Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317A877 +
- ML19345F579 +
- ML19343B972 +
- ML19256F251 +
- ML20039G065 +
- CPSES-200300346, Annual Operating Report for 2002 +
- CPSES-200203965, November 2002 Monthly Operating Report for Comanche Peak Steam Electric Station +
- ML023600295 +
- ML20099E889 +
- ML20095D739 +
- ML20147E199 +
- ML20237K971 +
- ML20135H315 +
- ST-HL-AE-3128, Special Rept:On 890523,24 & 0608,diesel Generator 13 Tripped During Testing Procedures.First Failure Caused by Increased Resistance Across Contacts of Unit Parallel Mode & Second & Third Failures by Inadequate Air Flow.Contacts Cleaned +
- 1CAN038506, Monthly Operating Rept for Feb 1985 +
- 05000219/LER-1985-025, :on 851216,inadvertent Automatic Main Steam Line Isolation Occurred During Startup Activities.Caused by Operator Cognitive Error.Operator Training Re Event Will Be Initiated +
- 05000302/LER-1996-017, :on 960531,reactor Tripped on High Reactor Coolant Pressure During Turbine Testing.Caused by Debris in Manual Isolation Valve.Post Trip Analysis Performed & Request for Engineering Assistance Initiated +
- 05000254/LER-1996-004-01, :on 960130,HPCI Sys Declared Inoperable Due to Gland Exhauster Breaker Trip.Hpci Gland Exhauster Breaker Replaced & Tested for Proper Operation & AOP Time Delay Bypass Switches in Starting Circuit Replaced +
- 05000352/LER-1991-027-01, :on 911112,inadvertent Actuation of Primary Containment & Reactor Vessel Isolation Control Sys Resulted in Closure of Gas Analyzer Sample Lines to Drywell.Cause Undetermined.Defective Relay Replaced +
- 05000352/LER-1991-026-01, :on 911112,electrical Lead from Primary Containment Isolation Valve to Combustible Gas Analyzer Inadvertently Grounded.Caused by Blown Fuse in Panel. Personnel Counseled & Mgt Directive Issued +
- 05000352/LER-1990-015-01, :on 900813,RWCU Sys Isolation Occurred. Isolation Resulted from High Regenerative HX Room Temp. Caused by Leaking Sys Vent Valves.Leaking Valves Replaced +
- 05000388/LER-2012-001, For Susquehanna, Unit 2, Regarding Two Control Room Floor Cooling Systems Inoperable +
- 05000346/LER-1998-002-01, Regarding Plant Trip Due to High Pressurizer Level as a Result of Loss of Letdown Capability +
- ML20032D076 +
- 05000352/LER-1988-031, :on 881006,determined That Plant Not in Compliance W/Fire Protection Evaluation Rept.Caused by Misunderstanding & Misapplication of Detailed Regulatory Requirements.Fire Watch Patrol Established +