Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49201 +
- ML072180358 +
- PLA-7310, Submits 2014 Annual Radiological Environmental Operating Report, PLA-7310 +
- GNRO-2004/00016, Annual Operating Report +
- GNRO-2003/00007, January 2003 Monthly Operating Report for Grand Gulf, Unit 1 +
- ML20086S972 +
- ML20071H462 +
- ML20154L570 +
- ML20066D322 +
- ML20247M805 +
- ML20058K863 +
- 05000293/LER-1989-023, :on 890718,manually Initiated Reactor Protection Sys Scram Signal & Reactor Scram Occurred, Resulting in turbine-generator Trip & Transfer of Electrical Loads.Procedure Re Air Ejector Revised +
- 05000311/LER-1989-006-02, :on 890329,reactor Trip Signal on Steam Generator 21 Occurred After Shutdown for Compliance W/Tech Spec Action Statement 3.7.7.b.Caused by Equipment Problems. Channel I Transmitter Recalibr +
- 05000461/LER-1989-029, :on 890714,manual Scram Initiated in Anticipation of Automatic Scram Due to Decrease in Main Condenser Vacuum.Caused by Mechanical Failure in Rubber Expansion Joint.Joint Replaced +
- 05000373/LER-1988-008-05, :on 880517,reactor Protection Sys (RPS) Bus B Tripped.Caused by Short to Ground During Jumper Installation RPS Motor Generator Set Restored to Operable Status & Rubber Boots Provided to Cover Free End of +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000282/LER-1992-013, :on 920925,main Generator Was Taken Off Line & Turbine Manually Tripped.Caused by Equipment Failure.Failed Detector Replaced & Source Range Channel 1N-31 Tested Satisfactorily +
- 05000413/LER-1992-008-01, :on 920712,unexpected ESF Actuation Occurred & Lube Oil Pump 1A1 Tripped as Pump 1A2 Being Stopped.Caused by Possible Equipment Malfunction.Addl Testing on Motor Control Ctr Circuitry Will Be Performed +
- 05000261/LER-1985-003-01, :on 850108,low Voltage Spike Occurred on Buses 4 & 9.Caused by Grounding Digital Metal Impact Monitoring Sys Through Oscilloscope to Plant Electrical Receptacle. Technician Counseled +
- 05000414/LER-1991-006-02, :on 910416,high High Steam Generator Signal Resulted in Turbine Trip & Auxiliary Feedwater Start Occurred.Caused by Inappropriate Action.Training Revised +
- IR 05000255/1981026 +
- 05000260/LER-1983-026-03, /03L-0:on 830521,during Rod Sequence Exchange, Calculated R Factor Less than R Setpoint.Caused by R Factor Calculated Out During Power Shaping Rod Moves.Rod Pattern Adjusted & Verified +
- 05000461/LER-1990-015, ;on 900816,inadvertent Shorting of Circuit Card Edge Connectors Occurred During Card Removal.Shorting Caused Isolation Signal & Half Scram.Caused by Personnel Error. Technician Counseled +
- 05000346/LER-1990-012, :on 900714,trip Setpoint for Safety Features Actuation Sys Containment Radiation Monitor RE2006 Found to Be Greater than Tech Spec Allowable Value.Caused by Use of Incorrect Method to Project Setpoint +
- 05000280/LER-1997-006, :on 970320,loss of Refueling Integrity Due to Inadequate Containment Closure Process & Verification.Fuel Movement Stopped IAW Action Statement Requirements of TS 3.10.B +
- 05000272/LER-1994-012, :on 940718,two Intentional TS 3.0.3 Entries Occurred 940718 Due to Deenergizing Arpi System for All Control Rods.Module 2C4 & Span of Module Were Adjusted & License Change Request Will Be Submitted +
- 05000397/LER-1993-008, :on 930211,determined That Logic Sys Functional Test Requirements for Emergency Bus Undervoltage Logic Not Fully Implemented.Caused by Inadequate Procedures.New Procedures Developed +
- 05000272/LER-1986-003, :on 860131,reactor Trip Occurred on Steam Generator 11 Due to Valve Partially Closing & Failure to Respond to Manual Control.Caused by Leak on Valve 11BF40 Positioner.Valve Replaced +
- 05000336/LER-1995-005, :on 950211,inadvertent Actuation of ESF Equipment Occurred.Caused by Wiring Error During Const of Cabinets Combined W/Plant Mod.Verified All Cabinets & Actuation Relay Wiring for Correct Polarity +