Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138N182 + (ML20138N182)
- ML20138N183 + (ML20138N183)
- ML20138N187 + (ML20138N187)
- ML20138N188 + (ML20138N188)
- ML20138N189 + (ML20138N189)
- ML20138N190 + (ML20138N190)
- RBG-22495, Forwards Fisher Controls Intl,Inc Establishing Design Similarity to Representative Valve/Operator Prototype,Per Equipment Qualification Branch Request + (ML20138N191)
- ML20138N193 + (ML20138N193)
- U-600285, Responds to NRC Re Noncompliance Noted in Insp Rept 50-461/85-42.Corrective Actions:Sargent & Lundy Issued Rev 5 to Procedure PI-CP-034 to Address Electrical Project Engineering Div Assignment & Analysis Description + (ML20138N194)
- ML20138N195 + (ML20138N195)
- ML20138N196 + (ML20138N196)
- IR 05000498/1996006 + (ML20138N197)
- ST-HL-AE-1445, Forwards Response to Draft SER Open Items D 5.2-7,D 5.2-10 & D 5.2-11 Re Cold Overpressure Protection + (ML20138N199)
- ML20138N202 + (ML20138N202)
- ML20138N203 + (ML20138N203)
- B11832, Forwards Response to Informal NRC Question Raised During 850925 Telcon Re Steam Generator Tube Rupture Issue Related to three-loop Operation + (ML20138N205)
- ML20138N206 + (ML20138N206)
- ML20138N208 + (ML20138N208)
- ML20138N209 + (ML20138N209)
- ML20138N213 + (ML20138N213)
- B11840, Forwards Response to NRC 851022 Request for Suppl to Justification for Continued Operation of 11 Valve Motor Operators Not Yet Fully Environmentally Qualified + (ML20138N214)
- ML20138N215 + (ML20138N215)
- ML20138N217 + (ML20138N217)
- ML20138N219 + (ML20138N219)
- B11834, Forwards Response to Request for Suppl to Justification for Continued Operation Re 20 RCS Loop Resistance Temp Detectors & 14 Valve Motor Operators Not Fully Environmentally Qualified + (ML20138N222)
- ML20138N224 + (ML20138N224)
- ML20138N225 + (ML20138N225)
- ST-HL-AE-1481, Responds to Draft SER Confirmatory Items 3.5-1 Re Turbine Maint Program & 3.5-2 Re Volumetric Insp of Turbine at Second Refueling Outage.Util Will Submit Turbine Maint Program within 3 Yrs of Obtaining OL + (ML20138N226)
- ML20138N229 + (ML20138N229)
- RBG-22-501, Informs That Effect of Increasing Standby Gas Treatment Sys Fan Start Time from 30 to 40 Evaluated.Offsite Accident Dose,Control Room Habitability & Technical Support Ctr Habitability Potentially Affected + (ML20138N230)
- ML20138N232 + (ML20138N232)
- ML20138N234 + (ML20138N234)
- ML20138N237 + (ML20138N237)
- ML20138N238 + (ML20138N238)
- FVY-85-101, Informs That Util Emergency Operations Facility Fully Functional by 850916 & 840612 Confirmatory Order Item 5.C Requirement Met in Advance of Required Date + (ML20138N239)
- ML20138N240 + (ML20138N240)
- ML20138N242 + (ML20138N242)
- ML20138N243 + (ML20138N243)
- ML20138N249 + (ML20138N249)
- W3P85-3130, Notifies of Successful Completion of Qualification of Borg-Wagner Actuators Per 10CFR50.49.Design Changes Implemented to Resolve Anomalies Resulting from Prior Testing + (ML20138N252)
- ML20138N253 + (ML20138N253)
- ML20138N257 + (ML20138N257)
- ML20138N258 + (ML20138N258)
- IR 05000062/1985002 + (ML20138N259)
- ML20138N261 + (ML20138N261)
- ST-HL-AE-1442, Forwards Response to Draft SER & FSAR Item Re Review of Anticipated Operational Occurrence & Postulated Accident Analyses for All Modes.Bounding Analysis Will Be Completed. Marked-up FSAR Pages Will Be Incorporated in FSAR Amend + (ML20138N266)
- ML20138N270 + (ML20138N270)
- ML20138N272 + (ML20138N272)
- ML20138N274 + (ML20138N274)
- PNO-III-85-093, on 851029,reactor Tripped on Spurious Low Flow Signal in Primary Sys.Unit Will Remain Shut Down Until Licensee Investigation Completed & NRC Concurs W/Findings. Special Insp Team Dispatched.State of Mi Will Be Notified + (ML20138N276)
- ML20138N279 + (ML20138N279)