Util in Ltr + (23:55:30, 10 December 2024)
- ML20195E399 + (23:55:30, 10 December 2024)
- ML20195E397 + (23:55:31, 10 December 2024)
- ML20195E396 + (23:55:32, 10 December 2024)
- ML20195E395 + (23:55:33, 10 December 2024)
- ML20195E393 + (23:55:33, 10 December 2024)
- ML20195E391 + (23:55:34, 10 December 2024)
- ML20195E392 + (23:55:34, 10 December 2024)
- ML20195E390 + (23:55:35, 10 December 2024)
- ML20195E387 + (23:55:36, 10 December 2024)
- SVP-98-345, Forwards Response to NRC 981103 RAI Re Proposed Change to Ts,Increasing Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve + (23:55:37, 10 December 2024)
- ML20195E384 + (23:55:38, 10 December 2024)