Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- FOIA/PA-2013-0151 +
- ML12271A459 +
- ML12339A617 +
- ML091100056 +
- ML100830513 +
- ULNRC-05893, Callaway, Unit 1, Enclosure 21 to ULNRC-05893 - Callaway 2008 Air Emission Report +
- ML12090A854 +
- ML092020070 +
- ML091200017 +
- ML101390199 +
- TAC:ME1439 +
- TAC:ME1466 +
- ML093420579 +
- TAC:ME1514 +
- TAC:ME0024 +
- ML091730021 +
- L-MT-09-020, License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation +
- ML091671843 +
- ML091671161 +
- NG-09-0413, Submittal of Inservice Inspection Report +
- NG-09-0395, Response to Preliminary White Finding Inspection Report 2009009 +
- LIC-09-0037, Transmittal of Core Operating Limit Report (Colr), Revision 37 +
- ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses +
- RBG-46916, Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year Interval +
- ML091550270 +
- ML091550026 +
- ML091540204 +
- ML091540079 +
- ML091540015 +
- NLS2009037, Response to Nuclear Regulatory Commission Request for Additional Information Alternative Source Term +
- ML091530162 +
- ML091530152 +
- ML091210629 +
- TMI-09-064, Updated Appendix A.5 License Renewal Commitment List +
- LIC-09-0036, License Amendment Request 09-03,Revision to Technical Specifications Sections 2.0.1 & 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source & Deletion of Diesel Generator Surveillance Requirements 3.7(1)e +
- ML091530050 +
- 1CAN050902, Arkansas, Unit 1, Requests for Relief from ASME Section XI Volumetric, Surface and Visual Examination Requirements - Third 10-Year Interval +
- ML091520599 +
- ML091520256 +
- L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 +
- RS-09-062, Stations, Units 1 & 2 - Response to Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents +
- ML091490817 +
- GNRO-2009/00018, Inservice Inspection (Lsi) Relief Requests GG-ISI-005 Through 012 American Society of Mechanical Engineers Section XI Second 10-Year Inspection Interval Closeout +
- ML091490666 +
- ML091490607 +
- ML091490553 +
- ML091490551 +
- ML091490550 +
- ML091490549 +
- ML091490548 +