NARRATIVE SUMfMRY OF MONTHLY OPERATING EXPERIENCE

~

UNIT 1 NOVEMBER, 1987 9

November 1 The Unit was ope ra ting at a reduced power level of through approximately 80 percent as condenser tube cleaning in November 2 the main condenser continued. Maintenance work was completed and power ascension to 100 percent was

(

initiated at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> on the 2nd.

November 3 The Unit was in Operational Mode 1 with reactor power at through a nominal 100 percent and the Reactor Coolant System at Oc to ber 31 a normal operating pressure and temperature.

November 13 The Unit was in Operational Mode I with a power through coas tdown in progress prior to the beginning of the November 30 Sixth Refueling Outage.

The Reactor Coolant System was at a normal operating pressure and temperature.

8801040538 871130 PDR ADOCK 05000334

~

R mp

$f_

OPERATING DATA REPORT DOCKET NO.:

50-334 REPORT DATE:

12/09/87 COMPLETED BY: P.A. SMITH TELEPHONE:

(412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: NOVEMBER 1987
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 8016.0 101544.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

720.0 7077.7 58922.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 7061.3 57392.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1762196.0 17923148.0 136447554.5

17. GROSS ELECT. ENERGY GEN. (MWH):

578980.0 5838960.0 43712190.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

543470.0 5481.730.0 40786533.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 88.1 59.0
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 88.1 59.0
21. UNIT CAPACITY FACTOR (MDC): PCT 93.2 84.4 53.0
22. UNIT CAPACITY FACTOR (DER): PCT 90.4 81.9 51.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.6 19.8
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):

SIXTH REFUELING. DECEMBER 11.1987. DURATION - 65 DAYS

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A

,_,,,,N 4 COMMERCIAL OPERATION N/A N/A 2-

Sv! RACE DAALY UNIT ?oWER LIVEL

.. g.,

e

.q 1

~

occxg7 3o, M-324 LNIT I*7 5 ~ ~ ~ :

$r DATE December 11. 1%

COMPLITED BY P.A. Seith TELEPHONE

(.12 ) si 3-1825.l MONTH November DAY' AVERACE DALLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

!MWM*t)

(MWeWes t 667 37 758 2

675 gg 754

796 754 3

g, 4

800 733 20 3

800 21 742 6

013 733 g

7 808 725

,3 3

813 717 74 9

804 708 23 10 808 703 3

ll 813 p

704 12 800 688 gg 13 800

9 692 14 792 683 g

13 783 39 16 779 INSTRUCTIONS On this format.!sst the average d:ity unit pi.w.tr inset in MWe Net far esch day in the recueting rix.n h. c..,nnute 'u

)

the nearest whole mepwait.

l 158 t?? )

1 '-

i S

{!jI il j!

1,!.

\\!!l l

1l l

i j

l J

~

~ -

7 n

8 9

1 5

2 8

g 1

i yn 1

1 G

l i i

h t

t 3

en d sd l

t a nan u

i r

i 4

n e e 6 ae s ~

aw2 t

aml d N

4 U bm V 1

i cedt e

)

t x uenh e, t 1

S e 2

e aoent et s

P c

sd e

A.

v e

1 aI rbi ec

=

0 V e 4

I c

.s e c. N u.

h putl rn 5

B D P

(

t n

6 p

)

t pt npeo es a

c e

na omp

e. I e

e r

s i

o rco s

e.

..l

=

O.EEyE r or s.

mf e c0 r a =. s e

r t u N MTBN e

os r 0 u l

s e.

b o

c A Al O e

nes1 o

.e e

C e

N Dl H nR hl es a h

Gc.c g i

a E

E e

I t ed nwo K i T P o

9 i

E E

&i vne t 0 w*5R e g ee CN L

t t L

d eodk 2

l *- s l

b e

e7e oI O U P E el cnrn7 h

e c n c e.

h e

D M

e,A e ooo1

i. mnsl I

r s ~

ers cwi i

O s

v 1 8II t I

t ea st C

u e

nw nena a

r C

P eat i ce 4

5 pnancd t

emas e id c nat ner ee a

U ceht rl h

upt net t

n ed wi o

i h e0 naon e

D Tr8iMpi e

S w

N

~

o 3

t 9

H w

1 C

e E

S X

Pr r

E e

M e

"$5 ag T

ee IE b

H re R

m

. cr e

eSF r

R v

e u eed..

