Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-83-036, Forwards Sys 80 CESSAR Fsar,Responses to Questions on Steam Line Break Method, Per SER Confirmatory Item 14.Proprietary Responses Withheld (Ref 10CFR2.790) + (ML20069L783)
- ML20069L787 + (ML20069L787)
- ML20069L788 + (ML20069L788)
- 05000458/LER-1994-011, :on 940515,inadvertent Initiation of Div I SSW Sys Occurred Due to Procedural Ambiguity.Surveillance Procedure STP-256-3302 Revised & Briefing Re Event & Lessons Learned Being Provided for Operating Crews + (ML20069L789)
- W3P82-3175, Forwards Environ Protection Plan, App B to License CPPR-103 + (ML20069L790)
- 05000499/LER-1994-004-01, :on 940512,SG hi-hi Level (P-14) Signal Generated While Performing RTD Cross Calibrs Due to Filling SG to Approx 90% Full.Crew Briefings Discussing Event Conducted + (ML20069L791)
- ML20069L792 + (ML20069L792)
- ML20069L794 + (ML20069L794)
- ML20069L795 + (ML20069L795)
- ML20069L797 + (ML20069L797)
- ML20069L801 + (ML20069L801)
- ML20069L804 + (ML20069L804)
- 05000348/LER-1994-001, :on 940521,1A Component Cooling Pump (B-train) Failed to Start.Caused by Supply Breaker Prop Latch Spring Detachment.Esf Related 4160 Volt Breaker on Both Units Verified as Being Properly Charged + (ML20069L805)
- ML20069L808 + (ML20069L808)
- ML20069L811 + (ML20069L811)
- ML20069L814 + (ML20069L814)
- ML20069L815 + (ML20069L815)
- ML20069L824 + (ML20069L824)
- ML20069L828 + (ML20069L828)
- ML20069L830 + (ML20069L830)
- ML20069L831 + (ML20069L831)
- ML20069L832 + (ML20069L832)
- ML20069L836 + (ML20069L836)
- ML20069L837 + (ML20069L837)
- ML20069L838 + (ML20069L838)
- ML20069L839 + (ML20069L839)
- ML20069L840 + (ML20069L840)
- ML20069L842 + (ML20069L842)
- ML20069L843 + (ML20069L843)
- ML20069L846 + (ML20069L846)
- 05000387/LER-1982-036-01, /01P-0:on 821101,HPCI Isolation High Steam Line Delta Pressure Detection Instrument Settings Found Above Allowable Value Preventing Isolation Valves from Functioning.Cause Not Stated + (ML20069L849)
- ML20069L850 + (ML20069L850)
- ML20069L851 + (ML20069L851)
- ML20069L858 + (ML20069L858)
- ML20069L862 + (ML20069L862)
- ML20069L866 + (ML20069L866)
- 05000416/LER-1994-005-02, :on 940517,discovered That There Was No Clear Guidance to Close Containment Isolation Valves for Drywell Fission Product Monitor & PASS When Required post-accident. Minor Change Package Generated + (ML20069L867)
- 05000293/LER-1982-048, Forwards LER 82-048/03L-0 + (ML20069L868)
- ML20069L870 + (ML20069L870)
- ML20069L871 + (ML20069L871)
- ML20069L873 + (ML20069L873)
- ML20069L874 + (ML20069L874)
- ML20069L877 + (ML20069L877)
- 05000293/LER-1982-048-03, /03L-0:on 821006,during Qad Audit,Fire Door 153 Found Closed W/Latch Mechanism Depressed W/Tape.Caused by Personnel Error.Special Meeting Conducted on 821029 Re QA Requirements & QA Significant Deficiency Rept Issued + (ML20069L880)
- ML20069L885 + (ML20069L885)
- ML20069L887 + (ML20069L887)
- 05000331/LER-1994-008, :on 940517,determined That Testing Had Not Been Performed at Required Surveillance Frequency for Reactor High Pressure Scram Pressure Switch.Caused by Inadequate Tracking.Appropriate Half Scram Inserted + (ML20069L890)
- ML20069L893 + (ML20069L893)
- ML20069L898 + (ML20069L898)
- 05000289/LER-1982-014, Forwards LER 82-014/03L-0 + (ML20069L900)
- 05000321/LER-1994-006-01, :on 940515,HPCI Sys Removed from Svc to Repair Flow Controller 1E41-R612.Caused by Component Failure.Failed Parts Replaced & Flow Controller Satisfactorily Tested in Modes + (ML20069L901)