YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-02 FOR THE MONTH OF FEBRUARY, 1979 700315 0 A3 7
,e OPERATING DATA REPORT DOCKET NO.
50-29 DATE 790312 COSIPLETED BY _L M. Siorgren TELEPIIONE 617-366-9011 X2281 OPERATING STATUS Yankee Rowe Notes
- 1. Unit Name:
- 2. Reporting Period:
February 1979 600
- 3. Licensed Thermal Power (31Wt):
185
- 4. Nameplate Rating (Gross 31We):
175
- 5. Design Electrical Rating (Net 31We):
180
- 6. Slaximum Dependable Capacity (Gross alWe):
175
- 7. Sf aximum Dependable Capacity (Net 31We):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To which Restricted. If Any (Net 31We):
- 10. Reasons For Restrictions. If Any:
[
s This alonth Yr.-to.Date Cumulative 672 1,616
- 11. Ilours in Reporting Penod
- 12. Number Of Ilours Reactor Was Critical 559.13 1,293.93 132,484.83
- 13. Reactor Reserve Shutdown llours 0
0 0-
- 14. Ilours Generator On-Line 558.48 1,292.28 128,170.28
- 15. Unit Reserve Shutdown 11ours 0
0 0
- 16. Gross Thermal Energy Generated (31Wil) 325,132 746,704 68,320,249.11
- 17. Gross Electrical Energy Generated (SIWH) 10 3. 4 91. 0__ _ _.
238.249.4 20,999,197.4 IS. Net Electrical Energy Generated (31WII) 97.264.54 223,908 19,657,788.73
- 19. Unit Senice Factor 83.1 91.3 79.9
- 20. Unit Asailability Factor 83.I 91.3 79.9
- 21. Unit Capacity Factor (Using SIDC Net) 82.7 90.4 72.5
- 22. Unit Capacity Factor (Using DER Net) 82.7 90.4 72.5
- 23. Unit Forced Outage Rate 12.6 6.5 1.7
- 24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date,and Duration of Each):
None
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITI A L ELECTRICITY CONI.\\lERCI AL OPERATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-D L' NIT Yankee Rowe DATE 790312 COMPLETED BY R.M.
Sineren TELEPHONE 617-366-9011 x2281 510NT11 Februarv, 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL D1We-Net)
(51We-Net )
174.8 I
174.9 17 2
174.8 jg 174.9 3
174 9 174 9 19 4
174.9 20 174.9 5
174.8 2]
174.9 174.9 6
174.8 77 174.8 7
23 174.8 31.2 8
174.8 24 9
174.8 0
25 10 174.8 26 0
11 174.9 27 0
17 174.8 0
73 13 174.8 79 34 174.8 30 15 174.8 33 16 174 9 INSTRUCTIONS On this format. list the average daily unit power lesel in 5tWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9177) w
/
UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 i
UNIT N A\\lE Yankee Rowe DATE 74n119 COMPLETED ilY R.
M.
Siocren REl' ORT MON' fit Fnbro irv - 1979 TELLPilONE 617-166-9011 x2281 e-.
.[ E Licensee E -r,,
b 't, Cause & Currective No.
Date g
gg g
jg5 Eveni gy M
gii,,n g oE 5
j di C ItcPort #
LE 0 yU Prevent itecorrence O
2' 2/24/79 S
33.3 B
Auto-Repaired turbine control valve matic No. 2 servo motor.
Scram 3
2/25/79 F
80.22 A
.~anual 79-09 RB CRDRVE Control Rod No. 2 stopped withdrawal at Con-Scram 42".
Reason unknown at this time.
trol' Replace drive mechanism with spare.
Rod No. 2 Inop-erabl e 1
2 3
4 1:. 1 ori cil Itcason:
Methoil:
Exlobii G - Inst ructions S. St heilnicil A l'ipnpinent Failure (Explain) 1 Manual for Piep.iration of Data It-Mainten. nice or Test N.lannal Serain.
Entry Sheets f or 1.ieensee
~
C ltctuclini, 3 Antoinatic Scrain.
Eveni llepos t (LI It) l'ile (NUltt:G.
D Itegulatory Itcstriction 4 Other (lixplain) 0161)
- l. Opciator l'iaining, & License E.xannuation it Aihnini,t alive 5
G (1pciational I e sos (l.xpl.on)
Exlot,it 1 - Sanie Sonice P8/ /7) 11 Othe s (1-' x plain )
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 790312 CO.lPLETED BY R. M.
Sjogren TELEPfiONE 617-366-9011 x2281 REPORT MONTli Februarv, 1979
SUMMARY
OF OPERATING EXPERIENCES 2/24 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> commenced a load reduction for scheduled maintenance outage.
At 0629 hours0.00728 days <br />0.175 hours <br />0.00104 weeks <br />2.393345e-4 months <br /> a reactor scram eccurred from 80 MWe.
2/25 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> the turbine was released to the Operations Department. At 1323 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.034015e-4 months <br /> a critical approach was begun and at 1509 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.741745e-4 months <br /> the reactor was critical.
At 1543 hours0.0179 days <br />0.429 hours <br />0.00255 weeks <br />5.871115e-4 months <br /> control rod No. 2 failed to move beyond 42" and group A was dropped to take the reactor subcritical.
2/26 At 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br /> a plant cooldown was commenced from = 500 F to repair No. 2 control rod.
At 1940 hours0.0225 days <br />0.539 hours <br />0.00321 weeks <br />7.3817e-4 months <br /> shutdown cooling was placed in operation.
2/27 At 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> a cooldown of the pressurizer was commenced at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> the plant was in mode 5.
2/28 At 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> the pl ant was still shutdown in operational mode 5 for No. 2 control rod repair.