U VERMONT YANKEE NUCLEAR POWER STATIuN MONTHLY STATISTICAL REPORT 81-01 FOR THE MONTH OF JANUARY, 1981 810 217 0 OD

s

~

+

i OPERATING DATA REPORT 1

DOCKEI NO, 50-271 DATE 810209 COMPLETED BY D. Bernard TELEPHONE 617-872-8100

[

Ext. 2390 OPERATING STATUS Notes

1. Unit Name:

Vermont Yankee

2. Reporting Period:

January

3. Licensed Thermal Power (NWt):

1593

4. Nameplate Rating (Gross MWe):

540

5. Design' Electrical Rating (Net MWe): 514 (Ocen) 504 (Closed)
6. Maximum Dependable Capacity (Gross MWe):

535

}

7. Maximum Dependable Capacity (Net MWe):

504

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
9. Power Level to Which Restricted,If Any(Net MWe): _

j

10. Reasons For Restrictione, If Any:

1 i

This Month-Yr-to-Date Cumulative i

11. Hours In Reporting Period 744.00 744.00
12. Number Of Hours Reactor Was Critical 744.00 744.00 sn 970 vn

+

~

0.00 0.00

[

13. Reactor Reserve Shutdown Hours

-0.00

14. Hours Generator On-Line 694.60 694.60 56,296.18
15. Unit Reserve Shutdown Hour-0.00 0.00 0.00
16. Gross Thermal Energy Generate. SE) 991.581.50 991.581.50 79,595,098.50
17. Gross E~ectrical En.ergy Generated (MWH) 331,746.00 331.746.00 26,444,593.00 j
18. Net Electrical Energy Generated (MWH) 318,032.00 11RLn17.no 25.n6s.611100

[

t

19. Unit Service Factor 93.36 o1.16 76.7s L

i

20. Unit Availability Factor o'1.16 93.36 74,7g
21. Unit Capacity Factor (Using MDC Net) 84.81' 84.81 67.83
22. Unit Capacity Factor (Using DER Net) 83.16 83.16 66.51
23. Unit Forced Outage Rate 6.64 6.64 7.30
24. Shutdowns Scheduled Over Next 6 Months (Type,-Date, and Duration of Each):

{

t

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

126.-Units In. Test Status (Prior to Commercial Operation):

Forecast =

Achieved;

~

INITIAL CRITICALITY INITIAL ELECTRICITY j

COMMERCIAL OPERATION 1

t a

0 m

w-v-w

-vw-,y,-s

,=,yy 6n v

,w g

e yry.r-,

y y-

-ev-

,y v*

+ +

w-y,w--

y m-y w

-'y-

- + +,,

9

+

  • -4

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-271 UNIT Ver-$he Y,nkee DATE 810200 i

COMPLETED BY F.

J.

Burzer TELEPHONE 802-257-7711 Ext. 137 MONTH Januarv DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1.

99 17.

13 2.

82 18.

296 3.

102 19.

397 4

317 20.

501 5.

367 21.

521 6.

455 22.

521 7.

510 23.

521 8.

504 24.

so?

9.

50s 25.

s1s 10.

357 26.

522 433 11.

27.

522 12.

28.

522 513-521 522 13.

29.

521 522 14.

30.

521 522 15.

31.

16.

505 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

ase -

a

...-m-,

=-

=.a-..

w m

i UNIT SilUTDOUNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yankee REPORT MONTl!

January.

DATE 810209 COMPLETED BY F. J. Burger TELEPil0NE _ _ _

802-257-7711 Ext. 137 i

Page 1 of 2 O

H cm m

OU "c M

License no Cause & Corrective No.

Date m

E.

Uo O'

3 11 N Event 3e E*e Action to N

$b f

[$

Report #

o.

Prevent Recurrence

)

g O

A 4

81-01 810102.

F 26.3 A

4 81-01/3L CD VALV0P MSIV 80 B's slow closure time was due to improper adjustment of the valve's (Turbin 3

.iff line closure time adjustment mechanism. The 1

reactor adjustments were corrected to comply with I

it low technical specification limits.MSIV 86 A'<1 i

iower) slow closure time was due to a broken spring in the closure time adjustment mechanism. The spring was replaced and closure time adjusted to comply with tech-nien1 specification limits.