E o

4 st e 8

W N

I =g C

t i

n i

H t l eag O

e e.t

a cr P

d wet. e D

M euoah nt n h

t N

I t eeACgO s :

A N

o - -

o 5

O e

sg 23459 N

M et 3

s nt A

W T

ne r

/

O R

e v o N

O O

cE p em T

F i

e e

U E

L R

is H

R s

ee 5

wn l

muo" E" goo e

i e

s NU e 3 U E.e I

t 4

n e

I.

u0 3sj s

es a

se i

c e

r l

i p

u n'e' i s

s i

c.Im t e l

B n

eA I

e e eT k.g u

e w

e eae I.

d e.

s a

n e

T Nlae s

vI e

m [$5 o o t f.

e s

)t s s g

0 ne

m. l i

e cO, % $a estw ne e e e s nnae s

ehat ne i

er4 ed a s e ue c

m. i eeef pr we s

s n.l c i s la e e eJ ih e

",Re afMRND A '. l a

l e

e I

S D

RABrIl f t I 2

e 1

t 0

a 1

D 1

7 l i 8

e 8

d =

e. de a b.

I5

)

o 7

N 9

I5 7

1

/e 1

r

.i l}

l j{,

rlL

OPERATING DATA REPORT DOCKET NO.:

50 412 REPORT DATE:

12/09/87 COMPLETED BY: M.A. WINGER' 9

TELEPHONE:

(412) 643-1825 l

l OPERATING STATUS i

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: NOVEMBER 1987
3. LICENSED THERMAL POWER (MWt):

2660 4 NAMEPIATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MWe):

833

8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL,*TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

327.0 327.0 327.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

221.5 221.5 221.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

205.8 205.B 205.8

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

517531.0 517531.0 517531.0

17. GROSS ELECT. ENERGY GEN. (MWH):

168900.0 168900.0 168900.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

157077.0 157077.0 157077.0

19. UNIT SERVICE FACTOR: (PERCENT) 62.9 62.9 62 9
20. UNIT AVAILABILITY FACTOR:(PERCENT) 62.9 62.9 62 9
21. UNIT CAPACITY FACTOR (MDC): PCT 57.7 57.7 57 7
22. UNIT CAPACITY FACTOR (DER): PCT

$7.5 57.5 57 5

23. UNIT FORCED OUTAGE RATE: (PERCENT) 37.1 37.1 37 1 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

N/A

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A

.08/04/87 INITIAL ELECTRICITY N/A 08/17/87 COMMERCIAL OPERATION 11/87 11/17/87 1

AVERAGE 34iLY L'.N!T ?CwER ' jet, 00CX.ET NO. _10-412 UNIT BVPS Unit 2 h

DATE _ December 11'. 19)

COMPLITED SY M*A Winger ITLIPHONE (412) 643-1825 MONT16 November DAY AYERAGE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LIVEL IMWe Net 1 i yw,.3,g 3

0 466 g7 O

0 gg 3

0 3,

0' 4

0 20 0

g.

0 g

o

~

6 0~

-115 3

7 0

675 3

g 0

785 4

9 0

810 3

10 0

g 810 11 0
7 816 12 77A*
g 822 13 796*

822

9 I4 816*

818 30 15 808*

3, 16 820*

  • Pre-Commercial Operation Generation INSTRUCTIONS On this Turmas.!ar the acnre dalv unit nwer 23 ei.n uwe.Nei far ese.g gay.n the reou,iing muarh. C...nnuie.o the nearess whuk rnepwait, tu tTT \\ - _ - _ - - - _ _ _ _ _ _ - _ _ _ - _ _ _ - - - _ - _ _ _ _ _. _ _ _ _

l,-

b NARRATIVE SUMt1ARY OF

  • ~

MONTHLY OPERATING EXPERIENCE s

UNIT 11 NOVEMBER, 1987 l

$r November 1 The Uni t was shutdown to-repair leaking ma ni fold through isolation valves on the Reactor Coolant System.

l November 9 November 10 At 1934 hours0.0224 days <br />0.537 hours <br />0.0032 weeks <br />7.35887e-4 months <br /> on the

10th, the reactor was taken through-c ri tical.

At 2227 hours0.0258 days <br />0.619 hours <br />0.00368 weeks <br />8.473735e-4 months <br /> on the 10th, the reactor November 11 tripped, on Lo-Lo Steam Generator Level in the "C" Steam i

Gene ra tor, after the running main feed pump tripped due to low condensate pressure.

November 12 The reactor was taken critical at 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> on the 12th through and power was escalated to a nominal value of 100% to November 16 demonstrate commercial availability.

1 November 17 Commerci al operation was declared at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on the through 17th.

