MONTHLY OPERATING REPORT DOCKET No.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE August 3. 1984 COMPLsru BY
- n. r. Heinlein TELEPHONE (11aT 676-R?ng PART A OPERATIONS
SUMMARY
July, 1984 Callaway Unit 1 entered Mode 5 on 6/28/84 at 0203 hours0.00235 days <br />0.0564 hours <br />3.356481e-4 weeks <br />7.72415e-5 months <br /> and began preparations durine the month of July for entry into Mode 4.
Static fill and vent was completed on 7/5/84 and 7/6/84, respectively, with dynamic fill and vent being completed on 7/8/84 and 7/10/84, respectively. An oil leakage problem from the f
lower motor bearing on the "A" train of the RHR pump required the installation a
of new lower motor bearings and modified end caps.
The "A" train RHR pump was inonerable from 7/11/84 until onerability was declared on 7/17/84.
In addition, rho "C" RCP reaufred seal renlacompne which beenn on 7/18/R4 nnd was comnlet_d with the numn declared onernble on 7/30/R4.
PART B PORV AND SAFETY VALVE
SUMMARY
~
On 7/16/84 PORV BB-PCV-455 lifted.
A' loss of instrument air caused the RCS letdown flow to secure and chargine flow to maximize with a solid Reactor Coolant Rvstem (RCR).
The cold overnressure protection system onerated at a RCS nressure of 450 psig by relieving pressure through BB-PCV-455.
On 7/18/84 PORV's BB-PCV-455 and BB-PCV-456 lifted. When starting the "B" Reactor Coolant Pump the RCS pressure sufficiently increased to lift BB-PCV-455 and BB-PCV-456.
The temperature of the RCS at the time of the event was less than the temperature of the Steam Generator but within Technical Specification limits.
t f
CA-#804 05/09/84 QDP-ZZ-04204 g [f 8409130275 840731 Page 1 of 4 PDR ADOCK 05000483 f
R PDR
~
Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE Aunust 1. 1984 COMPLETED BY K. R. Bryant TELEPHONE (314) 676-8292 MONTH JULY 1984 o
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE D AILY POWER LEVEL (MWe Net)
(MWe Net) 0 0
1 37 0
0 2
3, i
3 19 0
0 4
20 0
',~
0-0 5
21
=
~
0 0
S 7
23 0
0 s
0 24 0
0 9
3 10 26 11 0
27 0
0 0
12 3
0 13 29
{
14 O
g n
0 15 33 0
16 0
i 0 [0 84 l
Page 2 of 4 QDP-ZZ-04204
.,,--.---,-e_
,___m
-w-.-,
y.
y
--.,,e, r
.p.-.=
r.,
vg-wr
,---y y.--wmg,.yw.,.,
,,g---w
+--,,-s.wy.--k
f
!~
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
4 UNIT -
Callaway August 10. 1984 DATE COMPT.ETED BY K. R. Bryant a
TELEPHONE (314) 676-8292 1
l OPERATING STATUS July 1984 GROsE HOURS IN REPORTING PERIOo:
744
- 1. REPORTING PEmOD:
3411 max. DEPEND. CAPACITY (MWe Nott:
O e
i.
- 2. CURRENTLY AUTHORIZED FOWER LEVEL (MWil:
CIslGN ELECTRICAL RATING (MWo. Net):
11 %
0
- 3. POWER LEVEL TO WHICH RESTRICTED flF ANY) (Millie Neti:
- 4. REASONS FOR RESTRICTION (IP ANYh Required to meet commitments listed in Operating License THIS MONTH YR TO DATE CUHULATIVE l
NPF-25 before exceeding 5% Thermal Power t
i
- 5. NUMeER OF MOURS REACTOR WAS CRITICAL 0
0 0
0 0
0
- 6. REACTOR RESERVE SMUTDOWN MOURS 0
0 0
- 7. MOURS GENERATOR ON LINE 0
0 0
i
- 8. UNIT RESERVE SMUTDOWN MOURS i
0 0
0
- 9. GROSS THERMAL ENERGY GENERATED (MWM) 0 0
0
- 10. GROSS ELECTRICAL ENERGY GENERATED IMWM).
