Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148R068 + (ML20148R068)
- NUREG-0575, Responds to ,On Behalf of Sensible Me Power,Re Published Remarks by NRC Official in Support of long-term Storage Plan at Facility.Position Reflects Generic Issue Documented in NUREG-0575 + (ML20148R077)
- ST-HL-AE-2480, Forwards Response to NRC Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs. Plant Program for Fasteners Adequately Ensures Conformance W/Matl Spec Requirements + (ML20148R080)
- ML20148R094 + (ML20148R094)
- 05000344/LER-1987-015-01, :on 870413,discovered That 10 Steam Generator Transmitters Improperly Calibr.Caused by Procedure Deficiency.Transmitters Properly Recalibr within Allowable Tolerance & Calibr Data Sheets Revised + (ML20148R099)
- ML20148R101 + (ML20148R101)
- ML20148R105 + (ML20148R105)
- ML20148R113 + (ML20148R113)
- 05000374/LER-1988-003-05, :on 880309,reactor Scram on Neutron Flux High from APRMs Occurred Due to Neutron Flux Oscillation.Caused by Personnel Error for Initial Transient & Procedural Inadequacy for Scram.Personnel Counseled + (ML20148R117)
- ML20148R119 + (ML20148R119)
- ML20148R120 + (ML20148R120)
- ML20148R125 + (ML20148R125)
- ML20148R126 + (ML20148R126)
- ML20148R144 + (ML20148R144)
- ML20148R146 + (ML20148R146)
- 05000354/LER-1988-002, :on 880213,primary Containment Isolation Valves Inoperable.Caused by Failure of Inservice Insp to Notify Control Room Personnel That Surveillance Overdue.Both Inboard & Outboard Valves Reworked + (ML20148R148)
- ML20148R153 + (ML20148R153)
- ML20148R154 + (ML20148R154)
- IR 05000461/1987039 + (ML20148R155)
- ML20148R157 + (ML20148R157)
- ML20148R158 + (ML20148R158)
- ML20148R163 + (ML20148R163)
- ML20148R164 + (ML20148R164)
- IR 05000440/1978013 + (ML20148R167)
- ML20148R170 + (ML20148R170)
- ML20148R172 + (ML20148R172)
- ML20148R173 + (ML20148R173)
- ML20148R175 + (ML20148R175)
- ML20148R177 + (ML20148R177)
- ML20148R181 + (ML20148R181)
- ML20148R186 + (ML20148R186)
- ML20148R187 + (ML20148R187)
- ML20148R188 + (ML20148R188)
- ML20148R192 + (ML20148R192)
- 05000277/LER-1987-029-01, :on 871221,primary Containment Isolation Sys Group III Isolation Occurred.Caused by Personnel Error. Isolation Signal Reset within 5 Minutes & Reactor Bldg Ventilation Returned to Normal + (ML20148R195)
- RBG-27359, Forwards Response to NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs. Encls Provide Info Requested by Action Items 1 to 6. Ltr Supersedes 880115 Response + (ML20148R198)
- ML20148R204 + (ML20148R204)
- ML20148R209 + (ML20148R209)
- ML20148R211 + (ML20148R211)
- ML20148R214 + (ML20148R214)
- IR 05000358/1978022 + (ML20148R219)
- B16559, Proposed Tech Specs Revising TS 4.6.1.1,3/4.6.1.2 & 3/4.6.1.3 & Bases Sections 3/4.6.1.1,3/4.6.1.2 & 3/4.6.1.3 Modifying List of Valves That Can Be Opened in Modes 1 Through 4 & Adding Footnote on Procedure Controls + (ML20148R227)
- ML20148R232 + (ML20148R232)
- IR 05000382/1987030 + (ML20148R241)
- ML20148R243 + (ML20148R243)
- ML20148R245 + (ML20148R245)
- ML20148R246 + (ML20148R246)
- ML20148R249 + (ML20148R249)
- ML20148R273 + (ML20148R273)
- 05000483/LER-1988-001, :on 880104,reactor Tripped on Low Steam Generator Level Oscillations During Troubleshooting of Faulty Amber Light Condition for Main Feedwater Isolation Valve.Caused by Blown Fuse.Fuse Replaced + (ML20148R276)
- 05000317/LER-1997-005, :on 970529,reactor Coolant Sys Leak Occurred. Caused by Failed Compression Fitting.Conducted Review of Compression Fitting Maint Performed on High Pressure Systems & Completed Insps of Compression Fittings + (ML20148R278)