Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266B426 + (September 14, 1984)
- ML20266B344 + (September 14, 1984)
- ML20217N067 + (September 14, 1984)
- ML20129D109 + (September 14, 1984)
- 05000244/LER-1984-009, :on 840817,diesel Generator a Started Upon Placing Safeguard Bus 18 Switches S5 & S6 in Test Position for Procedure PT-9.1.Caused by Intermittent Voltage from TBD-1 States Deck to Control Logic Board + (September 14, 1984)
- 05000374/LER-1984-054, :on 840818,isolations of Reactor Water Cleanup Occurred.Under Same Conditions,Two Other Reactor Water Cleanup Isolations Occurred.Caused by High Differential Flow.Corrective Actions Under Review + (September 14, 1984)
- 05000374/LER-1984-055, :on 840818,RHR (Bo) Full Flow Test Valve 2B, 2E12-F024B,failed to Close.Caused by Loose Interface Between Valve Stem & Disk.Skirt Added to Disk to Increase Area Contacting Side Guides + (September 14, 1984)
- 05000254/LER-1984-017-03, :on 840816,mechanical Vacuum Pump Began Tripping Due to High Temp.Caused by Installation of South Steam Jet Air Ejector Suction Valves 90 Degrees Out of Proper Orientation + (September 14, 1984)
- 05000325/LER-1984-013, :on 840817,control Bldg Emergency Air Filtration Sys Train B Automatically Started Due to Spurious Fire Alarm in Unit 2 Reactor Turbine Gauge Board.Train Returned to Standby + (September 14, 1984)
- 05000374/LER-1984-053, :on 840816,hydrogen Sample on Offgas Sample Missed During Unit Startup.Caused by Communication Problem. Need for Better Communication Emphasized + (September 14, 1984)
- 05000348/LER-1984-016, :on 840815,discovered Surveillance Test Procedure for Measuring Stroke Time of Reactor Coolant Drain Tank Discharge Containment Isolation Valve LCV-1003 to Be Inadequate + (September 14, 1984)
- 05000416/LER-1984-038, :on 840815,determined Surveillance Requirements of Tech Spec 4.8.1.1.2.c Not Fully Met on 840208 & 0503 for Diesel Generator Fuel Viscosity Analysis & on 840524 for Gas Turbine Generator Fuel Viscosity + (September 14, 1984)
- 05000348/LER-1984-019, :on 840217,during Control Room Insp,Seven Cables in Fire Barrier Penetration Not Sealed Internally. Caused by Procedural Inadequacy.Procedures Revised to Provide Specific Guidance for Installation + (September 14, 1984)
- 05000348/LER-1984-017, :on 840815,main Feedwater Regulating Valve 1A Placed on Manual Jack for Repair of Leaking Diaphragm, Rendering Feedwater Isolation Inoperable.Caused by Air Leak. Diaphragm Replaced + (September 14, 1984)
- 05000483/LER-1984-030, :on 840816,discovered That Average of Only Three Cooler Inlet Temps Taken,Violating Tech Specs.Caused by Operators Misinterpreting Tech Spec Requirements.Night Order Issued to Clarify Tech Spec Requirement + (September 14, 1984)
- 05000327/LER-1984-052, :on 840817,during Review of Procedure SI-144.2, Control Room Emergency Ventilation Sys Test, Discovered That Incorrect Calculation of Duct Area Resulted in Both Trains of Sys Left Lower than Specs + (September 14, 1984)
- 05000287/LER-1984-005-03, :on 840814,trip Occurred When Instrument Air Line to Powdex Outlet Valves Accidentally Sheared.Caused by Attempt to Straighten Bend Which Resulted from Work on Pipe Above Instrument Air Line + (September 14, 1984)
- ML20098E006 + (September 14, 1984)
- ML20198F478 + (September 14, 1984)
- ML20106A546 + (September 14, 1984)
- ML20097D137 + (September 14, 1984)
- ML20136F194 + (September 14, 1984)
- ML20137K104 + (September 14, 1984)
- ML18037A037 + (September 14, 1984)
- L-84-252, Forwards Emergency Plan Implementing Procedures 1107, Duties of Emergency Planning Supervisor,Offsite Emergency Organization & 1211, Activation & Use of Emergency News Ctr (Turkey Point),Offsite Emergency Organization + (September 14, 1984)
- L-84-253, Requests Extension Until 841019 to Provide Addl Info Re 10-yr Inservice Insp Summary Plan.Extension Due to Difficulties of Researching Large Amount of Info & Inservice Insp Manual Preparation + (September 14, 1984)
- GO2-84-512, Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment + (September 14, 1984)
- ML17215A594 + (September 14, 1984)
- ML16341C213 + (September 14, 1984)
- ML15264A257 + (September 14, 1984)
- ML20097D127 + (September 14, 1984)
- ML20098D615 + (September 15, 1984)
- ML20097J394 + (September 15, 1984)
- ML20097G354 + (September 15, 1984)
- ML20093H759 + (September 15, 1984)
- ML20093H738 + (September 15, 1984)
- ML20093H710 + (September 15, 1984)
- ML20093H698 + (September 15, 1984)
- ML20265F216 + (September 15, 1984)
- ML20259F398 + (September 15, 1984)
- ML20259F329 + (September 15, 1984)
- ML20214W321 + (September 15, 1984)
- ML20033D832 + (September 15, 1984)
- ML20266D487 + (September 16, 1984)
- ML17298B271 + (September 17, 1984)
- ML18092A280 + (September 17, 1984)
- ML18051B069 + (September 17, 1984)
- ML18051B068 + (September 17, 1984)
- ML18051B067 + (September 17, 1984)
- ML18142A053 + (September 17, 1984)
- ML20100P363 + (September 17, 1984)
- ML20100P361 + (September 17, 1984)
- ML20100P354 + (September 17, 1984)
- ML20100P351 + (September 17, 1984)
- ML20100P349 + (September 17, 1984)
- ML20100P347 + (September 17, 1984)
- ML20100P341 + (September 17, 1984)
- ML20100P323 + (September 17, 1984)
- ML20100P318 + (September 17, 1984)
- ML20100P305 + (September 17, 1984)
- ML20100P300 + (September 17, 1984)
- ML20100P294 + (September 17, 1984)