Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099F131 +
- ML20090J053 +
- ML20141A483 +
- ML20206L846 +
- 05000029/LER-1986-005, Forwards LER 86-005-00 Re Primary Coolant Dose Equivalent I-131 Greater than 1 Mci Per G +
- ML20202H639 +
- ML20215C012 +
- 05000382/LER-1989-010, :on 890520,determined That Low Recirculation Flow Not Included in Pump Operability Which Resulted in Noncompliance W/Tech Spec 4.0.5.Caused by Miscommunication. Procedures Revised +
- 05000382/LER-1986-009, :on 860509,while Operating at 100% Power, Uncomplicated Reactor Trip Occurred.Caused by Failure of Reed Switch on Control Element Assembly 35.Faulty Switch Replaced & Assembly Calculator Returned to Svc +
- 05000339/LER-1988-004-02, :on 880520,emergency Diesel Generator 2H Determined Inoperable While Emergency Diesel Generator 2J Svc for Preplanned Maint.Caused by Breaker 25H2 Failed to Closing Springs Not Being Charged +
- 05000373/LER-1986-012-03, :on 860402,ESF Actuation of Control Room HVAC Emergency Makeup Train a Started by Spurious Trip of High Radiation Monitor.Caused by Lack of Source Calibr of Monitor.Monitor Calibr & Procedure Revised +
- 05000395/LER-1988-010-08, :on 880830,failure to Perform Fire Watch Following Fire Sys Computer Malfunction Induced by Lightning Striking Meteorological Tower.Caused by Inadequate Training & Procedural Guidance.Event Reviewed +
- 05000339/LER-1988-004, :on 880520,determined That Emergency Diesel Generator 2H Had Been Inoperable While Emergency Diesel Generator 2J Was Out of Svc for Preplanned Maint.Caused by Failure of Breaker.Maint Procedure Revised +
- 05000267/LER-1986-010, :on 860127,automatic Loop II Shutdown Initiated by Plant Protective Sys,Resulting from Helium Circulator D Trip.Trip Caused by Failure to Maintain Proper Level in Loop II Bearing Water Surge Tank (T-2105) +
- 05000315/LER-1984-010-01, :on 840617,reactor Trip & Safety Injection Occurred from Loss of Control Room Instrument Distribution Inverter Iv.Caused by Shorted C-2 Capacitor.Capacitor Replaced W/Higher Temp Rated Capacitors +
- 05000368/LER-1989-023-01, :on 891117,approach to Criticality Commenced After Seventh Refueling Outage W/Logarithmic Power Level Channels Inoperable.Caused by Electrical Noise in Circuitry. Defective Preamplifier Replaced +
- 05000368/LER-1989-023, :on 891117,noted That Channel a Not Responding to Change in Power Level & Declared Inoperable.Caused by Defective Preamplifier.Evaluation of Sys Design & Channel Functional Test Initiated +
- 05000281/LER-1992-010-02, :on 920917,TDAFWA Pump Automatically Started Due to Relay Failure in Station Svc UV Portion of AFW Start Circuit.Failed Agastat Relay Being Analyzed to Determine Cause.Relay Replaced & Satisfactorily Tested +
- 05000272/LER-1994-003, :on 940127,reactor Trip Occurred on SG 14 Low Low Level.Caused by Equipment Failure of Circuit Cards in 14BF19/40 Controller.Circuit Cards Replaced & Controller Returned to Svc +
- 05000249/LER-1988-002-01, :on 880113,emergency Diesel Generator Automatically Started W/No Initiation Conditions Indicated in Control Room.Caused by Mgt Deficiency Re Work Activity on Inservice Equipment.Station Policy Issued +
- 05000334/LER-2002-002, Regarding Manual Reactor Trip During Planned Shutdown Due to Turbine Motoring Alarm +
- ML20212E744 +
- 05000029/LER-1986-004, Forwards LER 86-004-00 Re Reactor Scram Due to Loss of Heater Drain Pumps During Severe Lightning Storm +