Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19322E932 + (05:24:53, 1 January 2025)
- ML19322E933 + (05:24:53, 1 January 2025)
- ML19322E931 + (05:24:59, 1 January 2025)
- ML19322E929 + (05:25:00, 1 January 2025)
- ML19322E928 + (05:25:06, 1 January 2025)
- ML19322E927 + (05:25:06, 1 January 2025)
- ML19322E925 + (05:25:07, 1 January 2025)
- ML19322E924 + (05:25:08, 1 January 2025)
- 05000271/LER-1980-010-03, /03L-0:on 800307,50-millisecond Value Used in GE Transient Analysis for Reactor Protection Sys Delay Time in Violation of Tech Specs.Tech Spec 3.1.A Will Be Revised + (05:25:09, 1 January 2025)
- ML19322E921 + (05:25:17, 1 January 2025)
- 05000271/LER-1980-010, Forwards LER 80-010/03L-0 + (05:25:18, 1 January 2025)
- ML19322E917 + (05:25:19, 1 January 2025)
- ML19322E916 + (05:25:20, 1 January 2025)
- ML19322E914 + (05:25:21, 1 January 2025)
- ML19322E913 + (05:25:27, 1 January 2025)
- ML19322E912 + (05:25:33, 1 January 2025)
- ML19322E910 + (05:25:39, 1 January 2025)
- ML19322E909 + (05:25:47, 1 January 2025)
- ML19322E908 + (05:25:54, 1 January 2025)
- ML19322E904 + (05:25:55, 1 January 2025)
- ML19322E902 + (05:25:55, 1 January 2025)
- ML19322E901 + (05:26:01, 1 January 2025)
- ML19322E900 + (05:26:07, 1 January 2025)
- 05000304/LER-1980-012-03, /03L-0:on 800224,while Increasing Power to 80%, Control Rod Bank D Rod Position Indicators Were Slightly Greater than 12 Steps Above Bank Demand Position.Caused by Instrument Drift.Recalibr Performed + (05:26:14, 1 January 2025)
- ML19322E898 + (05:26:15, 1 January 2025)
- ML19322E897 + (05:26:21, 1 January 2025)
- ML19322E895 + (05:26:27, 1 January 2025)
- 05000304/LER-1980-012, Forwards LER 80-012/03L-0 + (05:26:33, 1 January 2025)
- ML19322E891 + (05:26:43, 1 January 2025)
- ML19322E892 + (05:26:43, 1 January 2025)
- ML19322E890 + (05:26:44, 1 January 2025)
- ML19322E889 + (05:26:44, 1 January 2025)
- ML19322E888 + (05:26:50, 1 January 2025)
- ML19322E887 + (05:26:56, 1 January 2025)
- ML19322E885 + (05:26:57, 1 January 2025)
- ML19322E883 + (05:27:03, 1 January 2025)
- ML19322E884 + (05:27:03, 1 January 2025)
- ML19322E882 + (05:27:04, 1 January 2025)
- ML19322E881 + (05:27:06, 1 January 2025)
- ML19322E879 + (05:27:07, 1 January 2025)
- ML19322E878 + (05:27:13, 1 January 2025)
- 05000295/LER-1980-011-03, /03L-0:on 800224,while Performing Daily Radiation Monitor Operability Check,Pto App N,Unit 1 Passive Gas Failure Radiation monitor,1RTPR15 Failed Low & Could Not Be Reset.Caused by Defective Transistor ZN3638 + (05:27:19, 1 January 2025)
- ML19322E876 + (05:27:25, 1 January 2025)
- ML19322E874 + (05:27:31, 1 January 2025)
- ML19322E872 + (05:27:37, 1 January 2025)
- 05000327/LER-1980-002-01, /01T-0:on 800306,contents of Task Decontamination Collector Tank Discharged Via Liquid Radwaste Effluent Line to Cooling Tower Blowdown W/O Flow Estimates Being Performed.Caused by Misunderstanding of Tech Specs + (05:27:39, 1 January 2025)
- 05000295/LER-1980-011, Forwards LER 80-011/03L-0 + (05:27:46, 1 January 2025)
- ML19322E868 + (05:27:47, 1 January 2025)
- 05000249/LER-1980-008-03, /03L-0:on 800307,during Refueling Outage While Performing Temp Switch Calibr Surveillance,Three Temp Switches Failed to Trip Per Specs.Caused by Drift,Excessive Gap Between Actuator & Switch Plunger or Dirty Contacts + (05:27:49, 1 January 2025)
- 05000327/LER-1980-002, Forwards LER 80-002/01T-0 + (05:27:51, 1 January 2025)
- ML19322E863 + (05:28:00, 1 January 2025)