Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137R444 + (ML20137R444)
- ML20137R445 + (ML20137R445)
- IR 05000241/1985001 + (ML20137R448)
- ML20137R452 + (ML20137R452)
- ML20137R453 + (ML20137R453)
- ML20137R454 + (ML20137R454)
- DD-97-04, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-97-04 Has Expired.Decision Became Final Agency Action on 970310.W/Certificate of Svc. Served on 970401 + (ML20137R456)
- 05000281/LER-1985-012-01, :on 851026,results of RCS Sample Indicated Drop in Boric Acid Concentration from 2,217 Ppm to 1,952 Ppm. Caused by Out of Calibr Flow Transmitter That Inputs to Boric Acid Integrator.Flow Transmitter Calibr + (ML20137R459)
- ML20137R460 + (ML20137R460)
- IR 05000254/1985028 + (ML20137R462)
- ML20137R463 + (ML20137R463)
- ML20137R466 + (ML20137R466)
- ML20137R468 + (ML20137R468)
- ML20137R469 + (ML20137R469)
- ML20137R471 + (ML20137R471)
- ML20137R472 + (ML20137R472)
- ML20137R474 + (ML20137R474)
- ML20137R477 + (ML20137R477)
- ML20137R478 + (ML20137R478)
- ML20137R479 + (ML20137R479)
- ML20137R485 + (ML20137R485)
- ML20137R491 + (ML20137R491)
- 05000458/LER-1986-002, :on 860101,total Loss of Offsite Power Occurred When Transformers A,B,C & D Tripped.Caused by Spurious Signals from Hand Held Radios.Shielding on Tone Relaying Equipment Being Installed + (ML20137R493)
- 05000370/LER-1985-027-02, :on 851026,reactor Tripped Due to Loss of Generator Exciter Voltage Regulator.Caused by Improperly Installed Fuse.Fuse Reinstalled.Training on Fuse Installation Will Be Developed + (ML20137R495)
- 05000529/LER-1986-001, :on 860103,source Range Monitor Channel Checks Not Performed within Max Allowable Time.Caused by Failure of Operator to Perform Test on Schedule.Step Added to Procedure to Initiate Test in Mode 6 + (ML20137R496)
- ML20137R497 + (ML20137R497)
- ML20137R498 + (ML20137R498)
- ST-HL-AE-1522, First Deficiency Rept Re Design of Guide Shoe Attachments for Supports for Insulated Small Bore Piping.Initially Reported on 851021.Test Program Initiated So That Analysis by Load Rating Can Be Performed.Next Rept Due by 860131 + (ML20137R500)
- ML20137R501 + (ML20137R501)
- 05000382/LER-1985-047, :on 851028,reactor Trip Occurred Due to Auxiliary Trip from Core Protection Calculator on High Pressurizer Pressure.Caused by Steam Leak from Suction Flange.Flange Repaired & Components Dried + (ML20137R504)
- ML20137R505 + (ML20137R505)
- 05000321/LER-1985-038, :on 851029,ESF Sys Actuated Due to Leak in Cleanup Sludge Discharge Mix Pump 1G11-CO28.Caused by Casing Crack.Sys Reset & Analyzers & Fission Product Monitors Returned to Svc + (ML20137R508)
- ML20137R509 + (ML20137R509)
- ML20137R511 + (ML20137R511)
- ML20137R513 + (ML20137R513)
- ML20137R514 + (ML20137R514)
- ML20137R518 + (ML20137R518)
- L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) + (ML20137R519)
- ML20137R520 + (ML20137R520)
- ML20137R521 + (ML20137R521)
- ML20137R523 + (ML20137R523)
- ML20137R525 + (ML20137R525)
- ML20137R528 + (ML20137R528)
- ML20137R529 + (ML20137R529)
- ML20137R532 + (ML20137R532)
- ML20137R533 + (ML20137R533)
- ML20137R537 + (ML20137R537)
- ML20137R538 + (ML20137R538)
- ML20137R540 + (ML20137R540)
- ML20137R542 + (ML20137R542)
- ML20137R544 + (ML20137R544)