Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099G336 + (ML20099G336)
- BECO-84-197, Informs That Existing Purge/Vent Related Tech Specs Per TMI Item II.E.4.2 Conform W/Model Tech Specs Supplied as Attachment 4 of .Installation of Different Valves Does Not Require Tech Spec Amend + (ML20099G339)
- ML20099G342 + (ML20099G342)
- ML20099G344 + (ML20099G344)
- 05000254/LER-1985-001-08, :on 850205,during HPCI Pump Operability Test,Hpci Turbine Could Not Be Reset from Control Room. Caused by Failure of HPCI Turbine Trip & Reset Solenoid Valves of HPCI Stop Valve.Valves Repaired + (ML20099G346)
- ML20099G358 + (ML20099G358)
- ML20099G359 + (ML20099G359)
- ML20099G361 + (ML20099G361)
- ML20099G363 + (ML20099G363)
- ML20099G365 + (ML20099G365)
- ML20099G368 + (ML20099G368)
- 05000275/LER-1985-010, :on 850205,audit Determined That 6-month Leak Test on 400-mCi Cs-137 Check Source Not Performed within Time Requirement.Caused by Incorrect Classification of Sealed Source.Applicable Records Corrected + (ML20099G369)
- ML20099G371 + (ML20099G371)
- ML20099G375 + (ML20099G375)
- ML20099G377 + (ML20099G377)
- ML20099G384 + (ML20099G384)
- ML20099G386 + (ML20099G386)
- ML20099G388 + (ML20099G388)
- ML20099G390 + (ML20099G390)
- ML20099G391 + (ML20099G391)
- ML20099G394 + (ML20099G394)
- ML20099G399 + (ML20099G399)
- ML20099G401 + (ML20099G401)
- ML20099G404 + (ML20099G404)
- ML20099G407 + (ML20099G407)
- ML20099G410 + (ML20099G410)
- ML20099G420 + (ML20099G420)
- ML20099G428 + (ML20099G428)
- ML20099G433 + (ML20099G433)
- ML20099G437 + (ML20099G437)
- ML20099G441 + (ML20099G441)
- ML20099G443 + (ML20099G443)
- ML20099G450 + (ML20099G450)
- ML20099G455 + (ML20099G455)
- ML20099G458 + (ML20099G458)
- ML20099G465 + (ML20099G465)
- ML20099G466 + (ML20099G466)
- ML20099G470 + (ML20099G470)
- 05000483/LER-1985-007, :on 850201,while Reviewing Compliance W/Generic Ltr 82-24, Environ Qualification of Electrical... & IE Info Notice 83-72 Re Environ Testing,Six Valves Discovered W/Unqualified Terminal Blocks + (ML20099G471)
- ST-HL-AE-1144, Forwards Amend 41 to FSAR for South Texas Project Units 1 & 2 + (ML20099G474)
- ML20099G479 + (ML20099G479)
- ML20099G487 + (ML20099G487)
- RBG-20239, Final Deficiency Rept DR-260 Re Piping Configuration of CRD Scram Discharge Vol Vent & Drain Lines.Initially Reported on 841203.Engineering & Design Coordination Rept P-13,042A Issued to Implement Addition of Vent Line to CRD + (ML20099G490)
- RBG-20237, Interim Deficiency Rept DR-156 Re Conductivity Cells & Conductivity Indicators Supplied by Ge.Next Rept Anticipated by 850315 + (ML20099G493)
- ML20099G496 + (ML20099G496)
- ML20099G501 + (ML20099G501)
- ML20099G503 + (ML20099G503)
- ML20099G504 + (ML20099G504)
- RBG-19365, Forwards Response to Items 1 Through 4 of 841017 Request for Addl Info Re Sheer Reinforcement Design of Reactor Shield Bldg.Encl Responses Discussed W/H Polk on 841023 + (ML20099G511)
- ML20099G519 + (ML20099G519)
- ML20099G520 + (ML20099G520)