MONTHLY OPERATING REPORT DOCKET No.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE August 3. 1984 COMPLsru BY

n. r. Heinlein TELEPHONE (11aT 676-R?ng PART A OPERATIONS

SUMMARY

July, 1984 Callaway Unit 1 entered Mode 5 on 6/28/84 at 0203 hours0.00235 days <br />0.0564 hours <br />3.356481e-4 weeks <br />7.72415e-5 months <br /> and began preparations durine the month of July for entry into Mode 4.

Static fill and vent was completed on 7/5/84 and 7/6/84, respectively, with dynamic fill and vent being completed on 7/8/84 and 7/10/84, respectively. An oil leakage problem from the f

lower motor bearing on the "A" train of the RHR pump required the installation a

of new lower motor bearings and modified end caps.

The "A" train RHR pump was inonerable from 7/11/84 until onerability was declared on 7/17/84.

In addition, rho "C" RCP reaufred seal renlacompne which beenn on 7/18/R4 nnd was comnlet_d with the numn declared onernble on 7/30/R4.

PART B PORV AND SAFETY VALVE

SUMMARY

~

On 7/16/84 PORV BB-PCV-455 lifted.

A' loss of instrument air caused the RCS letdown flow to secure and chargine flow to maximize with a solid Reactor Coolant Rvstem (RCR).

The cold overnressure protection system onerated at a RCS nressure of 450 psig by relieving pressure through BB-PCV-455.

On 7/18/84 PORV's BB-PCV-455 and BB-PCV-456 lifted. When starting the "B" Reactor Coolant Pump the RCS pressure sufficiently increased to lift BB-PCV-455 and BB-PCV-456.

The temperature of the RCS at the time of the event was less than the temperature of the Steam Generator but within Technical Specification limits.

t f

CA-#804 05/09/84 QDP-ZZ-04204 g [f 8409130275 840731 Page 1 of 4 PDR ADOCK 05000483 f

R PDR

~

Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-483 UNIT Callaway DATE Aunust 1. 1984 COMPLETED BY K. R. Bryant TELEPHONE (314) 676-8292 MONTH JULY 1984 o

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE D AILY POWER LEVEL (MWe Net)

(MWe Net) 0 0

1 37 0

0 2

3, i

3 19 0

0 4

20 0

',~

0-0 5

21

=

~

0 0

S 7

23 0

0 s

0 24 0

0 9

3 10 26 11 0

27 0

0 0

12 3

0 13 29

{

14 O

g n

0 15 33 0

16 0

i 0 [0 84 l

Page 2 of 4 QDP-ZZ-04204

.,,--.---,-e_

,___m

-w-.-,

y.

y

--.,,e, r

.p.-.=

r.,

vg-wr

,---y y.--wmg,.yw.,.,

,,g---w

+--,,-s.wy.--k

f

!~

Part D OPERATING DATA REPORT 50-483 DOCKET NO.

4 UNIT -

Callaway August 10. 1984 DATE COMPT.ETED BY K. R. Bryant a

TELEPHONE (314) 676-8292 1

l OPERATING STATUS July 1984 GROsE HOURS IN REPORTING PERIOo:

744

1. REPORTING PEmOD:

3411 max. DEPEND. CAPACITY (MWe Nott:

O e

i.

2. CURRENTLY AUTHORIZED FOWER LEVEL (MWil:

CIslGN ELECTRICAL RATING (MWo. Net):

11 %

0

3. POWER LEVEL TO WHICH RESTRICTED flF ANY) (Millie Neti:
4. REASONS FOR RESTRICTION (IP ANYh Required to meet commitments listed in Operating License THIS MONTH YR TO DATE CUHULATIVE l

