Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML061280021 +
- ML18153C737 +
- ML003743649 +
- ML19296D145 +
- ML031750588 +
- ML20076N024 +
- ML20104B169 +
- ML20095J043 +
- ML20071Q145 +
- ML20141M102 +
- ML20138P498 +
- IR 05000440/1998015 +
- ML20195H873 +
- ML20203G904 +
- BECO-92-002, Special Rept:On 911214,electric Fire Pump Declared Operable. Caused by Electrical Fault in Motor Controller.Temporary Mod Continued to Keep Electric Fire Pump Available Until New Motor Controller Procured +
- IR 05000424/2022003 +
- A08881, Responds to NRC Re Violations Noted in Insp Rept 50-423/90-08.Corrective Action:Operators Directly Involved W/Event Removed from Licensed Duties & Counseled by Operations Manager on Causes of Event +
- 05000324/LER-1989-012-02, :on 890830,emergency Bus E8 Temp high-480 Volt Ground Alarm Annunciation Occurred.Disassembly of Motor Revealed Failure of Windings.Root Cause for Failure Undetermined.Motor Rebuilt & Reinstalled +
- 05000352/LER-1987-045, :on 870830,standby Gas Treatment Sys Initiated. Caused by Polyphase Fault to Ground on Unit 2 Load Ctr Transformer,Producing Low Voltage Condition on Unit 1 Instrument Panel.Transformer Returned to Mfg +
- ML20209F738 +
- ML20204J191 +
- 05000286/LER-1985-010-01, :on 851129,unit Tripped Due to Inadvertent Main Boiler Feedpump Shutdown & Low Water Level in Steam Generator 34.Caused by Painter Inadvertently Actuating Trip Lever.Painters Reinstructed +
- 05000285/LER-1985-003, :on 850321,ventilation Isolation Actuation Signals Occurred.Caused by Increasing Activity Levels as Monitored by Vent Stack Particulate Monitor RM-061.Ion Exchanger Isolated,Decreasing Activity Levels +
- 05000244/LER-1985-002, :on 850121,control Room Notified That Low Frequency of 59.9 Hertz Existed.Caused by Ny Power Pools Imbalance Between Load Demand & Electrical Generation Due to Cold Weather.Diesel Generator Operation Begun +
- 05000333/LER-1993-007-01, :on 930322,determined That Thermal Power Trip Function of APRM Not Tested to Completion When RPS Bypassed Resulting in Blocked Initiation of Scram Signal.Caused by Procedural Deficiency.Procedures Revised +
- ML20029E600 +
- ML20041B353 +
- 05000280/LER-1997-001, :on 970123,shutdown Occurred Due to Drain Line Weld Leak.Inspected & Tested Turbine Trip Actuation Circuitry +
- 05000315/LER-1987-021, :on 871013,ESF Actuation Occurred Due to Feedwater Flow/Steam Mismatch Coincident W/Low Level on Steam Generator 11.Caused by Failure of East Main Feedwater Pump Shaft Driven Oil Pump.Bearings Replaced +
- 05000397/LER-1991-028, :on on 910930,containment Airlock Door Seal Leakage Test Not Performed within Allowable Surveillance Interval.Caused by Inadequate Personnel Work Practices. Master Startup Checklist Amended +
- 05000260/LER-2012-003, Regarding 480V Reactor Motor Operated Valve Board 2E Failed to Manually Transfer to Alternate Power +
- 05000281/LER-2011-003, Regarding Isolation of Main Feedwater Pump Results in Auxiliary Feedwater Actuation +
- 05000244/LER-2003-006, Regarding Emergency Diesel Generator Start Resulting from Loss of Off-Site Power Circuit 751 +
- ML021440220 +
- ML17180A612 +
- ML20199C855 +
- 05000334/LER-1982-048-03, /03L-2:on 821018,during Startup of Main Feed Pump 1B Apparent Overcurrent Condition Detected.Caused by Conservative Transformer Primary Side Overcurrent Relay Setting.Replacement of Relays Planned +