Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317A810 +
- ML20012B363 +
- ML19308A538 +
- ML20087F133 +
- ML20083Q818 +
- ML20107K831 +
- ML20135H293 +
- 05000219/LER-1982-056, Forwards LER 82-056/01T-0.Detailed Event Analysis Encl +
- ML20199F961 +
- ML20066D322 +
- ML20214E673 +
- ML20215G857 +
- 05000295/LER-1997-015-02, :on 970724,Unit 1 EDGs & Unit 2 RHR Sys Were Declared Inoperable & Inadvertent Esg Actuation Was Noted While Performing TS Related Surveillances.Cause Is Under Investigation.Restored ESF Equipment +
- 05000498/LER-1988-058, :on 881005,automatic Actuation of Train B Control Room Envelope Ventilation Sys to Recirculation Mode Occurred.Caused by Failed Integrated Circuit Chip in ESFs Load Sequencer.Load Sequencer Reworked +
- 05000293/LER-1997-007, :on 970401,safeguard Buses Were de-energized Due to Severe Storm.Replacement of Microprocessor Control Units Installed in Voltage Regulating Transformers +
- IR 05000219/1975016 +
- 05000254/LER-1991-027-01, :on 911216,leak from Drain Valve,Water Drained Through a Floor Pipe Onto an Emergency Bus.Caused by Leak from Reactor Bldg Sys Through Manual Drain Valve Which Was Open.Drain Valve Closed +
- 05000324/LER-1994-008-02, :on 940521,dispatcher Switching Evolution Resulted in Loss of Offsite Power.Instructions for Any Planned Switching Activity at Nuclear Power Plant Will Require Dual Verification +
- 05000311/LER-1990-021, :on 900515,radiation Monitoring Sys Channel 2R12A Failed Resulting in ESF Signal Actuation for Containment Purge/Pressure Vacuum Relief Sys Isolation. Caused by Equipment/Design Concerns +
- 05000369/LER-1981-075, Forwards LER 81-075/03L-0.Detailed Event Analysis Encl +
- 05000272/LER-1979-067, Forwards LER 79-067/03L-0 +
- ML19284A716 +
- 05000400/LER-1995-011-01, :on 951105-06,reactor Trip/Si Signal Generated & Unplanned ESF Actuation Occurred During Troubleshooting. Reactor Trip Caused by Equipment Failure.Component Replaced +
- 05000400/LER-1995-011, :on 951105,reactor Trip/Safety Injection Occurred During Solid State Protection Sys Testing Due to Failure of Relay Contact & Unplanned ESF Actuation Occurred During Troubleshooting +
- 05000250/LER-1997-007, :on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps +
- 05000316/LER-1997-002, :on 970508,shutdown of Unit 2 Occurred, Resulting from Inability to Return 2 AB EDG to Svc within 72 H Allowed by TS Lco.Appropriate Administrative Actions Have Been Implemented for Individual Involved +
- 05000272/LER-2009-001, Chillers Inoperability Exceeds TS Allowed Outage Time +
- 05000440/LER-2003-001, Regarding Manual Actuation of the Reactor Protection System with All Control Rods Inserted During Testing +
- 05000296/LER-2002-001, Re Failure to Meet Technical Specification Requirements for Inoperable Primary Containment Isolation Instrumentation Due to Removal of Incorrect Temperature Switches +
- ML15224A269 +