- ML19345F436 +
- NL-05-018, January 2005 Monthly Operating Report for Indian Point Unit 2 and 3 +
- ML19340C828 +
- 05000498/LER-1990-001, :on 900103,containment Ventilation Isolation Occurred Due to Loss of Power to Radiation Monitor Actuation Relay.Caused by Technician Lifting Power Lead. Technicians Trained & Counseled +
- ML042600282 +
- ML20097C515 +
- ML20092F425 +
- ML20071Q145 +
- ML20138Q549 +
- ML20154B096 +
- ML20149E295 +
- ML20064L167 +
- ML20247D145 +
- 05000368/LER-1985-022, Corrects Forwarding LER 85-022-00.Unit,docket & License Number Incorrectly Listed on Cover Ltr 2CAN118503 +
- 05000254/LER-1989-003-07, :on 890412,manual Reactor Scram Initiated Due to Main Turbine Bypass Valves Opening.Caused by Component Failure.Circuit Board Replaced +
- 05000352/LER-1989-031, :on 890505,scent of Wintergreen,Indicative of Carbon Dioxide,Sensed by Plant Operations Personnel in Main Control Room.Caused by Procedural Inadequacy in That No Guidance Existed for Response to Scent +
- 05000341/LER-1986-035, :on 861005,manual Reactor Trip Occurred Due to Malfunctioning Gland Sealing Steam Pressure Regulator. Pressure Regulator Controls Recalib & Torque Switches Reset +
- 05000249/LER-1986-026-03, :on 860911,drywell Oxygen Content Exceeded 4% for Greater than 24 H W/Mode Switch in Run.Caused by Personnel Error.Operating Procedures DOP-1600-5 & DOP 1600-6 Revised & Guidance Under Development +
- 05000341/LER-1988-025, :on 880719,breaker Tripped & Reactor Protection Sys Trip Sys B de-energized.Caused by Personnel Mishap.Event Will Be Included in Maint News Ltr & in Instrumentation & Controls Training Program +
- 05000259/LER-1988-013-02, :on 880328,ESF Actuation Occurred.Caused by Spike on Radiation monitor,0-RM-90-259B.Event Investigated & Equipment Returned to Standby Readiness & Radio Frequency Effect on Radiation Monitor to Be Checked +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000498/LER-1992-008, :on 920731,CVI Actuation Occurred But Radiation Monitors Did Not Indicate Any High Radiation Conditions. Caused by Momentary Variance in Current to Remote Control Unit.Module Cabinets Will Be Repaired +
- 05000374/LER-1992-003-06, :on 920323,discovered That Excess Flow Check Valve in Instrument Sensing Line Would Not Come Off Seat. Cause Not Known.Work Request Was Written to Have Mechanical Maint Dept Repair or Replace Subj Valve +
- 05000341/LER-1991-019-01, :on 911120,reactor Water Cleanup Sys Isolation Occurred Due to High Pump Room Differential Temp & Personnel Error During Sys Restoration.Caused by Failure of Nonsafety Temp Switch.Temp Switch Recalibrated +
- 05000219/LER-1995-002, :on 941106,core Alteration Was Unsupervised Due to Personnel Error in Decision Making.Reviewed & Revised error-free Refueling Plan & Related Refueling Procedures +
- ML20052B319 +
- 05000352/LER-1990-009, :on 900405,control Room Chlorine Isolation of Habitability Control Room Isolation Sys & ESF Initiated. Caused by Failure of B Toxic Gas Detector & False Signal from Untested Analyzer.Detector Replaced +
- 05000293/LER-1993-004, :on 930313,automatic Scram Occurred Resulting from Load Rejection During Severe Coastal Storm While at 100% Power.Caused by Environ Effects of Storm.Trip Settings of Main Input Circuit Breakers Increased +
- 05000293/LER-1993-005, :on 930314,an Automatic Actuation Occurred in RWCU Sys Portion of Pcis.Caused by RWCU Sys Momentary High Flow Condition.Rwcu Procedure Will Be Reviewed to Identify Any Addl Changes to Preclude Recurrence +
- 05000245/LER-1994-014, :on 940408,inadvertent ECCS Actuations Occurred During Performance of Special Procedure.Caused by Procedural Deficiency Due to Lack of Detail.Corrective Action:Guidance on Hfa Relay Was Provided +
- ML20002B334 +
- ML19340E903 +
- 05000346/LER-1980-058-01, /01T-0:on 800724,loss of Decay Heat Flow Observed Due to DH12 Going shut.DH11 Also Closed While Personnel Attempted to Restore Sfas CH4 Cabinet to Normal.Caused by Shorted Fuse Clip & Procedural Deficiency,Respectively +
- 05000346/LER-1980-057-03, /03L-0:on 800710,while de-energizing Sfas Channel 2 for Maint on Bus Y2,control Room Operator Received Decay Heat Loop 2 High Flow Alarm.Decay Heat Cooler 1-2 Discharge Control Valve DH14A Failed Open.Caused by Procedural Er +
- 05000346/LER-1980-054-01, /01T-0:on 800724,loss of Decay Heat Flow Found Due to DH12 Closing.Decay Heat Pump 1-2 Halted.Bypass Valves DH21 & DH23 Opened & Pump Restarted.Caused by Shorted Fuse Clip Due to Personnel Pulling Wires +
- 05000311/LER-1993-012-01, :on 931030,TS 3.0.3 Entered Due to Inoperability of 21 Bast Level Indication While 22 Bast Out of Svc.Caused by Design Deficiency.Design Change Installed +
- LG-14-129, Special Report - Accident Monitoring Instrumentation Inoperability +
- 05000387/LER-2010-002, For Susquehanna Steam Electric Station, Regarding Automatic Reactor Scrams Occur During Post-Modification Testing of the Digital Feedwater Integrated Control System +
- 05000265/LER-2001-001-01, Re Reactor Scram Due to Failure of Main Power Transformer +
- ML17213A544 +