Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13248A611 + (August 23, 2013)
- GO2-13-121, First Six Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation + (August 23, 2013)
- RA-13-019, Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4 + (August 23, 2013)
- ML13247A033 + (August 23, 2013)
- ML13246A087 + (August 23, 2013)
- ML13246A084 + (August 23, 2013)
- ML13242A000 + (August 23, 2013)
- L-13-285, Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (August 23, 2013)
- ML13240A017 + (August 23, 2013)
- ML13239A514 + (August 23, 2013)
- SCH13-034, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report + (August 23, 2013)
- ML13239A171 + (August 23, 2013)
- NRC 2013-0081, Large Break Loss-of Coolant Accident Margin Summary Sheet- 30-Day Report + (August 23, 2013)
- TMI-13-105, Update 10 of the Post-Defueling Monitored Storage Safety Analysis Report + (August 23, 2013)
- ML13237A002 + (August 23, 2013)
- ML13235A347 + (August 23, 2013)
- ML13235A314 + (August 23, 2013)
- Press Release-II-13-053, NRC Issues Confirmatory Action Letter to Browns Ferry Nuclear Plant + (August 23, 2013)
- TAC:MF0698 + (August 23, 2013)
- ML13235A003 + (August 23, 2013)
- ML13233A364 + (August 23, 2013)
- ML13228A167 + (August 23, 2013)
- ML13197A210 + (August 23, 2013)
- ML15208A125 + (March 2, 2004)
- ML13247A752 + (March 12, 2013)
- 05000237/LER-2013-001, Secondary Containment Inoperable Due to Two Interlock Doors Being Open Simultaneously + (August 23, 2013)
- 05000412/LER-2013-001, Gas Void in Emergency Core Cooling System Pump Suction Header Results in a Condition Prohibited by Technical Specifications + (August 23, 2013)
- ML21103A229 + (August 25, 2013)
- ML21102A383 + (August 25, 2013)
- LR-N13-0176, PSEG Nuclear LLCs First Six-Month Status Report for Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) + (August 25, 2013)
- LR-N13-0175, PSEG Nuclear LLCs First Six-Month Status Report for the Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-1 + (August 25, 2013)
- IR 05000272/2013008 + (August 26, 2013)
- IR 05000412/2013201 + (August 26, 2013)
- IR 05000369/2013503 + (August 26, 2013)
- ML13242A009 + (August 26, 2013)
- ML13240A130 + (August 26, 2013)
- IR 05000387/2013301 + (August 26, 2013)
- ML13238A055 + (August 26, 2013)
- ML13238A188 + (August 26, 2013)
- ML14205A441 + (August 26, 2013)
- ML13242A087 + (August 26, 2013)
- ML13233A248 + (August 26, 2013)
- NOC-AE-13003027, STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Ord + (August 26, 2013)
- ML13247A052 + (August 26, 2013)
- AEP-NRC-2013-72, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (August 26, 2013)
- RA-13-016, Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (August 26, 2013)
- ML13241A300 + (August 26, 2013)
- AEP-NRC-2013-71, First Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies + (August 26, 2013)
- PLA-7073, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (NRC Order EA-12-051) + (August 26, 2013)
- PLA-7071, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049) + (August 26, 2013)
- LIC-13-0103, Request to Obtain Us Army Corps of Engineers Information Required to Provide Response to March 12, 2012 Request for Information, Enclosure 2, Recommendation 2.1 Flooding + (August 26, 2013)
- W3F1-2013-0032, Core Operating Limits Report - Cycle 19 Revision 1 + (August 26, 2013)
- ML13240A125 + (August 26, 2013)
- PLA-7072, Request for Implementation Date Relief in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (August 26, 2013)