Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15282A240 +
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan +
- ML19332G326 +
- 05000498/LER-1989-023-01, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Attempt to Secure Essential Chiller 12C Resulted in Trip.Caused by Failure of Voltage Regulator.Regulator Returned to Mfg +
- ML041840130 +
- ML041350485 +
- ML20086L644 +
- ML20082H545 +
- ML20082B103 +
- ML20092J244 +
- ML20115C743 +
- ML20108B003 +
- ML20140B581 +
- ML20133H479 +
- ML20213H077 +
- L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with +
- U-601834, Special Rept:On 910404,during Surveillance Diesel Generator 1A Reached Required Voltage & Frequency But Failed to Close & Phase Undervoltage Relay B-C Tripped.Cause Not Determined.Racking Mechanism Will Be Inspected & Lubricated +
- BVY-93-122, Monthly Operating Rept for Oct 1993 for Vermont Yankee Nuclear Power Station +
- 05000346/LER-1998-006, :on 980624,loss of Offsite Power Was Noted. Caused by Tornado Damage to Switchyard.Tested & Repaired Affected Electrical & Mechanical Equipment Necessary to Restore Two Offsite Power Sources +
- 05000341/LER-1987-016, :on 870510,reactor Protection Sys Actuated & ESFs Challenged Due to Transient in Common Ref Leg.Caused by Repairman Attempt to Crack Open Ref Leg Isolation Valve. Valves to Improve Repairman Control Installed +
- 05000414/LER-1995-001-02, :on 950221,reactor Trip Due to Closure of MSIV Occurred.Caused by Degraded Optical Isolator within Control Circuitry for Msiv.Degraded Isolators Tested & Replaced +
- 05000267/LER-1988-014, :on 881008,plant Protective Sys Loop Shutdown Function for Loop II Unexpectedly Actuated.Specific Cause Unidentified.Station Svc Requests to Blowdown All Circulator Water Flow Performed +
- 05000498/LER-1987-024, :on 871208,control Room Ventilation Actuation to Recirculation Mode Occurred.Caused by Personnel Error. Flow Pushbuttons Disabled & Technicians Briefed on Importance of Attention to Detail +
- 05000346/LER-1985-011, :850602,during Testing,High Turbine Vibration Signal Tripped Turbine,Resulting in Reactor Trip.Caused by High Vibration Due to Reopening of Turbine Control Valve 3. Main Turbine Steam Valve Test Modified +
- 05000395/LER-1984-041, :on 840928,reactor Tripped from Approx 10% Power & Intermediate Range High Flux Bistable Did Not Reset on Decreasing Power.Caused by Operator Error.Incident Reviewed W/Personnel +
- 05000414/LER-1995-001, :on 950221,automatic Reactor/Turbine Trip Occurred.Caused by Degraded Optical Isolator within Control for Msiv.Testing & Replacing Degraded Isolators in Control Cicuitry for MSIV +
- 05000498/LER-1989-023, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Declared Inoperable. Caused by Contact Oxidation & Low Contact Pressure.Chiller Auxiliary Relay Cleaned & Adjusted +
- ML20053B939 +
- 05000219/LER-1989-022, :on 891005,Tech Spec Violation Occurred When Licensed Group Shift Supervisor Left Control Room W/O Informing Operating Supervisor.Caused by Personnel Error. Individual Involved Counseled +
- 05000400/LER-1987-041, :on 870804,restoration Alignment on Clearance for Placing Dryer 1B Back Into Svc Incorrect.Caused by Personnel Error.Valve Lineup for Instrument Air Dryer 1B Put Into Correct Configuration +
- 05000397/LER-1990-028, :on 901023,degradation of Primary Containment Pressure Boundary Caused Plant Shutdown,Due to Cracks on HPCS Small Bore Piping +
- 05000374/LER-2011-001, Regarding Turbine Control Valve Fast Closure Trip Oil Pressure Switch Inoperable Due to Incomplete Surveillance Testing +
- 05000339/LER-1987-015-02, :on 871104,steam Generator a Steam Flow Channel III Determined Inoperable.Caused by Installation Error in Field Wiring.Leads Reversed & Readings Returned to Normal +
- 05000261/LER-1983-007-03, /03L-1:on 830429,during Testing of Pressurizer Porv,Valve RC-455C Failed to Meet Required Cycle Time & to Open Fully.Caused by Galling of Valve Plug to Cage.Valve Rebuilt.Stem Guide Bushing Installed +