Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18227A290 +
- ML050250145 +
- ML042300361 +
- ML20127C782 +
- ML20071Q773 +
- ML20066D351 +
- ML20206P598 +
- IR 05000155/1987010 +
- ML20210L497 +
- 05000414/LER-1989-001-02, :on 890112,Bussmann Fna Fuse Failure Caused Main Feedwater Control Valve Circuit to Fail to Close. Caused by Mfg & Mgt Deficiency.Fuses Replaced +
- 05000498/LER-1988-058, :on 881005,automatic Actuation of Train B Control Room Envelope Ventilation Sys to Recirculation Mode Occurred.Caused by Failed Integrated Circuit Chip in ESFs Load Sequencer.Load Sequencer Reworked +
- 05000499/LER-1997-001-01, :on 970205,main Steam Safety Valve Setpoints Discovered Outside Required Tolerance Occurred.Caused by MSSV Above & Beyond Previously Documented Setpoint Drift. Lift Setting of Five MSSV Were Adjusted +
- 05000334/LER-1996-012, :on 961006,entry Into TS 3.0.3 Occurred Due to Isolation of CR Breathing Air Pressurization Sys.Verified Crebaps Actuation Was Inadvertent & Reset Signal at Approximately 1503 Hours on 961006 +
- 05000331/LER-1992-019, :on 921119,control Bldg a Chiller Trippped & Could Not Be Promptly Restarted,Resulting in Loss of Control Bldg Air Conditioning.Caused by Low Oil Level & Pressure. Five Gallons of Oil Added to Chiller +
- 05000336/LER-1996-027-01, :on 960426,turbine Bldg Crane Not Included in NUREG-0612 Evaluation for Heavy Loads.Turbine Bldg Crane Procedures Revised +
- 05000382/LER-1985-009, :on 850320,containment Airlock Door Seal Leakage Test Not Performed within Time Frame Specified by Tech Specs.Cause Not Stated.Surveillance Performed. Containment Entry Times Posted +
- 05000461/LER-1996-004, :on 960409,inadequate Job Preparation for Preventive Maint Task on Switchyard Breaker Caused MSIV Closure & Reactor Scram.Plant Procedures Revised +
- 05000293/LER-1993-022, :on 930910,simultaneous Loss of Preferred Offsite Power & Automatic Scram Resulting from Load Rejection Occurred.Caused by Load Rejection.Switchyard Walked Down for Evidence of Damage +
- 05000298/LER-1982-004, Forwards LER 82-004/03L-0.Detailed Event Analysis Submitted +
- 05000341/LER-1989-033, :on 891207,volt-ohm Meter Connected to Incorrect Terminal,Causing Div II of Emergency Equipment Cooling Water Sys to Actuate.Caused by Personnel Error.Sys Secured & Channel Test Successfully Completed +
- 05000341/LER-1989-027, :on 891015,reactor Bldg Hvac,Control Ctr HVAC & Drywell Floor & Equipment Drain Sumps Isolated & Standby Gas Treatment Sys & Noninterrruptalbe Control Air Compressors Started.Caused by Personnel Error +
- 05000260/LER-1999-002-02, :on 990501,SRs for Single CR Withdrawal During Cold SD Were Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Applicable Plant Surveillances.With +
- 05000397/LER-1988-036, :on 881118,inconsistency Noted Between Channel Functional Test Surveillance Procedure & Tech Specs for Div 1 4.16 Kv Emergency Bus Undervoltage Degraded Voltage.Caused by Inadequate Procedure.Tech Spec Revised +
- 05000346/LER-2016-006, Potential to Trip Emergency Diesel Generator on High Crankcase Pressure +
- 05000354/LER-2002-003, Re License Condition Violation - Reactor Power & Minimum Feedwater Temperature Limits on May 13, 2002 +
- 05000370/LER-1984-009, :on 840319,reactor Trip Initiated by Steam Generator a low-low Level.Caused by Sys Fluctuations After Loop Power Supply Card Failed.Nlp Card Replaced & Loop Returned to Svc +
- 05000312/LER-1988-005, :on 880315 & 22,steam/water Transients Caused Relief Valves to Lift & Result in Discharge of Water from Letdown Sys to Reactor Bldg Sump.Caused by Pressure Spike Due to Acceleration Slug of Water +