At 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br /> on the 17th, the turbine tripped November 20 from 100% power due to an inadvertent thrust bear 4eg trip signal.

For approximately 5 minutes following the trip, of fsite power was lost when all four (4) KV buses tra ns ferred to offsite power then recl osed on-the de-energized onsite buses.

The Unit remained shutdown until the 21st.

November 21 At 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> on the 21st, the reactor was taken through c ri tical.

At 1513 hours0.0175 days <br />0.42 hours <br />0.0025 weeks <br />5.756965e-4 months <br /> on the 22nd, the Unit was November 24 synchronized to the grid and power was escalated to a nominal value of 85% while the "B" feedwater pump was removed from service for maintenance.

The Unit remained at a nominal value of 85% until 0605 hours0.007 days <br />0.168 hours <br />0.001 weeks <br />2.302025e-4 months <br /> on the 24th when the "B" feed pump was placed in service.

Power was then escalated to a nominal value of 100%.

November 25 The Unit operated at a nominal value of 100% output.

through November 30 l

2 e

e t

o t

a 8

v i

l f

21 r1 nm ap r

l 1 e -

a U a n

i d i

t g3 V

e o

r r e a

t ir n4 a

r et e et i p

hei6 m

hShd w

n e

2 tbW i

1 a e t

t e oga r

4Sem.)2 e

pt o

p pnp s

=

v e

e s t L rp i

0VeP c A. 4 m

o 1

i c

r y r - ei 7 r o t

i)s1 t

n S

aot r 0 ac 5EDM(

e c

e o

t Lf t 0 ec 7

m e

r t t s

a 1 b a 5

ee.

s O EEYE r o r n

n en p

8 r t u

na r ol m mt C N MI BN i

o c

wl eu osA o

A AD 0 C

e oo T

P I 0 od vp r u t

MS Ee nR d o6 t ee f rf G

E Tr

. io K T E

t C4 pLd h o d

w I

E 8

u gp e e d t e

ur C N L

t t

L l

O U P E h rd nirer e s

c.

l D

S T s on i r ef u pt s up

s c n eA e A

t a t t t s pno d m I 3 s

v O

s c p

ans i el e u u

e C

a a 4 mrWi e rt r p a

r we 4

eo a r t r A 4

C P

R t t r mp e

sd t

t c o

t v p a e i g 7

aa t gn id

.i we n n 3 e

ano na l r f

Ui er rii U n at r

k S

l ent i n en e a C i e nn c e ge wi h e R hh euu h n ih oa Tl 2 Wt G r s T a st P m SNO X

X U

X I

E X

R X

T V

P T

P C

  • So L

M S

M J

A U

N U

N

=$S eg V

P I

P I

r E

e R

b m

R E

v 4

,Iu e

W o

! eg A

H A

H g

O N

C H

H C

P d.

e, D

N h

N I

e A

N

c.

ng 0

e 5

0 e

t 3

N A

s nt W

T n

e r 5

6 A

3 3

A O

R e

v o

/

0 0

/

p O

c E p N

N 1

P i

e 7

7 U

E L

R 8

8 N

R T

ot$" goa m =o IN UEa U

1 3

3 5

e l

s O 3fg ae g

a I

(

,E ea B

A A

B e

l ia 6

3 2

r m

  • o3 9

9 1

e n 2

2 2

0 r

cO %$o 2

e 1

sepe

o. g u

s o

" Se F

a F

F F

F eRAA 2

e 1

0 7

3 t

0 1

1 2

a 1

1 1

1 D

1 1

1 1

7 7

7 7

e t

e 8

8 8

8 s

d u ed e e wh

- e I5 o

7 8

9 0

N 2

2 2

3 I5 I

r l'

, =. ' '

hVg

~

'Af M

Tei.onen. au> 393 8000 Io*l*e'e'iI ","

Shippmgport PA 15077-0004 December 11, 1987 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Month 1y Operating Report U. S. Nuclear Regulatory Commission Director, Of fige of Management Information & Program Control l

Washington, D. C. 20555 Gentlemen:

i In accordance wi th Appendix A. Technical Specifications, the Monthly l

Operating Report is submitted for Unit 1 and Unit 2 for the month of Novembe r, 1987.

Very truly yours,

l n,

./

2 i

. D. Sieber l

Vice President l

Nuclear Operations j

i imd I

Enclosures cc: NRC Regional Of fice

/

~

j on1GI M King of Prussia, PA

'/

e-cc:' "2 fI

- - - - - - - - - - -