Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083H147 + (ML20083H147)
- ML20083H148 + (ML20083H148)
- SECY-02-0107, Staff Requirements - SECY-02-0107 - Addendum to SECY-02-0074 National Materials Program Pilot Projects and SECY-01-0112 - National Materials Program Transmittal of the Final Working Group Report Presenting Options for a National Materia + (ML20083H149)
- ML20083H150 + (ML20083H150)
- ML20083H152 + (ML20083H152)
- ML20083H153 + (ML20083H153)
- ML20083H154 + (ML20083H154)
- ML20083H156 + (ML20083H156)
- ML20083H157 + (ML20083H157)
- ML20083H158 + (ML20083H158)
- ML20083H159 + (ML20083H159)
- ML20083H160 + (ML20083H160)
- ML20083H161 + (ML20083H161)
- ML20083H162 + (ML20083H162)
- ML20083H163 + (ML20083H163)
- ML20083H164 + (ML20083H164)
- ML20083H165 + (ML20083H165)
- ML20083H166 + (ML20083H166)
- ML20083H167 + (ML20083H167)
- ML20083H168 + (ML20083H168)
- ML20083H169 + (ML20083H169)
- 05000237/LER-1983-078-03, While Preparing to Lower Suppression Pool Level,Valve Lpcj 1501-3A Failed to Open Remotely.Caused by Potentiometer in Valve Control Circuitry Drifting Out of Adjustment.Device Readjusted + (ML20083H170)
- FVY-83-130, Submits Program for 10CFR61 Implementation for Review & Concurrence as Adequate Means of Implementation of Requirements on Waste Form & Classification + (ML20083H173)
- BECO-83-297, Discusses Proposed Methods of Implementing Requirements of 10CFR61 & Outlines Addl Actions Taken Prior to Shipment of Radwaste After 831227 + (ML20083H182)
- ML20083H186 + (ML20083H186)
- ML20083H192 + (ML20083H192)
- 05000328/LER-1983-179-03, /03L-0:on 831203,during Performance of SI-699.2, Monthly Equipment Rotation, Centrifugal Charging Pump 2B-B Failed to Start.Caused by Broken Microswitch. Microswitch Replaced + (ML20083H196)
- RBG-16-632, Interim Deficiency Rept DR-150 Re Insulation on Posi-Seal Intl Motor Operator Valves.Next Rept Will Be Submitted by 840402 + (ML20083H199)
- RBG-16-667, Forwards Responses to Open Items Identified in Draft SER & Response to 810805 & 1231 Requests for Addl Info.Responses Will Be Provided in Future FSAR Amend + (ML20083H205)
- RBG-16-710, Final Deficiency Rept DER-105 Re Electrical Separation Between Reactor Protection Sys & Nuclear Steam Supply Shutoff Wiring within Power Generation Control Complex. Condition Not Reportable Per 10CFR50.55(e) + (ML20083H209)
- ML20083H215 + (ML20083H215)
- ML20083H216 + (ML20083H216)
- ML20083H217 + (ML20083H217)
- ML20083H228 + (ML20083H228)
- ML20083H233 + (ML20083H233)
- ML20083H234 + (ML20083H234)
- ML20083H235 + (ML20083H235)
- 05000328/LER-1983-190-03, /03L-0:on 831211,RCS Subcooling Margin Monitor Declared Inoperable Due to Loss of P-250 Computer.Computer Halt Caused by Programmatic Error.Monitor Returned to Svc + (ML20083H238)
- ML20083H248 + (ML20083H248)
- ML20083H249 + (ML20083H249)
- ML20083H252 + (ML20083H252)
- ML20083H262 + (ML20083H262)
- 0CAN098305, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-17 & 50-368/83-17.Corrective Actions:Energy Supply Procedure (ESP) 202 Reviewed & Revised to Comply W/ AP&L-TOP-1A,effective 830901 + (ML20083H276)
- IR 05000317/2020301 + (ML20083H279)
- 05000261/LER-1983-032-03, /03L-0:on 831104,during Testing of Porvs,Valve PORV-456 Failed to Meet Required Cycle Time.Caused by Limit Switch Improperly Adjusted.Limit Switch Adjusted & Small Air Leak Repaired + (ML20083H283)
- ML20083H288 + (ML20083H288)
- RBG-16-634, Interim Deficiency Rept DR-152 Re Wire Terminations of 480-volt Gould-Brown Boveri Motor Control Ctrs.Investigation Incomplete.Next Rept Expected by 840316 + (ML20083H295)
- ML20083H305 + (ML20083H305)
- ML20083H306 + (ML20083H306)
- ML20083H309 + (ML20083H309)
- ML20083H317 + (ML20083H317)