81-02 810110 S

0 B

4 NA IIA

'IURBIN Power reduction for turbine generator.ind (Power RB CONROD control rod surveillance reduc-tioe) f 3

F: Forced Reason:

Method:

Exhibit G-Ih'structions S: Scheduled

-A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training & License Examination F-Administrative 5 ExhibitI - Same Source G-Operational Error (Explain)

-Il-OtherL(Explain) 7/80

l y

s l

a e

r g e

I end sas e e

J pi e nt nl c

I ol r oaei r

r pi i D cF u

pua t

i o

L mop cfL)

S i ce uo R

N e

e e

r r

rE e

e I

v c

t noL m

r 'I yr i

n b os sof(

a k

t e

n eI 2

t n ni S

c r

a g

/

d ao I t st) e r

Y r

/

f eri at r1 r

u set

- reo6 u

o rl c t

7 uni G a e p1 i

1 n

l5 C " R o

e I

2 aed ph e0 JU 7

o cgn t eSR t

2 m

e

- o i r C

i

&I t r

2 g

noC bP ytE b

I L n 0

e

.I a

ot i

r nR i

eC e 5

V F

8 P

i -

h rt eU h

sA v xonvN x

t e u

e a

r ant Ef EE(

E rin C

P bb e 5

OE Y

i r m NM B E vun AA N

t g TN D 0 E

E 11 g

i.

KT TP ndl y i ear CI E E rl sa ON L L DU P E al i s m)

M T eams an O

b t e

ri C

sd c mca 9 nne aSl

  1. i an r

p ccx SiE t(

ll a N

aamr U

uuoe n$O F

nnt h C

aaut uE@"0u E

MMAO M

d - - - -

o1234 h

te n

S M

o N

a$O I

i A

O n0Em I

t I

a T

n C

i UD y

m a

E r

e t

x R

a st r E

u nno R

n eep

)

e E

a cve A

n s

n

)

W J

iER N

i n

i O

L a

e a

P l

c l

l i

p ni D

T x

oL a,

N N

E i

E A

O ner

( t t&

(

M uOy$ ga i now) s c

S y0.m bit or S

ee ig r

d rl cl e N

T rT

.rn o

W R

4 uf a w

u ti r)

O O

m ]0e%

Tf et o l r snern D

P

( orap i o eivEi T

E a

.R ai a

U l

R F e rtll i

c yT aap S

a@0N A

t ngr rn7 nanort oC T

enit osi(

I 1

mel at it N

n0@8

pt el anar U

3 ninuurire u0y$O 2

ouif gemeh s q a e e pd pt aEMRROAOO sEN F

e - - - - - - - -

t a-RABCDEFGI I

e ta D

6 1

d 1

e 0

l l

1 d u 8

ed ce rh oc FS 3

o 0

0 N

FS 8

1

/

8 7

4

. i i

4

DOCKET No.

50-271 UNIT Vermont Yankee DATE 810209 COMPLETED BY F.J. Burger TELEPUONE 802-257-7711 Ext. 137 SAFETY RELATED MAINTENANCE _

Page 1 of 3 I

NATURE OF MALFUNCTION FR OR OUTACE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Reactor Recirc Pump Preventive N/A Decreasing N/A Replaced Scal.

P-18-1A MR 80-519 Secondary Seal Pressure RllR Valve V10-8]A Preventive N/A N/A N/A Repacked Vale' and Seal MR 80-1003 Welded Body-to Bonnet Joint.

Reactor Recirculation Preventive N/A N/A N/A Repacked Valve and Seal Valve V2-65B MR 80-1005 Welded Body-to-bonnet Joint.

Reacior Recire Loop "B" Corrective N/A Original Construc-Surface of Repaired by Grinding Pipe Support RR 70 MR 80-1057 tion.

Weld At Pipe to Support Joint Contains Rejectable Indications.

Control Rod Drive System Corrective N/A Updated Seismic Upgraded Upgraded Supports as Piping Supports Outside MR 80-1075 Analysis.

Original Necessary.

Containment Supports.

4" Reactor Recirculation Corrective N/A Construction Crown of Weld Repaired by Crinding Bypass Line Weld C7B MR 80-1079 Contained Rej ec table Surface Indications.

