NARRATIVE SUMfMRY OF MONTHLY OPERATING EXPERIENCE
~
UNIT 1 NOVEMBER, 1987 9
November 1 The Unit was ope ra ting at a reduced power level of through approximately 80 percent as condenser tube cleaning in November 2 the main condenser continued. Maintenance work was completed and power ascension to 100 percent was
(
initiated at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> on the 2nd.
November 3 The Unit was in Operational Mode 1 with reactor power at through a nominal 100 percent and the Reactor Coolant System at Oc to ber 31 a normal operating pressure and temperature.
November 13 The Unit was in Operational Mode I with a power through coas tdown in progress prior to the beginning of the November 30 Sixth Refueling Outage.
The Reactor Coolant System was at a normal operating pressure and temperature.
8801040538 871130 PDR ADOCK 05000334
~
R mp
$f_
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
12/09/87 COMPLETED BY: P.A. SMITH TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: NOVEMBER 1987
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 8016.0 101544.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
720.0 7077.7 58922.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
720.0 7061.3 57392.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1762196.0 17923148.0 136447554.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
578980.0 5838960.0 43712190.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
543470.0 5481.730.0 40786533.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 88.1 59.0
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 88.1 59.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 90.4 81.9 51.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.6 19.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
SIXTH REFUELING. DECEMBER 11.1987. DURATION - 65 DAYS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A
,_,,,,N 4 COMMERCIAL OPERATION N/A N/A 2-
Sv! RACE DAALY UNIT ?oWER LIVEL
.. g.,
e
.q 1
~
occxg7 3o, M-324 LNIT I*7 5 ~ ~ ~ :
$r DATE December 11. 1%
COMPLITED BY P.A. Seith TELEPHONE
(.12 ) si 3-1825.l MONTH November DAY' AVERACE DALLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
!MWM*t)
(MWeWes t 667 37 758 2
675 gg 754
796 754 3
g, 4
800 733 20 3
800 21 742 6
013 733 g
7 808 725
,3 3
813 717 74 9
804 708 23 10 808 703 3
ll 813 p
704 12 800 688 gg 13 800
- 9 692 14 792 683 g
13 783 39 16 779 INSTRUCTIONS On this format.!sst the average d:ity unit pi.w.tr inset in MWe Net far esch day in the recueting rix.n h. c..,nnute 'u
)
the nearest whole mepwait.
l 158 t?? )
1 '-
i S
{!jI il j!
1,!.
\\!!l l
1l l
i j
l J
~
~ -
7 n
8 9
1 5
2 8
g 1
i yn 1
1 G
l i i
h t
t 3
en d sd l
t a nan u
i r
i 4
n e e 6 ae s ~
aw2 t
aml d N
4 U bm V 1
i cedt e
)
t x uenh e, t 1
S e 2
e aoent et s
P c
sd e
A.
v e
1 aI rbi ec
=
0 V e 4
I c
.s e c. N u.
h putl rn 5
B D P
(
t n
6 p
)
t pt npeo es a
c e
na omp
- e. I e
e r
s i
o rco s
e.
..l
=
O.EEyE r or s.
mf e c0 r a =. s e
r t u N MTBN e
os r 0 u l
s e.
b o
c A Al O e
nes1 o
.e e
C e
N Dl H nR hl es a h
Gc.c g i
a E
E e
I t ed nwo K i T P o
9 i
E E
&i vne t 0 w*5R e g ee CN L
t t L
d eodk 2
l *- s l
b e
e7e oI O U P E el cnrn7 h
e c n c e.
h e
D M
e,A e ooo1
- i. mnsl I
r s ~
ers cwi i
O s
v 1 8II t I
t ea st C
u e
nw nena a
r C
P eat i ce 4
5 pnancd t
emas e id c nat ner ee a
U ceht rl h
upt net t
n ed wi o
i h e0 naon e
D Tr8iMpi e
S w
N
~
o 3
t 9
H w
1 C
e E
S X
Pr r
E e
M e
"$5 ag T
ee IE b
H re R
m
. cr e
eSF r
R v
e u eed..
