Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2008-10, Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief +
- Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants +
- Information Notice 2008-20, Failures of Motor Operated Valve Actuator Motors With Magnesium Alloy Rotors +
- Information Notice 2008-21, Impact of Non-Safety Electrical Support System Vulnerabilities on Safety Systems +
- Information Notice 2008-18, Loss of Safety-Related Motor Control Center Due to Bus Fault +
- Information Notice 2008-14, Criticality Safety-related Events Resulting from Fissile Material Operations under Procedures Not Reviewed by Criticality Safety Staff +
- Information Notice 2008-17, Construction Experience with Concrete Placement Process +
- Information Notice 2008-16, Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 2007 +
- Information Notice 2008-05, Fires Involving Emergency Diesel Generators Exhaust Manifolds +
- Information Notice 2008-07, Cracking Indications In Thermally Treated Alloy 600 Steam Generator Tubes And Tube-To-Tubesheet Welds +
- Information Notice 2008-06, Instrument Air System Failure Resulting in Manual Reactor Trip +
- Information Notice 2008-02, Findings Identified During NRC Component Design Bases Inspections +
- RIS 2008-30, Fatigue Analysis of Nuclear Power Plant Components +
- RIS 2008-28, Endorsement of Nuclear Energy Institute Guidance for Reactor Vessel Head Heavy Load Lifts +
- RIS 2008-24, Security Responsibilities of Service Providers and Client Licensees +
- RIS 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites +
- RIS 2008-25, Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds +
- Information Notice 2008-14, Criticality Safety-related Events Resulting from Fissile Material Operations Under Procedures Not Reviewed by Criticality Safety Staff +
- RIS 2008-19, Lessons-Learned from Recent 10 CFR Part 70 License-Transfer Application Reviews +
- RIS 2008-20, Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02) +
- RIS 2008-22, Notification of Licensees Regarding Aircraft Threats +
- RIS 2008-21, Issuance of LIC-109, Acceptance Review Procedures +
- RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations +
- Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 +
- RIS 2008-12, Enclosure 4: List of Recently Issued FSME Generic Communications +
- RIS 2008-10, Fatigue Analysis of Nuclear Power Plant Components +
- RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process +
- RIS 2008-26, Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification +
- RIS 2008-27, Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50 +
- RIS 2008-12, Enclosure 2: List of Low-Level Radioactive Waste Compacts and Unaffiliated States +
- RIS 2008-12, Enclosure 3 - Bibliography +
- RIS 2008-12, Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste +
- RIS 2008-12, Considerations for Extended Interim Storage of Low-Level Radioactive Waste By Fuel Cycle and Materials Licensees +
- RIS 2008-05, Updated NRC Regulatory Issue Summary 2008-05, Revision 1: Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal +
- RIS 2008-06, Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles +
- RIS 2008-04, Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process +
- RIS 2008-03, Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants +
- Information Notice 2008-20, Failures of Motor Operated Valve Actuator Motors with Magnesium Alloy Rotors +
- Information Notice 2008-07, Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds +
- Information Notice 2008-04, Recent Counterfeit Valves and Circuit Breakers Supplied to Nuclear Power Plants +
- Information Notice 2008-10, Response to Indications of Potential Tampering Vandalism or Malicious Mischief +
- Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation +
- RIS 2008-08, Voluntary Submission of Performance Indicator Data +
- RIS 2008-23, The Global Threat Reduction Initiative (Grti) Domestic Threat Reduction Program & Federally Funded Voluntary Security Enhancements for High-Risk Radiological Material +
- RIS 2008-10, E-mail to J. Roe & D. Walters, NEI, Request for Comments on RIS-2008-10, Supplement 1, Advance Planning for Firearms Background Checks +
- Information Notice 2008-15, Emergency Response Data System Test Schedule Revised +
- RIS 2008-17, Voluntary Security Enhancements for Self-Contained Irradiators Containing Cesium Chloride Sources +
- Information Notice 2008-13, Main Feedwater System Issues and Related 2007 Reactor Trip Data +
- Information Notice 2008-03, Precautions to Take Before Sharing Sensitive Security-Related Information +
- RIS 2008-13, Status and Status and Plans for Implementation of NRC Regulatory Authority for Certain Naturally-Occurring and Accelerator-Produced Radioactive Material +