DOCKET No.

50-271 UNIT Vermont Yankee DATE 810209 COMPLETED BY F.J. Burger TELEPHONE 802-257 7711 Ext. 137 SAFETY RELATED MAINTENANCE Page 2 of 3 NATURE OF MALFUNCTION ER OR OUTACE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION 4" Reactor Recirculation Corrective N/A Construction Crown of Welds Repaired by Grinding Bypass Line Welds C7D, MR 80-1106 Contained Reject-C11, C603, C60D, and C62 fonable Surface Indications.

4" Reactor Water Cleanup Corrective LER See LER Leakage Replaced Pipe line CUW-3 MR 80-1471 80-41/3L

'4" Reactor Water Cleanup Corrective N/A Construction Nick In Pipe Repaired by Grinding lina CUW-3 MR 81-0004 MSIVsV2-80B Corrective LER See LER Slow Closure Adjusted Closure Time MR 81-0006 81-01/3L Time FBIV V2-86A Corrective LER See LER Slow Closure Replaced Parts As Necessar3 MR 81-0007 81-01/3L Time MSIV Closure Limit Switch Corrective LER Dirty L*.mit Switch Relay Did Not Cleaned and Lubricated MR 81-0008 81-01/3L Contacts.

Trip Limit Switch Reactor Water Cleanup Corrective N/A Shorted Motor Valve Would Not Replaced Valve Operator

-Velve V12-18 MR 81-0009 Open Electrically Motor Reactor Water Cleanup Corrective N/A Casket Failure Leakage Repaired by Furmanite

.lleat Exchanger MR 81-0010

DOCKET NO.

__50-271 UNIT Vermont Yankee DATE 810209 COMPLETED BY F.J. Burger i

TELEP110NE 802-257-7711 Ext. 137 SAFETY RELATED MAINTENANCE Page 3 of 3 NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Fuel Pool Cleanup Corrective N/A Blown Fuse Pump Inoperable Replaced Fuse 2

Purp P9-1A MR 81-0073 heretor Vessel Drain Corrective N/A Packling Leak Leakage Tightened Packing Velve V2-99 MR 81-0096 Reactor Water Clesnup Corrective N/A Packing Leak Leakage Tightened Packing Valve V12-22B MR 81-0125 I

I

DOCKET NO.

50-271 UNIT Vermont Yankee DATE 810209 COMPLETED BY F. J. Buruer TELEPHONE 802-257-7711 Ext. 137 REPORT MONTH January Page 1 of 2

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 83.66% of rated thermal power for the month.

Gross electrical generation was 331746 MWH, or 82.57%of design electrical capacity.

Operating Summarv The following is a chronological description of plant operations including other pertinent items of interest for the month:

1/1/81 At the beginning of the reporting period, the plant was at 24% rated thermal power due to the efforts underway for the Reactor Water Cleanup CUW-3 line repair.

At 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br /> repairs were completed and a power increase initiated.

1/2/81 At 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> a power reduction was initiated for the repair of MSIV's 86A and 80B.

At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the generator was removed from the grid. The reactor was maintained critical at low power.

1/3/81 At 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br /> repairs were completed and a power increase initiated.

At 1416 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.38788e-4 months <br /> the generator was phased on to the grid.

1/10/81 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> a power reduction was initiated for turbine generator and control rod surveillance.

At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> surveillance was completed and a power increase initiated.

i e

Page 2 of 2 1/16/81 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> a power reduction was initated for the investi-gation of turbine generator #9 bearing vibrations.

1/17/81 At 0159 hours0.00184 days <br />0.0442 hours <br />2.628968e-4 weeks <br />6.04995e-5 months <br /> the generator was removed from the grid. The reactor was =aintained critical at low power.

At 2013 hours0.0233 days <br />0.559 hours <br />0.00333 weeks <br />7.659465e-4 months <br /> repairs were ce=pleted and a power increase initiated.

1/18/81 At 0106 hours0.00123 days <br />0.0294 hours <br />1.752645e-4 weeks <br />4.0333e-5 months <br /> the generator was phased on to the grid.

1/31/81 At the end of the reporting cycle, the plant was at 99.8%

of rated ther=al power.