Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-2011-001, Regarding Reactor Trip on Both Units Due to Loss of Offsite Power +
- ML17317A813 +
- 05000255/LER-1990-009, :on 900516,atmospheric Steam Dump Valves Unexpectedly Opened Resulting in Automatic Auxiliary Feedwater Actuation Signal Initiations.Caused by Electrical Noise.Temporary Mod Installed to Stop Noise +
- ML19208B836 +
- ML20052F968 +
- ENS 49870 +
- WO 02-0027, April 2002 Monthly Operating Report for Wolf Creek Generating Station +
- ML20084T967 +
- ML20151G002 +
- ML20214L723 +
- 05000413/LER-1987-009-01, :on 870217 & 0310,fire Doors Discovered Propped Open.No Hourly Fire Watch Had Been Established.Caused by Personnel Error.Personnel Reminded to Keep Fire Doors Closed +
- 05000410/LER-1986-005-01, :on 861105,source Range Monitor Channel C Erroneously Left in Bypass Position Following Surveillance Check.Caused by Failure of Operator to Adhere to Procedure. Procedure Revised & Staff Counseled +
- 05000413/LER-1987-009, :on 870217,fire Watch Not Established Following Discovery of Two Fire Doors Propped Open.Caused by Personnel Error.Util Unable to Identify Responsible Personnel.Addl Door Found Open on 870310.Rept Will Be Revised +
- ML20199H175 +
- 05000254/LER-1999-004-02, :on 990521,reactor Scram Occurred.Caused by Steam Intrusion Into Scram Discharge Volume.Procedure Qcop 12200-11, RWCU Sys Startup & Pump Operation, Revised +
- 05000354/LER-1988-025, :on 880930,both Control Room Emergency Filtration Units Determined Inoperable Due to Surveillance Procedure Not Meeting Requirement of Tech Spec 4.7.2.e.3. Procedure Revised +
- 05000373/LER-1986-004-02, :on 860205,control Room HVAC Sys Ammonia Detector Tripped Spuriously.Caused by Broken Chemcassette Tape in Tape Carriage Mechanism.Chemcassette Tray Replaced & Vaporizer Concentrate Sys Declared Operable +
- 05000498/LER-1988-019, :on 880212 & 13 Unit Cooldown to Satisfy Tech Spec 3.0.3 Prematurely Terminated.Caused by Personnel Error. Addl Guidance for Determining Equipment Operability & Special Training Held +
- 05000259/LER-1988-009-01, :on 880202,standby Gas Treatment Train Actuation Occurred.Caused by Latching Relay in Train Control Logic.Investigation by Maint Organization Initiated & Logic Inspected & Found to Be Operating Properly +
- 05000341/LER-1985-048, :on 850724,reactor Bldg HVAC Failed to Start After Planned Trip.Hvac Exhaust Isolation Damper Reopened When Isolation Signal Reset Despite Exhaust Fan Trip. Response Procedure Revised +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- ML20092H085 +
- 05000317/LER-1995-002-01, :on 950616,manual Trip Occurred Due to Loss of 12 SG Feed Pump.Repaired Overspeed Trip Mechanism & Restarted Unit 1 +
- 05000373/LER-1983-121-03, /03L-0:on 831014,while Performing LOS-AA-W1, Control Rod Drive at Core Location 30-19 Indicated Overtravel When Withdrawn to Full Out Position.Caused by Excessive Crud Buildup on Filter +
- 05000353/LER-1995-001, :on 950102,actuations of Unit 1 & Unit 2 Primary Containment & Rv Isolation Control Sys (PCRVICS) Occurred Due to End of Life Fuse Failure.Fuse Replaced & Insp of PCRVICS Circuitry Performed on 950125 +
- 05000277/LER-1993-016-01, :on 931221,HPCIS Declared Inoperable During Performance of Surveillance Test.Cause Not Yet Determined. Instument Caibration Line Flushed to Clear Blockage & Back Filled.Procedures Revised +
- 05000213/LER-1993-010, :on 930629,loss of Power During Surveillance Testing Occurred Due to Blown Fuse.Blown Fuse Replaced +
- 05000293/LER-1993-014, :on 930531,automatic Scram Occurred,Resulting from Operation of Auxiliary Transformer Differential Relay During Power Ascension.Uat Phase B & C Differential Relays Left Interchanged as Investigative Aid +
- 05000458/LER-1994-006-01, :on 940414,SS Recognized That Required Frequency for Performing STP 057-3705 Had Been Exceeded. Caused by Inadequate Supervisory Methods.Corrective Action: Inhouse Tracking Process Will Be Created +
- ML20039G264 +
- ML20195G957 +
- 05000316/LER-2077-005, Re Failure of 600 Volt Buses to Be Energized by Emergency Diesel Generators Due to Personnel Error & Equipment Failure +
- 05000260/LER-1995-005-01, :on 950607,HPCI Steam Supply Valve Failed During Testing Due to Failure of HPCI Steam Supply Valve to Open During Initial Start of Flow Test.Issued Maint Work Order to Investigate & Determine Cause of Valve Failure +
- 05000400/LER-1988-007, :on 880309,several Alarms Received by Operators at Main Control Board Indicating Low Water Level in Steam Generator B.Caused by Failed Renewable Fuse.Fuse Replaced +
- 05000335/LER-1995-005, :on 950809,pressurizer PORV Inoperable Due to Personnel Error.Removed & Reassembled Pressurizer Porvs +
- 05000397/LER-1988-034, :on 880909,pipe Failure Caused by Introduction of Liquid Nitrogen Into Primary Containment Supply Purge. Inerting Nitrogen Supply Valve & Containment Supply Purge Shut to Terminate Containment Inerting +
- ML24347A166 +
- 05000293/LER-1997-016, :on 971105,recirculation Sys Loop B Pump Trip Was Noted.Caused by Sp Inadequacy.Revised Procedure +
- 05000293/LER-1989-026, :on 890830,automatic Scram Signal & Reactor Scram Resulted in turbine-generator Trip & Opening of 345 Kv Switchyard Air Circuit Breakers.Caused by Automatic Turbine Runback.Wiring to Relays Reversed +