- ML13206A006 +
- ML13161A265 +
- ML13105A018 +
- ML18121A153 +
- BSEP 13-0045, Request for Notice of Enforcement Discretion (NOED) Technical Specification 3.7.3, Control Room Emergency Ventilation (Crev) System, Technical Specification 3.8.1, Technical Specification 3.8.4 and Technical Specification 3.8.7 +
- RIS 2008-08, Voluntary Submission of Performance Indicator Data +
- ML20027B481 +
- ML20053C217 +
- ML040550381 +
- ML032650565 +
- ML032591121 +
- ML022960444 +
- ML031110294 +
- ML20097B492 +
- ML20097A455 +
- ML20095D661 +
- IR 05000289/1985012 +
- ML20199E357 +
- ML20199D031 +
- ML20203K471 +
- ML20245L259 +
- ML20217C107 +
- IR 05000423/1986028 +
- RA-97-0258, LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review +
- BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station +
- ST-HL-AE-3960, Special Rept:On 911212,standby Diesel Generator 11 Nonvalid Failure Occurred Due to High Resistance of Relay Contacts within Instantaneous Preposition Board.Instantaneos Preposition Board Replaced & Similar Relays to Be Inspected +
- ML23089A402 +
- 05000293/LER-1999-010-02, :on 990918,reactor Startup Was in Progress. Caused by Communications Breakdown That Resulted in Operations Personnel Failing to Complete Actions in IAW Procedures.Power Ascension Was Secured.With +
- 05000339/LER-1986-008-01, :on 860411,reactor Trip Occurred Due to Turbine Trip.Caused by Actuation of Generator Differential Lockout Relay.Exciter Bearing & Permanent Magnet Generator Replaced +
- ML20199J306 +
- 05000265/LER-1987-018-06, :on 871104,HPCI Sys Auto Isolation Due to High Temp in HPCI Room.Caused by Design Deficiency in HPCI Room Temp Monitoring Sys.Sys Evaluated & Mod 4-1(2)-84-21 Proposed +
- 05000320/LER-1986-004, :on 860224,number of Transfers of Expended Filter Media to Holding Drum Exceeded Limit in Ser.Caused by Failure to Incorporate SER Transfer Limits Into Procedure. Procedure Revised +
- 05000254/LER-1986-004, :on 860119,reactor Scram Occurred Due to Atws/Alternate Rod Insertion Sys Initiation.Caused by Deficiency in Procedure Used to Drain Vessel.Procedure Revised +
- 05000414/LER-1988-025, :on 880626,automatic Reactor Trip Occurred Due to Lo Lo Steam Generator Level.Caused by Personnel Error. Existing Communication Methods Will Be Evaluated & Improved +
- 05000413/LER-1985-041, :on 850613,main Feedwater Pump Trip Resulted in Manual Reactor Trip.Caused by Pump Recirculation Valve Not Capable of Modulating Quickly During Flow Reduction.Design Deficiency Corrected +
- 05000333/LER-1992-046, :on 921017,primary Containment Shutdown for Cooling Suction Isolation Valve Automatically Closed Due to Procedure Deficiency.Plant Procedures Will Be Revised to Reflect Changes to 10CFR50.72 & 10CFR50.73 +
- 05000219/LER-1984-025, :on 841029,core Spray Sys I Inadvertently Initiated & Injected Torus Water Into Vessel.Caused by Personnel Error.Personnel Debriefed & Instructed on Lessons Learned from Occurrence +
- 05000265/LER-1995-006-07, :on 951004,feed Breaker for Motor Control Ctr at Switchgear Tripped from Current Overlaod.Caused by Trip Setting Too Low for Given Plant.Motor Control Ctr Restored & Exit LCO +
- 05000269/LER-1984-002-03, :on 840512,reactor Trip Initiated by Reactor Protection Sys When High RCS Pressure Setpoint Reached. Caused by Key Selector Switch & Reactor Coolant Outlet Temp Relay Failure.Relay Replaced +
- 05000254/LER-1992-004-03, :on 920207,Unit 1 Reactor Scram Occurred Due to Group I Isolation.Caused by Spurious Main Steam Line High Flow Trip Due to Unknown Cause.Applicable Instruments Calibr & Functionally Verified +
- BVY-93-071, Monthly Operating Rept for June 1993 for Vermont Yankee Nuclear Power Station +
- BVY-93-048, Monthly Operating Rept for Apr 1993 for Vermont Yankee Nuclear Power Station +
- 05000413/LER-1990-013-01, :on 900611,approx 5,000 Gallons of RCS Water Inadvertently Transferred to Refueling Water Storage Tank. Caused by Inappropriate Action.Proper Sys Parameters Restored & Analysis of Event Performed +
- IR 05000219/1990007 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- IR 05000142/1979004 +
- 05000272/LER-1991-006, :on 910216,20 & 27,containment Purge/Pressure Vacuum Relief Sys Isolation Occurred & Actuation Signals Initiated by Radiation Monitor Channel.Caused by Inadequate Administrative Controls.Channel Reset +
- ML13308C153 +
- 05000280/LER-2011-001, Regarding Reactor Trip on Both Units Due to Loss of Offsite Power +
- 05000315/LER-2003-003, From Cook, Unit 1 Regarding Dual Unit Manual Trip Due to Failure of Intake Traveling Screens & Failure to Comply with TS 3.8.1.1 +