- 05000293/LER-2013-003, Regarding Loss of Off-Site Power Events Due to Winter Storm Nemo +
- ML18158A130 +
- ML18039A591 +
- ML20011D159 +
- ML20052G556 +
- ML20078P965 +
- ML20073J987 +
- ML20097A537 +
- ML20091K481 +
- ML20140C349 +
- ML20195H194 +
- ML20247C861 +
- ML20246L848 +
- U-601430, Responds to NRC Re Violations Noted in Insp Rept 50-461/89-020.Corrective Actions:Procedure 8117.05 Revised to Address Area Radiation Monitor Interlock on Polar Crane & to Include Actions to Be Taken in Event of Alarm +
- IR 05000461/1989002 +
- 05000324/LER-1987-011-03, :on 871105,isolation of RCIC Sys Occurred Due to Spurious Actuation of RCIC Steam Leak Detection Instrumentation.Cause Unknown.Isolation Signal Reset & RCIC Sys Returned to Standby +
- 05000334/LER-1999-012, :on 990915,inoperability of Loop 1 Over Temperature Delta Temperature Function,Was Discovered.Caused by Personnel Error.Discussed with I&C Technicians.With +
- 05000412/LER-1998-012-01, :on 981101,identified That Train a Battery 2-1, Cell Number 3 Was Below TS Min Category B Allowable Float Voltage.Caused by Accumulation of Sedimentation at Bottom of Cell Jar.Cell Pairs Were Replaced.With +
- 05000395/LER-1983-140-01, /01T-0:on 831224,instrument Lines for Refueling Water Storage Tank Level Transmitters Froze. Caused by Abnormally Cold Temps.Heat Applied to Transmitters.Heat Trace Setpoint Mods to Be Completed by 840120 +
- 05000334/LER-1981-023-03, /03L-0:on 810212,w/plant Increasing Power from 75% to 80%,delta Flux Out of Target Band Alarm Received. Xenon Transient Associated W/Power Change Caused Axial Flux Difference to Temporarily Exceed Target Band +
- 05000293/LER-1993-022, :on 930910,simultaneous Loss of Preferred Offsite Power & Automatic Scram Resulting from Load Rejection Occurred.Caused by Load Rejection.Switchyard Walked Down for Evidence of Damage +
- 05000461/LER-1990-012, :on 900517,feedwater Sys Flow Channel Failed & Caused Sensed Low Feedwater Flow.Caused by Normal end-of- Life Failure for Converter.Power Converter Replaced & Preventive Maint Tasks Established +
- ML20006D728 +
- 05000311/LER-1990-033, :on 900809,isolation Signals Received from Containment purge/pressure-vacuum Relief Sys & on 900824, Second ESF Signal Occurred.Caused by Design/Equipment. Channel 2R11A Repaired +
- 05000296/LER-1998-005, :on 981014,mode Changes Not Allowed by TS 3.0.4 Were Made During Reactor Startup.Caused by TS LCO 3.0.4 Not Being Properly Applied.Training Info Memo Re Proper Application for TS LCO 3.0.4 Was Prepared.With +
- 05000269/LER-2004-004, Re Improper Overloads Installed on Control Room Ventilation Filter Train +
- 05000293/LER-1997-025, :on 971123,completion of Required Shutdown Was Noted Due to Two Inoperable Msivs.Cause of Failure of Vessel Flange Thermocouples Could Not Be Conclusively Determined. Rv Flange Thermocouples Will Be Restored +