Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 43238 +
- 05000335/LER-2004-004, Re Dual Unit Loss of Offsite Power During Hurricane Jeanne +
- 05000265/LER-2001-002 +
- IR 05000335/2016012 +
- 05000255/LER-1990-009, :on 900516,atmospheric Steam Dump Valves Unexpectedly Opened Resulting in Automatic Auxiliary Feedwater Actuation Signal Initiations.Caused by Electrical Noise.Temporary Mod Installed to Stop Noise +
- ML18057A270 +
- ML20086A635 +
- ML20079C330 +
- ML20134K490 +
- ML20134K152 +
- ML20202G516 +
- ML20214K621 +
- ML20063L246 +
- BECO-92-127, Monthly Operating Rept for Oct 1992 for Pilgrim Nuclear Power Station +
- 2CAN129506, Monthly Operating Rept for Nov 1995 for ANO Unit 2 +
- 05000400/LER-1987-004, :on 870121,reactor Tripped While Power Level Reduced Due to intermediate-range Channel N-36 Remaining in Trip Condition.Caused by Reset Value Set Too Low.Setpoints Adjusted to Values Based on Data Collected +
- 05000412/LER-1996-004-01, :on 960830,bypass Feedwater Regulating Valve Leakage Leads to Manual Reactor Trip During Shutdown for Refueling.Procedures Revised +
- 05000265/LER-1991-003-01, :on 910122,HPCI Turbine Tripped Unexpectedly During Fast Start Portion of HPCI Quarterly Pump Operability Test.Caused by Low Pump Suction Pressure transient.Time-delay Relay Installed +
- 05000382/LER-1989-022, :on 891128,plant Operated in Condition Prohibited by Tech Specs When Emergency Diesel Generator a Inoperable More than 24 H.Caused by Personnel Error.Ltr Issued to All Shift Supervisors +
- 05000272/LER-1981-078-01, /01T-0:on 810903,during Surveillance Test,Svc Water Discovered Leaking from Top Secondary Coil 11 on Containment Fan Coil Unit.Caused by Failure of Secondary Coil.Coil Repaired & Returned to Svc +
- 05000272/LER-1981-078, Forwards LER 81-078/01T-0.Detailed Event Analysis Encl +
- 05000281/LER-1992-010-02, :on 920917,TDAFWA Pump Automatically Started Due to Relay Failure in Station Svc UV Portion of AFW Start Circuit.Failed Agastat Relay Being Analyzed to Determine Cause.Relay Replaced & Satisfactorily Tested +
- 05000272/LER-1990-009-01, :on 900328,main Steamline Isolation Signal Actuated During Performance of Channel I Main Steamline Flow Calibr.Caused by Inadequate Procedure.Main Steamline Flow Detector Calibr Procedure Revised +
- 05000255/LER-1997-004, :on 970221,trip of High Pressure Safety Injection Pump Occurred While Filling Safety Injection Tank Resulting in TS Violation.Caused by Particle Lodged Between Surface of Indication disk.Y-phase Relay Was OOS +
- 05000461/LER-1917-010, Regarding Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram +
- 05000260/LER-1999-001-03, :on 990308,determined That Two Trains of Standby Gas Treatment (SGT) Were Inoperable.Caused by Trip C SGT Blower Motor Breaker.Initiated Shutdown of Plant,Reset C SGT Blower Motor Breaker & Declared Train Operable +
- 05000397/LER-1988-007, :on 880214,rupture of Reactor Bldg Roof Occurred Due to HVAC Overpressurization Transient.Caused by Personnel Error.Equipment Operator Training Program & Investigative Process Being Developed +
- 05000461/LER-2013-008, Regarding Failure of Division I Transformer Leads to Isolation of Instrument Air Supply to Containment, Lowering Scram Pilot Air Header Pressure, and Manual Reactor Scram +
- ML062710041 +
- 05000220/LER-2004-004, Regarding Manual Reactor Scram Due to Failure of 13 Feedwater Flow Control Valve Positioner +
- 05000352/LER-1988-026, :on 880717,control Room HVAC Isolation Resulted from High Chlorine Concentration Signal Caused by Rain Water Contacting Analyzer Probe.Proper Control Room Isolation Verified & Control Room Ventilation Restored +