[cn C ity 1@1 sWSBC Crankshaft Torsional Stress Calculations y
'e for 8 L 17x21 Engine-Generator Set CCNSUL.TANTS O b rr x
~
5.
COMPARISON OF FREE END AMPLITUDE _
There are now several sets of test and calculated data on free end amplitude taken on both the 13 x 11 and 13 x 12 replacement crankshafts at rated con-ditions. TDI's torstograph data shows three to five amplitudes of selected orders and the corresponding SRSS value. SWEC test report shows a full array of the free end amplitudes, and its corresponding true sum results (0.69 degree). The experimental spread was 0.55 to 0.69 degree when
.1 several recordings were studied.
T C
Original TDI Teste SEC Test FaAA Calc TOI Test SEC Test
~~
1/8/84s i3/30/84*
5/19/84 9/ 28/83* l 12/12/ 75 9/19/83s a
04te 1/8/84' l l
13 x 12 13 x 11 0.5 0.10 0.06 0.07 0.07 0.15 1.5 0.17 0.21 0.17 0.18 0.14 0.21 0.18 2.5 0.12 0.12 0.13 0.14 0.11 0.15 0.14 z
3.5 0.06 0.06 0.05 0.07 4.0 0.36 0.35 0.33 0.34 0.33 0.43 0.46 4.5 0.06 0.07 0.07 0.14 0.12 5.0 0.12 0.03 0.03 0.03 0.04 5.3 0.13 0.12 0.12 0.04 6.0 0.01 0.01 0.01 0.07 6.5 0.01 8.st 8.5 0.15 8.0 a.m 525s 0.43 0.45 0.42 0.42 0.40 0.50 0.50 frue Su.
0.55 - 0.69 0.66 0.59
- Shop fest for Gulf States. SN-74038, overall per meter
=
" Shop Test for EDOK-ETER. SM-74038. overall per meter Fo-the 13 x 11 shaft, the SWEC as well as TDI test data shows around 30 -
40% higher 4.0 order amplitude than that of 13 x 12 shaft. This irdicates that the 13 x 12 shaft stress level is indeed significaatly reducec. For the 13 x 12 shaft TORVAP C true sum amplitude checks well within tha experi mental spread of the SWEC test.
In addition, TORVAP SRSS result checks within a few percent of the test data furnished by either TDI or SWEu.
.h. >
l(.
4 y[a f,.[.!
r :s-a 4
- Evaluation of E.mergency Olesel Generator Cranksnafts at Shoremas and Grano Gulf Muclear power Stations.* Failure Analysis Associatas. Palo.
Alto. Calt fernia. Maren M.1984 B.
- Fleid 7est of E:neriency Olesel Generator 103.* Sercel and Hall. $ tone and deoster Engineering Corporation. Figure B-33.
Feoruary.1984 9.
- E.mergency Olesel Gener ccr Cranksnart Failure In'estigation Shortnam
!tuclear Nwer Station.* Failure Analysis Associates. Palo Alto. _Calt for-nia. Octocer 31. 1983.