NPF-25 before exceeding 5% Thermal Power t

i

5. NUMeER OF MOURS REACTOR WAS CRITICAL 0

0 0

0 0

0

6. REACTOR RESERVE SMUTDOWN MOURS 0

0 0

7. MOURS GENERATOR ON LINE 0

0 0

i

8. UNIT RESERVE SMUTDOWN MOURS i

0 0

0

9. GROSS THERMAL ENERGY GENERATED (MWM) 0 0

0

10. GROSS ELECTRICAL ENERGY GENERATED IMWM).

I 0

0 n

11. NET ELECT **1 CAL ENERGY GENERATED (MWM)

N/A N/A v/A

12. REACTOR S89VICE FACTOR N/A N/A N/A
13. REACTOR AVAILAalLITY F ACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAll \\elLITY FACTOR N/A N/A N/A 1s. UNIT CAPACITY FACTOR tumng MDC)

N/A N/A N/A

17. UNIT CAPACITY FACTOR (Umng Design MWs)

N/A N/A N/A

18. UNIT FORCED OUTAGE RATE.

Jf

19. SMUTDOWNS SCHEDULED OVER NExT 4 MONTHS ITYPE DATE. ANO DURATION OP EACMl:

'i 8/31/84

20. OF SMUT DOWN AT END OP REPORT PERIOD. ESTIMATED DATE OF STARTUP:

l

21. UNITS IN TEST 3TATUS (PRIOR TO CC.MMERCIAL OPERATION):

FORECAST ACHIEVED 8/31/84 INITIAL C9111CAuTy 9/14/84 INITIAL ELECTRICITY COMMERCIAL OPEfu.710le

~

4

  • Forecast completion of ascension testing 11/12/84.

84 Page 3 of 4 QDP-ZZ-04204 e

e er g..e a+-

y e.

w

,e+

~w.-,n

-,,a--

,=,=~.:,,,,,,,-.~n a

n r

I

. ~.,.

i 4'

Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE August 3, 198'.,

4 -

D. E. Heinlein COMPLETED BY TELEPflONE (314) 676-8208 REPORT MONTil 3tiLY 1984 t

1 METHOD OF a

TYPE SHUTTING DOWN F: FORCED QURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS l REASON REDUCING POWER CORRECTIVE ACTIONSM:OMMENTS i

5 l

1 i

i i

4 i

1 1

i'

SUMMARY

No unit shutdowns or power reductions as the plant is,in its initial startup and in Mode 5, 1

ascending for the first time.

i 4

1 i

CA-f804 05/09/84 Page 4 of 4 QDP-ZZ-04204 1

y

g

~7

1;fe,';[

e[i

~

ne-s;

-+ R.tw m a

NION.EL.EcTaic COMPANY.

.g(

~

CALLAWAY PLANT S

MAILING ADD,tESS

  • August 10,1984

.o..Ox

..O FULTON, MO. 85 81 j-

+

Director, Resource Management U. S. Nuclear Regulatory Commission Washington, ~ DC 20555 ULNRC-898 DOCKET NUMBER 50-483 CALLAWAY-PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-,

MONTHLY OPERATING REPORT i=

i

-JULY 1984-14

Dear Sir:

4 The enclosed Monthly Operating Report for July 1984 is submitted.

pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

4 1

E/4uthb~A S. E. Miltenberger i

R AerS i.-

SEM/ MET /WHS/RRG/drs Enclosure

]_

cc w/ encl:

James G. Keppler NRC Resident Inspector USNRC Region III Office Missouri Public Service Commission 799 Roosevelt. Road D. F. Schnell Glen'Ellyn, IL 60137 j -

J. E. Davis (Z40MOR)

R.' L. Powers Director D. W. Capone Office of Inspection & Enforcement A.C.Passwater/D.E.Shafer/D.J. Walker U.S. Nuclear Regulatory Commission G. A. Hughes Washington, DC 20555 -

W. R. Robinsoni(QA Record)

P.-T. Appleby American Nuclear Insurers Library SEM Chron T[d '

c/o'Dottie Sherman 3456-0021.6 t

The Exchange Suite 245 Z40ULNRC l

i 270 Farmington Avenue G56.37 Farmington, CT 06032.-

N. Date

/I

. - -