ML20237K971
| ML20237K971 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/30/1987 |
| From: | Haltiwanger J, Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | NRC |
| References | |
| NUDOCS 8708200029 | |
| Download: ML20237K971 (5) | |
Text
h a
Director, Office of Resource Management
-June Monthly Operating Report Page 1 i
. ATTACHMENT I AVElAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395-UNIT V.'C. SUMMER'I-DATE 7/02/87 COMPLETED BY
.J.
W. HALTIWANGER, TELEPHONE-(803) 345-5209 JUNE 1987 DAY AVERAGE DAILY POWER LEVEL-DAY: AVERAGE DAILY POWER LEVEL.
(MWe-Net)
(MWe-Net)
]
~
1.
-37
- 17. 2.
-34 18.
414
- 3. 19.
857 4.
-33 20.
881 5.
-34 21.
884 6.
-33 22.
'885 7.
-33 23.
886 8.
-33 24.
882 9.
75 25.
884 10.
233 26.
881 11, 500 27.
881 12.
626 28.
882 13.
644 29.
883 14.
698 30.
882-15.
878 16.
732 b
ff ( 'l 8708200029 870630 DR.ADOCK 0 0 5
5 l4 o
l 6
l l
Director, Office of Resource Management June Monthly Operating Report j
Page 2 ATTACHMENT II OPERATING DATA REPORT l
DOCKET NO.
50/395 I
UNIT V. C. SUMMER I l
DATE 7/02/87 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-5209 l
0PERATING STATUS l
- 1. Reporting Period:
June 1987 l
Gross Hours in Reporting Period:
720 l
- 2. Currently Authorized Power Level (MWt):
2775 i
Max. Depend. Capacity (MWe_ Net):
885 Design Electrical Rating (MWe-Net):
900
- 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE l
- 5. Number of Hours Reactor Critical 536.4 2093.6 22540.1 I
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 491.6 2047.8 22039.0
- 8. Unit Reserve Shutdown Hours 0.0 0.0
. 0.0 i
- 9. Gross Thermal Energy Generated (MWH) 1,193,818 5,342,854 57,737,174 l
- 10. Gross Electrical Energy (MWH) 387,710 1,754,280 19,163,739 l
- 11. Net Electrical Energy Generated (MWH) 362,027 1,646,634 18,229,911
- 12. Reactor Service Factor 74.5 48.2 73.5
- 13. Reactor Availability Factor 74.5 48.2 73.5
- 14. Unit Service Factor 68.3 47.2 71.9
- 15. Unit Availability factor 68.3 47.2 71.9
- 16. Unit Capacity Factor (Using MDC) 56.8 42.8 67.2
- 17. Unit Capacity Factor (Design MWe) 55.9 42.1 66.1
- 18. Unit Forced Outage Rate 4.9 1.2 6.4
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
N/A
- 20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation):
N/A i
Director, Office of Resource Management June Monthly Operating Report Page 3 I
ATTACHMENT III I
UNIT SHUTDOWNS AND POWER REDUCTIONS 1
00CKET N0.
50/395 i
UNIT V. C. SUMMER I l
DATE 7/02/87
]
l
' COMPLETED BY J. W. HALTIWANGER l
TELEPHONE (803) 345-5209 JUNE 1987 1
Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 2
870306 S
203.0 C
4 REFUELING OUTAGE I
l 1
3 870616 c
25.4 A
3 Reactor Trip on Lo Lo Steam Generator Level due to loss of an inverter.
L____--
..,3..........
......................~.
y 4
r a
i Director, Office of Resource Management i
June Monthly Operating Report 1
. Page 4.
I ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET N0.
-50/395 i
UNIT-V.'C. SUMMER I 1
OATE
-7/02/87-.
. COMPLETED BY-
-J.
W. HALTIWANGER:
TELEPHONE.
(803) 345-5209:
JUNE 1987
' On June 1, 1987, V. C. Summer Station was preparing for.startup from-the third _
)
refueling outage.
Initial criticality was achieved on. June 6 at 0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br />.
The generator was placed on line at 1102 on June 9.
l On June.16, 1987, at 2003 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.621415e-4 months <br />, the plant' tripped on Lo lo steam generator level.
I l
due to loss of an inverter.
-)
The plant recovered from the trip and was back on line at 2127 hours0.0246 days <br />0.591 hours <br />0.00352 weeks <br />8.093235e-4 months <br />, June'17..
On June 30, 1987, the plant was operating at approximately 100 percent' power.
l t
'(
t I
l
'I
_ - - _ - =
--..-__.._____u_._-_l-
r,
.pc5 l
g gggna Electric & Gas Comptny n
N.
n umb 29218 Nuclear Operations SCE&G l'
July 14, 1987
> g,g#
-as,
1 i
Director, Office of Resource Management U. S. Nuclear Regulatory Commission MNBB 7602 Washington, DC 20555 j
l 1
ATTH: Mr. Learned W. Barry j
J
SUBJECT:
Virgil.C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 June Monthly Operating Report
]
Dear Mr. Barry:
l i
Please find enclosed the June 1987 Monthly Operating Report for the Virgil C.
l Summer Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
4 If there are any questions, please call me at yo,ur convenience.
er trul
- ours, s
0/ A. \\
l adman j
AMM:JWH:0AN/bjh I
Attachments a
pc:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
K. E. Nodland E. C. Roberts J. C. Snelson O. S. Bradham G. O. Percival J. G. Connelly, Jr.
R. L. Prevatte
- 0. R. Moore
-J.
B. Knotts, Jr.
W. A. Willitms, Jr.
INPO Records Center T. E. Murley ANI Library.
J. Nelson Grace L. N. Carter Group Managers R. E. Rainear W. R. Baehr Marsh & McLennan C. A. Pr. ice RTS R. B. Clary NPCF l
W. R. Higgins File C. L. Ligon (NSRC) d R. M. Campbell, Jr.
h I \\
_ _ = _-