E o
4 st e 8
W N
I =g C
t i
n i
H t l eag O
e e.t
- a cr P
d wet. e D
M euoah nt n h
t N
I t eeACgO s :
A N
o - -
o 5
O e
sg 23459 N
M et 3
s nt A
W T
ne r
/
O R
e v o N
O O
cE p em T
F i
e e
U E
L R
is H
R s
ee 5
wn l
muo" E" goo e
i e
s NU e 3 U E.e I
t 4
n e
I.
u0 3sj s
es a
se i
c e
r l
i p
u n'e' i s
s i
c.Im t e l
B n
eA I
e e eT k.g u
e w
e eae I.
d e.
s a
n e
T Nlae s
vI e
m [$5 o o t f.
e s
)t s s g
0 ne
- m. l i
e cO, % $a estw ne e e e s nnae s
ehat ne i
er4 ed a s e ue c
- m. i eeef pr we s
s n.l c i s la e e eJ ih e
",Re afMRND A '. l a
l e
e I
S D
RABrIl f t I 2
e 1
t 0
a 1
D 1
7 l i 8
e 8
d =
- e. de a b.
I5
)
o 7
N 9
I5 7
1
/e 1
r
.i l}
l j{,
rlL
OPERATING DATA REPORT DOCKET NO.:
50 412 REPORT DATE:
12/09/87 COMPLETED BY: M.A. WINGER' 9
TELEPHONE:
(412) 643-1825 l
l OPERATING STATUS i
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: NOVEMBER 1987
- 3. LICENSED THERMAL POWER (MWt):
2660 4 NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL,*TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
327.0 327.0 327.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
221.5 221.5 221.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
205.8 205.B 205.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
517531.0 517531.0 517531.0
- 17. GROSS ELECT. ENERGY GEN. (MWH):
168900.0 168900.0 168900.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
157077.0 157077.0 157077.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 62.9 62.9 62 9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 62.9 62.9 62 9
- 22. UNIT CAPACITY FACTOR (DER): PCT
$7.5 57.5 57 5
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 37.1 37.1 37 1 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A
.08/04/87 INITIAL ELECTRICITY N/A 08/17/87 COMMERCIAL OPERATION 11/87 11/17/87 1
AVERAGE 34iLY L'.N!T ?CwER ' jet, 00CX.ET NO. _10-412 UNIT BVPS Unit 2 h
DATE _ December 11'. 19)
COMPLITED SY M*A Winger ITLIPHONE (412) 643-1825 MONT16 November DAY AYERAGE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LIVEL IMWe Net 1 i yw,.3,g 3
0 466 g7 O
0 gg 3
0 3,
0' 4
0 20 0
g.
0 g
o
~
6 0~
-115 3
7 0
675 3
g 0
785 4
9 0
810 3
10 0
- g 810 11 0
- 7 816 12 77A*
- g 822 13 796*
822
- 9 I4 816*
818 30 15 808*
3, 16 820*
- Pre-Commercial Operation Generation INSTRUCTIONS On this Turmas.!ar the acnre dalv unit nwer 23 ei.n uwe.Nei far ese.g gay.n the reou,iing muarh. C...nnuie.o the nearess whuk rnepwait, tu tTT \\ - _ - _ - - - _ _ _ _ _ _ - _ _ _ - _ _ _ - - - _ - _ _ _ _ _. _ _ _ _
l,-
b NARRATIVE SUMt1ARY OF
- ~
MONTHLY OPERATING EXPERIENCE s
UNIT 11 NOVEMBER, 1987 l
$r November 1 The Uni t was shutdown to-repair leaking ma ni fold through isolation valves on the Reactor Coolant System.
l November 9 November 10 At 1934 hours0.0224 days <br />0.537 hours <br />0.0032 weeks <br />7.35887e-4 months <br /> on the
- 10th, the reactor was taken through-c ri tical.
At 2227 hours0.0258 days <br />0.619 hours <br />0.00368 weeks <br />8.473735e-4 months <br /> on the 10th, the reactor November 11 tripped, on Lo-Lo Steam Generator Level in the "C" Steam i
Gene ra tor, after the running main feed pump tripped due to low condensate pressure.
November 12 The reactor was taken critical at 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> on the 12th through and power was escalated to a nominal value of 100% to November 16 demonstrate commercial availability.
1 November 17 Commerci al operation was declared at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on the through 17th.
