Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000346/LER-2014-003 +
- ML19345D838 +
- SVP-06-099, Request for Enforcement Discretion Technical Specification 3.1.7, Standby Liquid Control (SLC) System +
- ML052630397 +
- ML19325D332 +
- NL-03-144, August 2003 Monthly Operating Report for Indian Point, Unit 3 +
- ML020850624 +
- ML20082R786 +
- ML20096E075 +
- ML20095A761 +
- ML20094J251 +
- ML20115C743 +
- ML20154C577 +
- ML20198L627 +
- ML20064N465 +
- ML20214M148 +
- ML20217D231 +
- ML20211D993 +
- ML21214A113 +
- ML22075A123 +
- 2CAN069202, Monthly Operating Rept for May 1992 for Arkansas Nuclear One Unit 2 +
- 05000461/LER-1989-011, :on 890226,water Level in Upper Containment Fuel Pools Dropped Below Min Level of 23 Ft Above Top of Reactor Pressure Vessel.Caused by Insufficient Training. Procedure Re Fuel Pool Cooling Revised +
- 05000293/LER-1992-015, On 921125,RCIC Became Inoperable & 7-day LCO Entered.Caused by Turbine Trip Throttle Valve Closing When Valve Linkage Accidently Contacted.Valve Manually Reset & Personnel Counseled & Instructed +
- 05000261/LER-1982-012-03, /03L-0:on 820906,at 94% Power,Letdown Relief Valve CVC-203 Lifted & Would Not Reseat.Caused by Water Hammer Due to Operator Error in Realignment of Charging Pump from Recirculation to Normal Operation.Operator Counseled +
- 05000374/LER-1989-011, :on 890826,spurious Reactor Protection Sys Actuation Occurred.Definite Cause of Trip Not Determined. Brief Disturbance in Reactor Protection Sys Allowed Some Contactors to Trip.Procedure Revised +
- ML20023A313 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000311/LER-1990-037, :on 900922,after Resetting 2C Sec (Upon Successful Completion of 2C DG 1 H Surveillance run),2C Sec Mode I Accident Safeguards Actuation Occurred +
- 05000250/LER-1997-009, :on 971114,discovered That CR Console Switch for 3B SGFP Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR +
- 05000254/LER-2006-004, For Quad Cities, Unit 1, Regarding Through-wall Leak in Standby Liquid Control Tank Due to the Original Construction Use of Grout with Leachable Halogens +
- L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With +
- 05000293/LER-1991-005, :on 910325,loss of AC Power to B Train of Safety Sys Occurred.Caused by Failure of Automatic Voltage Regulator.Calibr Frequency to Be Established & Calibr Procedures to Be Developed +