Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000316/LER-2002-006, Regarding Reactor Trip Due to Low Condenser Vacuum +
- IR 05000346/2011005 +
- IR 05000346/2011002 +
- ML14321A685 +
- ML14206B001 +
- ML12058A249 +
- ML12044A361 +
- ML17319A648 +
- ML18165A415 +
- ML17340A300 +
- BVY 14-065, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) and Request to Rescind Order +
- ML18353B644 +
- ML19148A655 +
- ML20038A769 +
- NRC 2003-0067, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 and MR 02-018-2 Supplement 2 and Response to Request for Additional Information +
- ML031060646 +
- ML20078N425 +
- ML20076F978 +
- ML20092F425 +
- IR 05000528/1985021 +
- ML20148Q684 +
- ML20133G016 +
- ML20132G724 +
- ML20129G832 +
- ML20133L401 +
- ML20205P674 +
- ML20207B429 +
- ML20318A043 +
- IR 05000245/1987004 +
- ML21098A047 +
- ML22132A251 +
- BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station +
- BVY-92-053, Monthly Operating Rept for Apr 1992 for Vermont Yankee Nuclear Power Station +
- ML22301A023 +
- BECO-LTR-93-003, Monthly Operating Rept for Dec 1992 for Pilgrim Nuclear Power Station +
- ML23082A250 +
- ML23318A429 +
- ML23284A044 +
- ML24079A279 +
- 05000368/LER-1987-004, :on 870425,while Performing Plant Cooldown, Reactor Protection Sys Actuation Occurred Due to High Water Level in Steam Generation A.Caused by Personnel Error. Procedure Revised +
- ML20198S534 +
- 05000293/LER-1992-018, :on 921220,reactor Scram & Closing of Main Steam Isolation Valves Due to Trip Settings of Main Steam Radiation Monitors.Procedure 3.M.2-7.6 Revised to Record Alarm & Trip Settings in Scientific Notation +
- 05000254/LER-1992-004-03, :on 920207,Unit 1 Reactor Scram Occurred Due to Group I Isolation.Caused by Spurious Main Steam Line High Flow Trip Due to Unknown Cause.Applicable Instruments Calibr & Functionally Verified +
- 05000293/LER-1994-007, :on 941228,primary Containment Pressure Boundary Degraded Due to Uninstalled Instrument Plug.Caused by Personnel Error.Isolation Valves Will Be Installed on Selected Instruments +
- ML20043G601 +
- 05000369/LER-1981-060, Forwards LER 81-060/03L-0.Detailed Event Analysis Encl +
- ML19340E903 +
- 05000281/LER-1997-002, :on 961213,automatic Reactor Trip Occurred During Planned Shutdown.Caused by Steam Flow/Feedwater Flow Mismatch.Rps Functioned as Designed & Plant Placed in Hot Shutdown +
- ML18089A506 +
- 05000237/LER-1987-032-02, :on 871020,primary Containment Group I Isolation & Reactor Scram Occurred.Caused by Vibration of Main Steam Line Low Pressure Switch.Isolators Installed to Make Switches Less Susceptible to Vibration +