Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 46094 +
- ML032661080 +
- PLA-7859, Annual Radiological Environmental Operating Report - PLA-7859 +
- ML20238D935 +
- 0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With +
- U-602421, Ro:On 950216,Div 2 125 Volt Dc Electrical Power Sys Declared Inoperable.Caused by Failure of Silicon Controlled Rectifier Firing Board in Div 2 Battery Charger.Battery Charger Repaired +
- 05000333/LER-1987-018, :on 871108,reactor Tripped from High Neutron Flux Due to Erratic Operation of Reactor Water Recirculation Pump Speed Controller.Caused by Malfunction in Pump Speed Controller Switch.Controller Replaced +
- 05000277/LER-1988-020-01, :on 880729,capacitors Which Connect 500 Kv Bus Tie to Phase a Potential Transformer Failed,Resulting in Fire in North Substation & Voltage Disturbance Resulting in ESF Actuations.Caused by Capacitor Failure +
- 05000352/LER-1992-004-01, :on 920321,reactor Encl Supply Fans Failed to Trip,Resulting in High Reactor Encl Differential Pressure. Caused by Overpressurization Transient Causing Blowout Panel to Open.Mod to Setpoint Implemented +
- 05000395/LER-1983-144-03, /03L-0:on 831223,during Normal Operation,Erratic Behavior from Power Range Nuclear Instrument NI-42 Necessitated Quadrant Power Tilt Ratio Measurement.Cause Unknown.Bistables Placed in Trip +
- 05000352/LER-1994-008, :on 940530,reactor Recirculation Pump Seal Purge Block Valve Automatically Closed Due to Personnel Error.All Hands Meeting Was Conducted Which Discussed Event & re-emphasized to I&C Technicians +
- 05000293/LER-1993-014, :on 930531,automatic Scram Occurred,Resulting from Operation of Auxiliary Transformer Differential Relay During Power Ascension.Uat Phase B & C Differential Relays Left Interchanged as Investigative Aid +
- 05000461/LER-1990-008, :on 900408,attempt Made for 14 Control Rod Withdrawals While Main Turbine Bypass Valves Were Open & Reactor Power Was Greater than Low Power Setpoint.Caused by Personnel Error.Reactor Shut Down +
- 05000369/LER-1981-059, Forwards LER 81-059/03L-0.Detailed Event Analysis Encl +
- ML20042B340 +
- ML19317F906 +
- 05000255/LER-2011-006, Regarding Valve Packing Failure Resulted in Reactor Trip and Auxiliary Feedwater System Actuation +
- 05000338/LER-2010-002, Regarding Forced Shutdown Due to Un-isolable C Steam Generator Surface Sample Line Leakage +
- 05000325/LER-1993-008, :on 930313,severe Winter Storm Resulted in Spurious ESF Actuations & Loss of Offsite Power.Failed Cellon-treated Douglas Fir Poles Compromising Structure 10 Replaced W/Steel Poles +