Text

- - - - - - _ _ _ _ - _ _ _ - - - _

s CMn ay Flm f ?, ci Q'b!? iii e UU f u:1:;n M:t r!'- 652 b l June 13,1994 UMON Eucenuc 33 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-3030

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONDILY OPERATING REPORT MAY.1994 The enclosed Monthly Operating Report for May,1994 is submitted pursuant to section 6.9.1.8 of tile Callaway Unit i Technical Specifications.

7 1

'J.D.Blosser Manager, Callaway Plant M

ll -

JDB/DEY/J 1/ TAM / hi'crd Enclosure cc: Distribution attached f

(pf 9406200255 940531

(

PDR ADOCK 05000483 l

...R__,,_

PDR

..m._.

cc distribution for ULNRC-3030 with enclos_urgs Mr. M. J. Farber, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region III 801 Warremille Road i

Lisle, IL 60532-4351 i

i Mr. L. R. Wharton (2 copics)

OITice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 Jefferson City, MO 65102

. ~ -

l 1

l I

DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 6-13-94 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the month of May.

PART B PORV AND SAFETY VALVE

SUMMARY

None l

Page 1 of 4

1 PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 l

UNIT Callaway Unit i DATE 6-13-94 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 MONTil: MAY 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL MY (MWe-Net)

_D_A_Y (MWe-Net)

I 1166 17 1157 2

1167 18 1158 3

1165 19 1159 4

1161 20 1155 5

1156 21 1154 6

1154 22 1152 7

1163 23 1147 8

1164 24 1146 9

1157 25 1149 10 1157 26 1156 11 1147 27 lj60 12 1152 28 1156 13 1154 29 1151 14 1153 30 1149 15 1153 31 1145 16 1154 Page 2 of 4

)

PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I DATE 6-13-94 COMPLETED BY L B. McInvale TELEPIIONE 314/676-3247 OPERATING STARJS (YTD) (CUM) l.

REPORTING PERIOD. MAY 1994 GROSS llOURS IN REPORTING PERIOD: 744 3623 82,788.5 2 CURRENTLY AUTilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1115 DESIGN ELECTRICAL R ATING (MWe-Net): 1171 3.

POWER LEVEL TO WillCII RESTRICTED (IF ANY)(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

TIIIS MONTil YR TO DATE Ct'Mty.ATIVE 3.

NUMilER OF IlOURS REACTOR WAS CRITICAL.

744 3,623 72,569.7 6.

REACTOR RESERVE SlitTTDOWN llOURS.

0 0

0 7.

IlOURS GENERATOR ON LJNF 744 3,589.7 71,144.8 8.

UNIT RESERVE S1IUTIX)WN IIOUR3.

0 0

0 9.

GROSS TilERMAL ENERGY GENERATED (MWII)...

2.630.033 12,597,548 239,462.636 10.

GROSS ELECTRICAL ENERGY GENERATED (MWil).... 900,321 4,329,460 81,700,583 11.

NET ELECTRICAL ENERGY GENERATED (MWil) 859,604 4,135,325 77,699,376 12.

REACTOR SERVICE FACTOR -

100.0 100.0 87.7 13.

REACTOR AVAILAlllljTY FACTOR.

100.0 100.0 87.7 14.

UNIT SERVICE FACTOR 100.0 99.1 85.9 15.

UNIT AVAILABI!JTY FACTOR -

100.0 99.1 85.9 16.

UNTT CAPACfrY FACTOR (Using MIX.').

103.6 102.4 84.2 17-UNIT CAPACrfY FACTOR (Using Design MWe)....

98.7 97.5 80.1 18 UNIT FORCED OLTTAGE RATE _

00 0.0 2.41 19 SlitTTDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATE AND DURATION OF EACll):

20.

IF SIIUr DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP: N/A Page 3 of 4

PART E UNIT SIILTDOWNS AND POWER REDL'CTIONS DOCKET NO.

50-483 e

UNTT NAME CALLAWAY UNTT I DATE 6-13-94 COMPIITED BY J. B. McInvale 1T.II.PiiONE 314/676-8247 REPORT MONTIL MAY 1994 METHOD OF TYPE SIIUTTING DOWN F: FORCED DURATION TIIE REACTOR OR

>_Q DATE S; T!!EDULED (IlOURS)

REASON REDUCING POWER CORRECTITTJACTIONSCOMMENTS i

SUM \\tARY REASON METIIOD A EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT.ORTEST 2: MANUALSCRAM C: RER'ELJNO 3: AUTOMATIC SCRAM D-REGULATORY RESTRICT 10N 4: OTIIER(EXPIAIN)

E: OPERATORTRAINING ANT)

LICENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONAI. ERROR (EXPLAIN)

II: OTilER(EXPLAIN)

Page 4 of 4