At 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br /> on the 17th, the turbine tripped November 20 from 100% power due to an inadvertent thrust bear 4eg trip signal.
For approximately 5 minutes following the trip, of fsite power was lost when all four (4) KV buses tra ns ferred to offsite power then recl osed on-the de-energized onsite buses.
The Unit remained shutdown until the 21st.
November 21 At 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> on the 21st, the reactor was taken through c ri tical.
At 1513 hours0.0175 days <br />0.42 hours <br />0.0025 weeks <br />5.756965e-4 months <br /> on the 22nd, the Unit was November 24 synchronized to the grid and power was escalated to a nominal value of 85% while the "B" feedwater pump was removed from service for maintenance.
The Unit remained at a nominal value of 85% until 0605 hours0.007 days <br />0.168 hours <br />0.001 weeks <br />2.302025e-4 months <br /> on the 24th when the "B" feed pump was placed in service.
Power was then escalated to a nominal value of 100%.
November 25 The Unit operated at a nominal value of 100% output.
through November 30 l
2 e
e t
o t
a 8
v i
l f
21 r1 nm ap r
l 1 e -
a U a n
i d i
t g3 V
e o
r r e a
t ir n4 a
r et e et i p
hei6 m
hShd w
n e
2 tbW i
1 a e t
t e oga r
4Sem.)2 e
pt o
p pnp s
=
v e
e s t L rp i
0VeP c A. 4 m
o 1
i c
r y r - ei 7 r o t
i)s1 t
n S
aot r 0 ac 5EDM(
e c
e o
t Lf t 0 ec 7
m e
r t t s
a 1 b a 5
ee.
s O EEYE r o r n
n en p
8 r t u
na r ol m mt C N MI BN i
o c
wl eu osA o
A AD 0 C
e oo T
P I 0 od vp r u t
MS Ee nR d o6 t ee f rf G
E Tr
. io K T E
t C4 pLd h o d
w I
E 8
u gp e e d t e
ur C N L
t t
L l
O U P E h rd nirer e s
c.
l D
S T s on i r ef u pt s up
- s c n eA e A
t a t t t s pno d m I 3 s
v O
s c p
ans i el e u u
e C
a a 4 mrWi e rt r p a
r we 4
eo a r t r A 4
C P
R t t r mp e
sd t
t c o
t v p a e i g 7
aa t gn id
.i we n n 3 e
ano na l r f
Ui er rii U n at r
k S
l ent i n en e a C i e nn c e ge wi h e R hh euu h n ih oa Tl 2 Wt G r s T a st P m SNO X
X U
X I
E X
R X
T V
P T
P C
- So L
M S
M J
A U
N U
N
=$S eg V
P I
P I
r E
e R
b m
R E
v 4
,Iu e
W o
! eg A
H A
H g
O N
C H
H C
P d.
e, D
N h
N I
e A
N
- c.
ng 0
e 5
0 e
t 3
N A
s nt W
T n
e r 5
6 A
3 3
A O
R e
v o
/
0 0
/
p O
c E p N
N 1
P i
e 7
7 U
E L
R 8
8 N
R T
ot$" goa m =o IN UEa U
1 3
3 5
e l
s O 3fg ae g
a I
(
,E ea B
A A
B e
l ia 6
3 2
r m
- o3 9
9 1
e n 2
2 2
0 r
cO %$o 2
e 1
sepe
- o. g u
s o
" Se F
a F
F F
F eRAA 2
e 1
0 7
3 t
0 1
1 2
a 1
1 1
1 D
1 1
1 1
7 7
7 7
e t
e 8
8 8
8 s
d u ed e e wh
- e I5 o
7 8
9 0
N 2
2 2
3 I5 I
r l'
, =. ' '
hVg
~
'Af M
Tei.onen. au> 393 8000 Io*l*e'e'iI ","
Shippmgport PA 15077-0004 December 11, 1987 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Month 1y Operating Report U. S. Nuclear Regulatory Commission Director, Of fige of Management Information & Program Control l
Washington, D. C. 20555 Gentlemen:
i In accordance wi th Appendix A. Technical Specifications, the Monthly l
Operating Report is submitted for Unit 1 and Unit 2 for the month of Novembe r, 1987.