- 05000348/LER-1982-028-03, /03L-0:on 820605,during Performance of FNP-1-STP-22.16,turbine Driven Auxiliary Feedwater Pump Failed to Start.Caused by Faulty Limit Switch on Valve HV-3226.Limit Switch Replaced +
- 05000315/LER-1982-028-03, /03L-0:on 820429,during Power Ascension Loop,One Wide Range RCS Pressure indication,NPS-122,failed High. Replacement Read Low on 820523.Caused by Open Stain Gauge & Faulty Calibr,Respectively +
- 05000318/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000364/LER-1982-028, Forwards LER 82-028/01T-0 +
- 05000373/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000219/LER-1982-028, Forwards LER 82-028/03L-0.Detailed Event Analysis Encl +
- 05000339/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000324/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000338/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000259/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000387/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000305/LER-1982-028, Forwards LER 82-028/03L-0 & Updated 81-036/03X-1 +
- 05000254/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000368/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000293/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000416/LER-1982-028, Forwards LER 82-028/01T-0 +
- 05000247/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000334/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000317/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000317/LER-1981-028, Forwards LER 81-028/04T-0 +
- 05000267/LER-1982-028, Forwards LER 82-028/03L-0.Detailed Event Analysis Encl +
- 05000324/LER-1979-028, Forwards LER 79-028/03L-0 +
- 05000237/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000336/LER-1982-028, Forwards LER 82-028/03L-0.Detailed Event Analysis Encl +
- 05000416/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000395/LER-1983-028, Forwards LER 83-028/01T-0.Detailed Event Analysis Encl +
- 05000255/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000395/LER-1982-028, Forwards LER 82-028/03L-0.Detailed Event Analysis Encl +
- 05000339/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000321/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000361/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000324/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000328/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000387/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000335/LER-1982-028, Forwards LER 82-028/03L-0 +
- 05000313/LER-1978-028, Forwards LER 78-028/03L-0 +
- 05000010/LER-1978-028, Forwards LER 78-028/03L-0 +
- 05000245/LER-1997-028, Forwards LER 97-028-00 Which Documents an Event That Occurred on 970424.Commitments Made within Ltr,Listed +
- 05000482/LER-1988-028, Partially Deleted LER 88-028-00:on 881209,0.7093 Uci Co-60 Removed from Chin.Caused Likely When Individual Deposited Tools Just Prior to Exiting Containment.Surveys Taken in Area for Hot Particles +
- 05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed +
- 05000277/LER-1981-028, Forwards LER 81-028/01T-0.Detailed Event Analysis Also Submitted +
- 05000373/LER-1983-028, Forwards LER 83-028/03L-0 +
- 05000333/LER-1982-028, Forwards Updated LER 82-028/03X-1 +
- 05000325/LER-1988-028, :on 881123,pipe Crack Indications Revealed Existence of 238 Indications in 19 of 65 Welds.Caused by IGSCC of Associated Welds.Addl Testing,Repair &/Or Mods Will Be Conducted Per Generic Ltr in Future Outages +
- 05000352/LER-1989-028, :on 890424,reactor Encl Ventilation Sys Inoperable Beyond Tech Spec Limits.Caused by Tavis Corp Providing Incorrect Info About Actions Needed to Ensure That Transmitters Operated within Required Accuracy +
- 05000313/LER-1988-028, :on 880831,discovered That Piping Span Lengths Between Containment Bldg Penetrations & First Piping Supports Unacceptable.Caused by Inadequate Judgement of Original Designer.Piping Requalified +
- 05000461/LER-1989-028, :on 890628,trip of Main Generator Resulted in Turbine Trip & Automatic Reactor Scram.Caused by Spurious Signal from Malfunctioning Sudden Pressure Sensor Relay. Relay Replaced W/One That Has Air Vent +
- 05000327/LER-1988-028, :on 880723,hourly Fire Watch Patrol Through 734 Ft Elevation of Auxiliary Bldg Suspended.Caused by Valve Leaks in Safety Injection Sys.Auxiliary Bldg Gas Treatment Sys Manually Initiated +
- 05000302/LER-1989-028, :on 890725,personnel Error During Development of Rev to Surveillance Procedure Resulted in Containment Integrity Valves Not Being Properly Surveilled.Affected Valves Verified Closed & Procedure Revised +
- 05000458/LER-1989-028, :on 890512,particulate Channel of Fuel Bldg Exhaust Radiation Monitor Spiked Resulting in Automatic Initiation of Fuel Bldg Filter Trains.Caused by Degraded Voltage Conditions Due to Electrical Outage +