I 0
0 n
- 11. NET ELECT **1 CAL ENERGY GENERATED (MWM)
N/A N/A v/A
- 12. REACTOR S89VICE FACTOR N/A N/A N/A
- 13. REACTOR AVAILAalLITY F ACTOR N/A N/A N/A
- 14. UNIT SERVICE FACTOR N/A N/A N/A
- 15. UNIT AVAll \\elLITY FACTOR N/A N/A N/A 1s. UNIT CAPACITY FACTOR tumng MDC)
N/A N/A N/A
- 17. UNIT CAPACITY FACTOR (Umng Design MWs)
N/A N/A N/A
- 18. UNIT FORCED OUTAGE RATE.
Jf
- 19. SMUTDOWNS SCHEDULED OVER NExT 4 MONTHS ITYPE DATE. ANO DURATION OP EACMl:
'i 8/31/84
- 20. OF SMUT DOWN AT END OP REPORT PERIOD. ESTIMATED DATE OF STARTUP:
l
- 21. UNITS IN TEST 3TATUS (PRIOR TO CC.MMERCIAL OPERATION):
FORECAST ACHIEVED 8/31/84 INITIAL C9111CAuTy 9/14/84 INITIAL ELECTRICITY COMMERCIAL OPEfu.710le
~
4
- Forecast completion of ascension testing 11/12/84.
84 Page 3 of 4 QDP-ZZ-04204 e
e er g..e a+-
y e.
w
,e+
~w.-,n
-,,a--
,=,=~.:,,,,,,,-.~n a
n r
I
. ~.,.
i 4'
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE August 3, 198'.,
4 -
D. E. Heinlein COMPLETED BY TELEPflONE (314) 676-8208 REPORT MONTil 3tiLY 1984 t
1 METHOD OF a
TYPE SHUTTING DOWN F: FORCED QURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURS l REASON REDUCING POWER CORRECTIVE ACTIONSM:OMMENTS i
5 l
1 i
i i
4 i
1 1
i'
SUMMARY
- No unit shutdowns or power reductions as the plant is,in its initial startup and in Mode 5, 1
ascending for the first time.
i 4
1 i
CA-f804 05/09/84 Page 4 of 4 QDP-ZZ-04204 1
y
g
~7
- 1;fe,';[
e[i
~
ne-s;
-+ R.tw m a
NION.EL.EcTaic COMPANY.
.g(
~
CALLAWAY PLANT S
MAILING ADD,tESS
- August 10,1984
.o..Ox
..O FULTON, MO. 85 81 j-
+
Director, Resource Management U. S. Nuclear Regulatory Commission Washington, ~ DC 20555 ULNRC-898 DOCKET NUMBER 50-483 CALLAWAY-PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-,
MONTHLY OPERATING REPORT i=
i
-JULY 1984-14
Dear Sir:
4 The enclosed Monthly Operating Report for July 1984 is submitted.
pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
4 1
E/4uthb~A S. E. Miltenberger i
R AerS i.-
SEM/ MET /WHS/RRG/drs Enclosure
]_
cc w/ encl:
James G. Keppler NRC Resident Inspector USNRC Region III Office Missouri Public Service Commission 799 Roosevelt. Road D. F. Schnell Glen'Ellyn, IL 60137 j -
J. E. Davis (Z40MOR)
R.' L. Powers Director D. W. Capone Office of Inspection & Enforcement A.C.Passwater/D.E.Shafer/D.J. Walker U.S. Nuclear Regulatory Commission G. A. Hughes Washington, DC 20555 -
W. R. Robinsoni(QA Record)
P.-T. Appleby American Nuclear Insurers Library SEM Chron T[d '
c/o'Dottie Sherman 3456-0021.6 t
The Exchange Suite 245 Z40ULNRC l
i 270 Farmington Avenue G56.37 Farmington, CT 06032.-
N. Date
/I
. - -