Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138N126 + (ML20138N126)
- ML20138N128 + (ML20138N128)
- ML20138N129 + (ML20138N129)
- ML20138N131 + (ML20138N131)
- ML20138N132 + (ML20138N132)
- ML20138N134 + (ML20138N134)
- ML20138N136 + (ML20138N136)
- ML20138N138 + (ML20138N138)
- ML20138N140 + (ML20138N140)
- ML20138N141 + (ML20138N141)
- ST-HL-AE-1466, Forwards Response to Draft SER & FSAR Items Re Chapter 7A, Item II.D.1 Concerning Relief & Safety Valves.Encl marked-up FSAR Pages Will Be Incorporated Into Future Amend Unless Otherwise Noted + (ML20138N143)
- B11831, Forwards Proprietary & Nonproprietary Supplemental Info Re, Justification for Use of W-3 Correlation For...Steamline Break Analysis, in Response to 850925 Telcon.Proprietary Version Withheld (Ref 10CFR2.790) + (ML20138N146)
- IR 05000395/1985037 + (ML20138N147)
- ML20138N148 + (ML20138N148)
- ML20138N150 + (ML20138N150)
- ML20138N153 + (ML20138N153)
- ML20138N155 + (ML20138N155)
- ML20138N160 + (ML20138N160)
- ML20138N161 + (ML20138N161)
- ML20138N163 + (ML20138N163)
- ST-HL-AE-1500, Forwards Response to Draft SER or FSAR Items Re Loose Parts Monitoring sys.Marked-up FSAR Pages Will Be Included in Future Amend + (ML20138N165)
- ML20138N166 + (ML20138N166)
- ML20138N167 + (ML20138N167)
- ML20138N172 + (ML20138N172)
- ML20138N176 + (ML20138N176)
- ML20138N178 + (ML20138N178)
- ML20138N179 + (ML20138N179)
- ML20138N182 + (ML20138N182)
- ML20138N183 + (ML20138N183)
- ML20138N187 + (ML20138N187)
- ML20138N188 + (ML20138N188)
- ML20138N189 + (ML20138N189)
- ML20138N190 + (ML20138N190)
- RBG-22495, Forwards Fisher Controls Intl,Inc Establishing Design Similarity to Representative Valve/Operator Prototype,Per Equipment Qualification Branch Request + (ML20138N191)
- ML20138N193 + (ML20138N193)
- U-600285, Responds to NRC Re Noncompliance Noted in Insp Rept 50-461/85-42.Corrective Actions:Sargent & Lundy Issued Rev 5 to Procedure PI-CP-034 to Address Electrical Project Engineering Div Assignment & Analysis Description + (ML20138N194)
- ML20138N195 + (ML20138N195)
- ML20138N196 + (ML20138N196)
- IR 05000498/1996006 + (ML20138N197)
- ST-HL-AE-1445, Forwards Response to Draft SER Open Items D 5.2-7,D 5.2-10 & D 5.2-11 Re Cold Overpressure Protection + (ML20138N199)
- ML20138N202 + (ML20138N202)
- ML20138N203 + (ML20138N203)
- B11832, Forwards Response to Informal NRC Question Raised During 850925 Telcon Re Steam Generator Tube Rupture Issue Related to three-loop Operation + (ML20138N205)
- ML20138N206 + (ML20138N206)
- ML20138N208 + (ML20138N208)
- ML20138N209 + (ML20138N209)
- ML20138N213 + (ML20138N213)
- B11840, Forwards Response to NRC 851022 Request for Suppl to Justification for Continued Operation of 11 Valve Motor Operators Not Yet Fully Environmentally Qualified + (ML20138N214)
- ML20138N215 + (ML20138N215)
- ML20138N217 + (ML20138N217)
- ML20138N219 + (ML20138N219)