Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2007-37, Buildup of Deposits in Steam Generators +
- Information Notice 2007-36, Emergency Diesel Generator Voltage Regulator Problems +
- Information Notice 2007-32, Out of Service Equipment Connected To In Service Process Line Results in Fissile Solution Spill at Fuel Cycle Facility +
- Information Notice 2007-30, Radiological Controls Create Criticality Safety Accident Scenario for Fissile Solution Container Transport at Fuel Cycle Facility +
- Information Notice 2007-34, Operating Experience Regarding Electrical Circuit Breakers +
- Information Notice 2007-38, Ensuring Complete and Accurate Information in the Documentation of Training and Experience for Individuals Seeking Medical Authorization Under the Alternate Pathway +
- Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment +
- Information Notice 2007-27, Recurring Events and Trends Involving Emergency Diesel Generator Operability +
- Information Notice 2007-31, U.S. Food and Drug Administration Announcement Related to Sleep Disorder Drugs +
- Information Notice 2007-24, Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 2006 +
- Information Notice 2007-23, Inadvertent Discharge of Halon 1301 Fire Suppression System Due to Incorrect and/or Out of Date Procedures +
- Information Notice 2007-22, Recent Hydrogen Fluoride Exposures at Fuel Cycle Facilities +
- Information Notice 2007-17, Fires at Nuclear Power Plants Involving Inadequate Fire Protection Administrative and Design Controls +
- Information Notice 2007-18, Operating Experience Regarding Entrainment of Gas or Debris into Auxiliary Feedwater Systems +
- Information Notice 2007-15, Effects of Ethernet-based, Non-Safety Related Controls on the Safe and Continued Operation of Nuclear Power Stations +
- Information Notice 2007-12, Tactical Communications Interoperability Between Nuclear Power Reactor Licensees and First Responders +
- Information Notice 2007-08, Potential Vulnerabilities of Time-Reliant Computer-Based Systems Due to Change in Daylight Saving Time Dates +
- Information Notice 2007-11, Recent Operator Performance Issues at Nuclear Power Plants +
- Information Notice 2007-09, Equipment Operability Under Degraded Voltage Conditions +
- Information Notice 2007-03, Reportable Medical Events Involving Patients Receiving Dosages of Sodium Iodide Iodine-131 Less Than the Prescribed Dosage Because of Capsules Remaining in Vials After Administration +
- Information Notice 2007-20, Use of Blank Ammunition +
- Information Notice 2007-07, Potential Failure of All Control Rod Groups to Insert in a Boiling Water Reactor (BWR) Due to a Fire +
- Information Notice 2007-10, Yttritium-90 TheraSpheres and SirSpheres Impurities +
- Information Notice 2007-40, Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees +
- Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures +
- Information Notice 2007-04, Construction Experience Related to the Assurance of Quality in the Construction of Nuclear Power Plants +
- Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems +
- Information Notice 2007-25, Recommendations From the Advisory Committee on the Medical Use of Isotopes for Improved Compliance with 10 CFR 35.40 and 35.27 +
- RIS 2007-16, U.S. Nuclear Regulatory Commission Regulatory Issue Summary of 2007-16. Revision 1: Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses +
- RIS 2007-21, Rev. 1, Adherence to Licensed Power Limits +
- RIS 2007-29, Clarified Guidance for Licensed Operator Watch Standing Proficiency +
- RIS 2007-23, Date for Operation of National Source Tracking System +
- RIS 2007-25, Combined License Application Acceptance Review Process +
- Information Notice 2007-23, Inadvertent Discharge of Halon 1301 Fire Suppression System Due to Incorrect And/Or Out of Date Procedures +
- RIS 2007-17, Withdrawn NRC Regulatory Issue Summary 2007-017: Preparation and Scheduling of Operator Licensing Examinations +
- RIS 2007-15, Unescorted Access to Materials for Non-Manufacturer and Distributor Service Providers +
- RIS 2007-14, Fingerprinting Requirements for Licensees Implementing the Increased Control Order +
- RIS 2007-21, Adherence to Licensed Power Limits +
- RIS 2007-27, Improving Public Understanding of the Risks Associated with Medical Events +
- Information Notice 2007-18, Operating Experience Regarding Entrainment of Gas or Debris Into Auxiliary Feedwater Systems +
- RIS 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses +
- RIS 2007-08, Updated Licensing Submittal Information to Support the Design-Centered Licensing Review Approach +
- RIS 2007-06, Regulatory Guide 1.200 Implementation +
- RIS 2007-03, Ionizing Radiation Warning Symbol +
- RIS 2007-20, Implementation of Primary-To-Secondary Leakage Performance Criteria +
- RIS 2007-07, Clarification of Increased Controls for Licensees That Possess Collocated Radioactive Material During Transportation Activities +
- Information Notice 2007-10, Yttritium-90 Theraspheres and Sirspheres Impurities +
- RIS 2007-24, NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery +
- RIS 2007-01, Clarification Of NRC Guidance For Maintaining a Standard Emergency Action Level (EAL) Scheme +
- RIS 2007-09, Examples of Recurring Requests for Additional Information (RAIs) for 10 CFR Part 71 and 72 Applications +